City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 21-05 Issuance Date: 02/11/2021
Project Name: UBrother’s BBQ
Project AKA:
Project Location: U501 S. Taft Hill Rd.
Permittee: UChris O’Sullivan & Nick O’Sullivan/NCO Real Estate Company, LLC
City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee BMISC210015 $ 400.00
Construction Inspection Fee BMISC210015 $ 1,254.87
Pavement Impact Fee – excavation permit $ U 0.00
Total amount due $ 15,986.79
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$U 33,573.11
Form of security deposited with the City:U (Check – BMISC210041)
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the City in the Development Agreement, that the improvements are constructed in
conformance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s
acceptance of the constructed public improvements. (All references above to the terms “Project
Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
3. Construction time restrictions: UN/A
Page 2 of 5
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 2.6.3(K) of the Land Use Code, whichever is
applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will Uforfeit the permit feeU paid for this
permit, whereupon the applicant must re-apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code are
met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted
by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and the
“as-constructed” plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and
3.3.2(C) of the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to
any construction activities on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMPs) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any land
disturbing activity begins. The applicant also understands that at no time pollutants, especially dirt,
are allowed to leave the construction site (either by drainage, wind, or track out) and that the
applicant shall immediately address and correct the issue regardless of being formally directed by
the City.
Page 3 of 5
11. City of Fort Collins Traffic Operations must be notified prior to the installation of permanent
traffic signing, symbols and striping. The developer shall place temporary tabs or tape, and/or set
up a field meeting for review and approval prior to installation.
12. A permit must be obtained from the City Forester before any trees or shrubs as noted on the
approved plans are planted, pruned, or removed in public right-of-way. This includes the area
between the sidewalk and curb, medians, and other city property. This permit from the City
Forester shall approve the location and species to be planted. Failure to obtain this permit is a
violation of the City of Fort Collins Municipal Code subject to citation (Section 27-31) and may
also result in replacing or relocation trees and a hold on the issuance of a certificate of occupancy.
13. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
14. Other conditions:U N/A
Permittee’s acknowledgment signature:
By signing this permit, I acknowledge that I am acting with the knowledge, consent, and authority
of the owners of the property (including all owners having legal or equitable interest in the real
property, as defined in Section 1-2 of the City Code; and including common areas legally connected
to or associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager’s Signature: ____________________________ Date: ____________
Approval for issuance:
City Engineer Approval: __________________________Date: __________________________
(Permit Issuance Date)
2/12/2021
2/12/2021
Page 4 of 5
EXHIBIT ‘A’
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: BROTHER’S BBQ
Name, address, phone number and email
City Staff Contact Persons:
Development Engineer: Spencer Smith
281 N. College Avenue, Fort Collins, CO 80524
970-221-6603
29TUsmsmith@fcgov.comU29T
Construction Inspector: Jason Martin
281 N. College Avenue, Fort Collins, CO 80524
951-473-0044
29Tjmartin@fcgov.com29T
Stormwater Engineering: Matt Simpson
700 Wood Street, Fort Collins, CO 80521
970-416-2754
masimpson@fcgov.com
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
