HomeMy WebLinkAbout214 Lorien Ln - Disclosures/Blower Door Test - 10/28/2020BUILDING LEAKAGE TEST
EnergyLogic
PO Box N
Berthoud , Colorado 80513
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 102 Signature Construction TECTITE
Technician: Adrian Calderon
Project Number:
Customer: Signature Construction
Phone:
Fax:
Building Address: 214 Lorien Lane Unit 102
Fort Collins , CO 80525
Test Results at 50 Pascals:
cfm50 Airflow 553 (+/- 0.5 %)
ACH50
cfm/ft² (Surface Area) 0.1966
Leakage Areas: 56.7 in² (+/- 1.4 %) Canadian EqLA @ 10 Pa or 0.0201 in²/ft² Surface Area
30.0 in² (+/- 2.3 %) LBL ELA @ 4 Pa or 0.0107 in²/ft² Surface Area
Building Leakage Curve: Flow Coefficient (C) = 42.7 (+/- 3.7 %)
Exponent (n) = 0.655 (+/- 0.010)
Correlation Coefficient = 0.99996
Test Standard: E779-10
Test Mode: Depressurization
4 5 6 7 8 9 10 20 30 40 50 60 70
Building Pressure (Pa)
100
200
300
400
500
600
700
Building
Leakage
(cfm)
Depressurize ____
BUILDING LEAKAGE TEST Page 2 of 4
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 102 Signature Construction TECTITE
Building Information
Volume (ft³)
Surface Area: (ft²) 2813.5
Floor Area: (ft²)
Height (ft) 10
Year of Construction 2020
Equipment Information
Type Manufacturer Model Serial Number Custom Calibration Date
Fan Energy Conservatory Model 3 (110V) -
Micromanometer Energy Conservatory DG700
BUILDING LEAKAGE TEST Page 3 of 4
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 102 Signature Construction TECTITE
Depressurization Test:
Environmental Data
Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft)
Pre-Test 70.0 46.0
Post-Test 70.0 46.0
Average 70.0 46.0 5030.0
Data Points - Data Entered Manually (TTE 5.0.8.4)
Nominal
Building
Pressure
(Pa)
Baseline
adjusted
Building
Pressure
(Pa)
Fan
Pressure
(Pa)
Nominal
Flow
(cfm)
Adjusted
Flow
(cfm) % Error
Fan
Configuration
0.0 n/a n/a
-58.6 -58.6 108.9 620 613 -0.2 Ring B
-51.6 -51.6 92.3 571 564 -0.1 Ring B
-42.2 -42.2 71.4 503 497 0.4 Ring B
-31.1 -31.1 47.3 410 405 -0.0 Ring B
-21.5 -21.5 29.0 322 318 -0.1 Ring B
0.0 n/a n/a
Deviations from Standard ASTM E779-10 - Test Parameters
- An interval between building pressures exceeds 10 Pa.
- Pressurization test not included.
BUILDING LEAKAGE TEST Page 4 of 4
Date of Test: 10/28/2020 Test File: 214 Lorien Lane Unit 102 Signature Construction TECTITE
Comments
None