Loading...
HomeMy WebLinkAboutBROTHER'S BBQ - Filed DCP-DEV. CONSTRUCTION PERMIT -Page 1 of 5 City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 21-05 Issuance Date: 02/11/2021 Project Name: UBrother’s BBQ Project AKA: Project Location: U501 S. Taft Hill Rd. Permittee: UChris O’Sullivan & Nick O’Sullivan/NCO Real Estate Company, LLC City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee BMISC210015 $ 400.00 Construction Inspection Fee BMISC210015 $ 1,254.87 Pavement Impact Fee – excavation permit $ U 0.00 Total amount due $ 15,986.79 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $U 33,573.11 Form of security deposited with the City:U (Check – BMISC210041) PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s acceptance of the constructed public improvements. (All references above to the terms “Project Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: UN/A Page 2 of 5 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will Uforfeit the permit feeU paid for this permit, whereupon the applicant must re-apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the “as-constructed” plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any construction activities on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMPs) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. The applicant also understands that at no time pollutants, especially dirt, are allowed to leave the construction site (either by drainage, wind, or track out) and that the applicant shall immediately address and correct the issue regardless of being formally directed by the City. Page 3 of 5 11. City of Fort Collins Traffic Operations must be notified prior to the installation of permanent traffic signing, symbols and striping. The developer shall place temporary tabs or tape, and/or set up a field meeting for review and approval prior to installation. 12. A permit must be obtained from the City Forester before any trees or shrubs as noted on the approved plans are planted, pruned, or removed in public right-of-way. This includes the area between the sidewalk and curb, medians, and other city property. This permit from the City Forester shall approve the location and species to be planted. Failure to obtain this permit is a violation of the City of Fort Collins Municipal Code subject to citation (Section 27-31) and may also result in replacing or relocation trees and a hold on the issuance of a certificate of occupancy. 13. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 14. Other conditions:U N/A Permittee’s acknowledgment signature: By signing this permit, I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager’s Signature: ____________________________ Date: ____________ Approval for issuance: City Engineer Approval: __________________________Date: __________________________ (Permit Issuance Date) 2/12/2021 2/12/2021 Page 4 of 5 EXHIBIT ‘A’ DEVELOPMENT PROJECT CONTACT PERSONS Project Name: BROTHER’S BBQ Name, address, phone number and email City Staff Contact Persons: Development Engineer: Spencer Smith 281 N. College Avenue, Fort Collins, CO 80524 970-221-6603 29TUsmsmith@fcgov.comU29T Construction Inspector: Jason Martin 281 N. College Avenue, Fort Collins, CO 80524 951-473-0044 29Tjmartin@fcgov.com29T Stormwater Engineering: Matt Simpson 700 Wood Street, Fort Collins, CO 80521 970-416-2754 masimpson@fcgov.com Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 970-224-6015 jschlam@fcgov.com Natural Resources: Kelly Smith 281 N. College Avenue, Fort Collins, CO 80524 970-224-6189 29Tksmith@fcgov.com Traffic Operations: Nicole Hahn 626 Linden Street, Fort Collins, CO 80524 970-224-6108 29Tnhahn@fcgov.com29T Street closures: Tom Utech 626 Linden Street, Fort Collins, CO 80524 970-221-6815 29Ttutech@fcgov.com29T