970-224-6015
jschlam@fcgov.com
Natural Resources: Kelly Smith
281 N. College Avenue, Fort Collins, CO 80524
970-224-6189
29Tksmith@fcgov.com
Traffic Operations: Nicole Hahn
626 Linden Street, Fort Collins, CO 80524
970-224-6108
29Tnhahn@fcgov.com29T
Street closures: Tom Utech
626 Linden Street, Fort Collins, CO 80524
970-221-6815
29Ttutech@fcgov.com29T
Forestry: Molly Roche
413 S. Bryan Avenue, Fort Collins, CO 80521
224-616-1992
mroche@fcgov.com
Page 5 of 5
Light and Power: Rob Irish
700 Wood Street, Fort Collins, CO 80521
970-224-6167
29Trirish@fcgov.com
Developer’s Contact Persons:
Project Manager/Owner: Chris O’Sullivan and Nick O’Sullivan
NCO Real Estate Company, LLC
4645 W. Colfax Ave., Denver, CO 80204
303-831-6383
29Tpress@brothers-bbq.com29T
Developer: Chris O’Sullivan and Nick O’Sullivan
NCO Real Estate Company, LLC
4645 W. Colfax Ave., Denver, CO 80204
303-831-6383
29Tpress@brothers-bbq.com29T
Project Architect/Planner: Nathan Hall
NWH Architecture, LLC
10983 E. 28P
th
P Pl., Denver, CO 80238
303-514-5535
29Tnathanwhall@outlook.com29T
General Contractor: Carrie Markle
Williams Construction Corporation
2701 W. Mansfield Ave., Englewood, CO 80110
303-989-9009, ext. 207
29Tcarrie@wmsconst.com29T
PROJECT NAME:Brothers BBQ
DATE:Tuesday, January 26, 2021
DESCRIPTION
(ALL PUBLIC & APPLICABLE PRIVATE* IMPROVEMENTS)
UNIT OF
MEASURE
ESTIMATED
QUANTITY (PROVIDED
BY PROJECT ENGINEER)
INFRASTRUCTURE
CONSTRUCTION COST
PER UNIT
(COST ESTMATE APPROVED BY THE
CITY)
TOTAL ESTIMATED
INFASTRUCTURE COST
INSPECTION FEE PER
UNIT
(SET BY THE CITY)
TOTAL INSPECTION FEE
Sanitary Sewer System
Sewer Main LF 0 $0.00 $0.00 $2.25 $0.00
Sewer Manhole EACH 0 $0.00 $0.00 $170.00 $0.00
Sewer Service Line Stub EACH 0 $0.00 $0.00 $150.00 $0.00
Sewer Main Connection/Disconnect EACH 0 $0.00 $0.00 $230.00 $0.00
Sanitary Sewer Inspection Fees $0.00
Water System
Water Main LF 0 $0.00 $0.00 $2.45 $0.00
Water Connection/Disconnect EACH 0 $0.00 $0.00 $255.00 $0.00
Water Service Line Stub EACH 0 $0.00 $0.00 $150.00 $0.00
Water Valves EACH 0 $0.00 $0.00 $105.00 $0.00
Water Fitting (Bend/Tee/Cross)EACH 0 $0.00 $0.00 $85.00 $0.00
Water Meter Pit (3/4" )EACH 0 $0.00 $0.00 $130.00 $0.00
Water Meter Pit (1")EACH 0 $0.00 $0.00 $130.00 $0.00
Water Meter Pit (1 1/2")EACH 0 $0.00 $0.00 $130.00 $0.00
Water Meter Pit (2" )EACH 0 $0.00 $0.00 $400.00 $0.00
Water Meter Pit (3" )EACH 0 $0.00 $0.00 $400.00 $0.00
Water Fire Hydrant EACH 0 $0.00 $0.00 $255.00 $0.00
Water Main (Fire Line)*LF 0 $0.00 $0.00 $2.45 $0.00
Fire Line Fitting (Bend/Tee/Cross)*EACH 0 $0.00 $0.00 $85.00 $0.00
Water Inspection Fees $0.00
Public Storm Sewer System
Storm Reinforced Concrete Pipe LF 0 $0.00 $0.00 $1.50 $0.00
Box Culvert LF 0 $0.00 $0.00 $2.95 $0.00
Storm Concrete Headwall/Wing Walls LF 0 $0.00 $0.00 $2.95 $0.00
Storm Chase EACH 0 $0.00 $0.00 $230.00 $0.00
Storm Inlet All Types EACH 0 $0.00 $0.00 $230.00 $0.00
Storm Manhole EACH 0 $0.00 $0.00 $170.00 $0.00
Public Storm Inspection Fees $0.00
Street System & Trenching
Grading LS 0 $0.00 $0.00
Asphalt Pavement SY 0 $0.00 $0.00 $2.55 $0.00
Concrete Pavement SY 0 $0.00 $0.00 $2.55 $0.00
Curb & Gutter LF 99 $38.00 $3,762.00 $2.55 $252.45
Sidewalk**LF 354 $80.00 $28,311.11 $2.55 $902.42
Pedestrian Ramps EACH 1 $1,500.00 $1,500.00 $100.00 $100.00
Fire Access Grass Crete SY 0 $0.00 $0.00 $0.65 $0.00
Apron SY 0 $0.00 $0.00 $1.40 $0.00
Gutter Cross Pan SY 0 $0.00 $0.00 $2.55 $0.00
Drive Approach SY 0 $0.00 $0.00 $1.40 $0.00
Retaining Wall (Concrete, Masonry, Stone)LF 0 $0.00 $0.00 $2.95 $0.00
Trench - Storm LF 0 $0.00 $0.00 $2.30 $0.00
Trench - Sewer LF 0 $0.00 $0.00 $2.30 $0.00
Trench - Water LF 0 $0.00 $0.00 $2.30 $0.00
Street System Inspection Fees $1,254.87
Excavation Permit
Application LS 0 $45.00 $0.00
Potholing EACH 0 $0.00 $0.00 $30.00 $0.00
Boring LF 0 $0.00 $0.00 $0.40 $0.00
Pavement Impact Fees SF 0 $0.00
Pavement Age 0 Excavation Permit Fees $0.00
TOTAL INSPECTION FEES $1,254.87
TOTAL PUBLIC INFRASTRUCTURE COST $33,573.11
* PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL
INFRASTRUCTURE COST FOR BONDING
** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5'
2021-01-26