Loading...
HomeMy WebLinkAbout214 Lorien Ln - Disclosures/Blower Door Test - 10/28/2020 (2)BUILDING LEAKAGE TEST EnergyLogic PO Box N Berthoud , Colorado 80513 Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 203 Signature Construction TECTITE Technician: Adrian Calderon Project Number: Customer: Signature Construction Phone: Fax: Building Address: 214 Lorien Lane Unit 203 Fort Collins , CO 80525 Test Results at 50 Pascals: cfm50 Airflow 887 (+/- 0.7 %) ACH50 cfm/ft² (Surface Area) 0.2689 Leakage Areas: 91.9 in² (+/- 2.2 %) Canadian EqLA @ 10 Pa or 0.0279 in²/ft² Surface Area 49.1 in² (+/- 3.6 %) LBL ELA @ 4 Pa or 0.0149 in²/ft² Surface Area Building Leakage Curve: Flow Coefficient (C) = 70.4 (+/- 5.8 %) Exponent (n) = 0.648 (+/- 0.016) Correlation Coefficient = 0.99991 Test Standard: E779-10 Test Mode: Depressurization 4 5 6 7 8 9 10 20 30 40 50 60 70 Building Pressure (Pa) 100 200 300 400 500 600 700 800 900 1000 2000 Building Leakage (cfm) Depressurize ____ BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 203 Signature Construction TECTITE Building Information Volume (ft³) Surface Area: (ft²) 3298.3 Floor Area: (ft²) Height (ft) 18 Year of Construction 2020 Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) - Micromanometer Energy Conservatory DG700 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 203 Signature Construction TECTITE Depressurization Test: Environmental Data Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft) Pre-Test 70.0 46.0 Post-Test 70.0 46.0 Average 70.0 46.0 5030.0 Data Points - Data Entered Manually (TTE 5.0.8.4) Nominal Building Pressure (Pa) Baseline adjusted Building Pressure (Pa) Fan Pressure (Pa) Nominal Flow (cfm) Adjusted Flow (cfm) % Error Fan Configuration 0.0 n/a n/a -57.6 -57.6 28.9 980 968 -0.4 Ring A -48.4 -48.4 221.4 881 870 0.2 Ring B -38.7 -38.7 165.6 763 754 0.3 Ring B -32.2 -32.2 130.1 677 669 0.2 Ring B -21.6 -21.6 76.4 520 514 -0.3 Ring B 0.0 n/a n/a Deviations from Standard ASTM E779-10 - Test Parameters - An interval between building pressures exceeds 10 Pa. - Pressurization test not included. BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 203 Signature Construction TECTITE Comments None