Forestry: Molly Roche 413 S. Bryan Avenue, Fort Collins, CO 80521 224-616-1992 mroche@fcgov.com Page 5 of 5 Light and Power: Rob Irish 700 Wood Street, Fort Collins, CO 80521 970-224-6167 29Trirish@fcgov.com Developer’s Contact Persons: Project Manager/Owner: Chris O’Sullivan and Nick O’Sullivan NCO Real Estate Company, LLC 4645 W. Colfax Ave., Denver, CO 80204 303-831-6383 29Tpress@brothers-bbq.com29T Developer: Chris O’Sullivan and Nick O’Sullivan NCO Real Estate Company, LLC 4645 W. Colfax Ave., Denver, CO 80204 303-831-6383 29Tpress@brothers-bbq.com29T Project Architect/Planner: Nathan Hall NWH Architecture, LLC 10983 E. 28P th P Pl., Denver, CO 80238 303-514-5535 29Tnathanwhall@outlook.com29T General Contractor: Carrie Markle Williams Construction Corporation 2701 W. Mansfield Ave., Englewood, CO 80110 303-989-9009, ext. 207 29Tcarrie@wmsconst.com29T PROJECT NAME:Brothers BBQ DATE:Tuesday, January 26, 2021 DESCRIPTION (ALL PUBLIC & APPLICABLE PRIVATE* IMPROVEMENTS) UNIT OF MEASURE ESTIMATED QUANTITY (PROVIDED BY PROJECT ENGINEER) INFRASTRUCTURE CONSTRUCTION COST PER UNIT (COST ESTMATE APPROVED BY THE CITY) TOTAL ESTIMATED INFASTRUCTURE COST INSPECTION FEE PER UNIT (SET BY THE CITY) TOTAL INSPECTION FEE Sanitary Sewer System Sewer Main LF 0 $0.00 $0.00 $2.25 $0.00 Sewer Manhole EACH 0 $0.00 $0.00 $170.00 $0.00 Sewer Service Line Stub EACH 0 $0.00 $0.00 $150.00 $0.00 Sewer Main Connection/Disconnect EACH 0 $0.00 $0.00 $230.00 $0.00 Sanitary Sewer Inspection Fees $0.00 Water System Water Main LF 0 $0.00 $0.00 $2.45 $0.00 Water Connection/Disconnect EACH 0 $0.00 $0.00 $255.00 $0.00 Water Service Line Stub EACH 0 $0.00 $0.00 $150.00 $0.00 Water Valves EACH 0 $0.00 $0.00 $105.00 $0.00 Water Fitting (Bend/Tee/Cross)EACH 0 $0.00 $0.00 $85.00 $0.00 Water Meter Pit (3/4" )EACH 0 $0.00 $0.00 $130.00 $0.00 Water Meter Pit (1")EACH 0 $0.00 $0.00 $130.00 $0.00 Water Meter Pit (1 1/2")EACH 0 $0.00 $0.00 $130.00 $0.00 Water Meter Pit (2" )EACH 0 $0.00 $0.00 $400.00 $0.00 Water Meter Pit (3" )EACH 0 $0.00 $0.00 $400.00 $0.00 Water Fire Hydrant EACH 0 $0.00 $0.00 $255.00 $0.00 Water Main (Fire Line)*LF 0 $0.00 $0.00 $2.45 $0.00 Fire Line Fitting (Bend/Tee/Cross)*EACH 0 $0.00 $0.00 $85.00 $0.00 Water Inspection Fees $0.00 Public Storm Sewer System Storm Reinforced Concrete Pipe LF 0 $0.00 $0.00 $1.50 $0.00 Box Culvert LF 0 $0.00 $0.00 $2.95 $0.00 Storm Concrete Headwall/Wing Walls LF 0 $0.00 $0.00 $2.95 $0.00 Storm Chase EACH 0 $0.00 $0.00 $230.00 $0.00 Storm Inlet All Types EACH 0 $0.00 $0.00 $230.00 $0.00 Storm Manhole EACH 0 $0.00 $0.00 $170.00 $0.00 Public Storm Inspection Fees $0.00 Street System & Trenching Grading LS 0 $0.00 $0.00 Asphalt Pavement SY 0 $0.00 $0.00 $2.55 $0.00 Concrete Pavement SY 0 $0.00 $0.00 $2.55 $0.00 Curb & Gutter LF 99 $38.00 $3,762.00 $2.55 $252.45 Sidewalk**LF 354 $80.00 $28,311.11 $2.55 $902.42 Pedestrian Ramps EACH 1 $1,500.00 $1,500.00 $100.00 $100.00 Fire Access Grass Crete SY 0 $0.00 $0.00 $0.65 $0.00 Apron SY 0 $0.00 $0.00 $1.40 $0.00 Gutter Cross Pan SY 0 $0.00 $0.00 $2.55 $0.00 Drive Approach SY 0 $0.00 $0.00 $1.40 $0.00 Retaining Wall (Concrete, Masonry, Stone)LF 0 $0.00 $0.00 $2.95 $0.00 Trench - Storm LF 0 $0.00 $0.00 $2.30 $0.00 Trench - Sewer LF 0 $0.00 $0.00 $2.30 $0.00 Trench - Water LF 0 $0.00 $0.00 $2.30 $0.00 Street System Inspection Fees $1,254.87 Excavation Permit Application LS 0 $45.00 $0.00 Potholing EACH 0 $0.00 $0.00 $30.00 $0.00 Boring LF 0 $0.00 $0.00 $0.40 $0.00 Pavement Impact Fees SF 0 $0.00 Pavement Age 0 Excavation Permit Fees $0.00 TOTAL INSPECTION FEES $1,254.87 TOTAL PUBLIC INFRASTRUCTURE COST $33,573.11 * PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL INFRASTRUCTURE COST FOR BONDING ** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5' 2021-01-26