Loading...
HomeMy WebLinkAboutTIMBERLINE - INTERNATIONAL - FDP210020 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPORTING DOCUMENTATION (2) Scope of Services, Attachment A – Page 1 Opinion of Cost September 29, 2021 RE: Timberline International – Natural Habitat Buffer Zone (NHBZ) The estimated cost for material, labor for construction of the landscape and the irrigation system within the NHBZ. An estimate for annual maintenance of the NHBZ is also provided. DESCRIPTION QTY UNIT COST Irrigation of Seed Areas & Drip to Shrub Beds 19,669 SF $ 24,696.00 2’‘ Caliper Deciduous Trees 3 EA $ 1,716.00 1-1/2'‘ Caliper Ornamental Trees 1 EA $ 419.00 Evergreen Trees 7 EA $ 3,683.00 Native Trees Mixed Container 41 EA $ 2,842.00 5 Gallon Deciduous / Native Shrubs 117 EA $ 5,891.00 5 Gallon Evergreen Shrubs 8 EA $ 610.00 1 Gallon Ornamental Grasses 8 EA $ 163.00 1 Gallon Perennials Grasses 1 EA $ 17.00 Irrigated Native Grass Seed Mix & Soil Prep 15,233 SF $ 1,821.00 Irrigated Native Grass Wet Seed Mix & Soil Prep 4,436 SF $ 793.00 Rock Mulch and Weed Barrier Fabric 4 TON $ 590.00 Pro Steel Edging 60 LF $ 258.00 Erosion Control Blanket 580 SF $ 402.00 Total $ 43,901.00 Annual Maintenance $ 7,150.00 Includes; weekly mowing, trimming, weeding and irrigation monitoring. Additional maintenance costs to be determined per the Restoration and Weed Management Plan (provided by others).