HomeMy WebLinkAbout214 LORIEN LN - DISCLOSURES - 10/28/2020 (7)BUILDING LEAKAGE TEST
EnergyLogic
PO Box N
Berthoud , Colorado 80513
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 206 Signature Construction TECTITE
Technician: Adrian Calderon
Project Number:
Customer: Signature Construction
Phone:
Fax:
Building Address: 214 Lorien Lane Unit 206
Fort Collins , CO 80525
Test Results at 50 Pascals:
cfm50 Airflow 842 (+/- 1.0 %)
ACH50
cfm/ft² (Surface Area) 0.2554
Leakage Areas: 84.7 in² (+/- 2.6 %) Canadian EqLA @ 10 Pa or 0.0257 in²/ft² Surface Area
44.5 in² (+/- 4.3 %) LBL ELA @ 4 Pa or 0.0135 in²/ft² Surface Area
Building Leakage Curve: Flow Coefficient (C) = 62.2 (+/- 7.0 %)
Exponent (n) = 0.666 (+/- 0.019)
Correlation Coefficient = 0.99988
Test Standard: E779-10
Test Mode: Depressurization
4 5 6 7 8 9 10 20 30 40 50 60 70
Building Pressure (Pa)
100
200
300
400
500
600
700
800
900
1000
2000
Building
Leakage
(cfm)
Depressurize ____
BUILDING LEAKAGE TEST Page 2 of 4
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 206 Signature Construction TECTITE
Building Information
Volume (ft³)
Surface Area: (ft²) 3298.3
Floor Area: (ft²)
Height (ft) 18
Year of Construction 2020
Equipment Information
Type Manufacturer Model Serial Number Custom Calibration Date
Fan Energy Conservatory Model 3 (110V) -
Micromanometer Energy Conservatory DG700
BUILDING LEAKAGE TEST Page 3 of 4
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 206 Signature Construction TECTITE
Depressurization Test:
Environmental Data
Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft)
Pre-Test 72.0 45.0
Post-Test 72.0 45.0
Average 72.0 45.0 5030.0
Data Points - Data Entered Manually (TTE 5.0.8.4)
Nominal
Building
Pressure
(Pa)
Baseline
adjusted
Building
Pressure
(Pa)
Fan
Pressure
(Pa)
Nominal
Flow
(cfm)
Adjusted
Flow
(cfm) % Error
Fan
Configuration
0.0 n/a n/a
-57.6 -57.6 249.6 935 921 -0.5 Ring B
-49.9 -49.9 207.9 854 841 0.0 Ring B
-40.6 -40.6 158.2 746 735 0.2 Ring B
-31.3 -31.3 112.5 630 621 0.7 Ring B
-18.3 -18.3 53.5 436 429 -0.4 Ring B
0.0 n/a n/a
Deviations from Standard ASTM E779-10 - Test Parameters
- An interval between building pressures exceeds 10 Pa.
- Pressurization test not included.
BUILDING LEAKAGE TEST Page 4 of 4
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 206 Signature Construction TECTITE
Comments
None