'� NA. Incorporated
-,I"\1\,I./II/`I,\`■ /` / 9 / 6 / / �% 213 Linden Street
J ` ` ` I ('P J Suite 200
• 970.225.9099
CONSTT�RUCTION CONFORMANCE LETTER info®jvajva.com
June 29tb, 2020 ( -% — 20 1) ' www.jvajva.com
Empire Carpentry LLC
PO Box 245
Bellvue, CO., 80512
Re: Gould/Sternlieb Detached Garage (623 West Mountain Avenue)
Fort Collins, Colorado
JVA Job Number #19994
Dear Rick:
JVA Inc. designed the structure for the subject garage addition and has also subsequently been involved
with Empire LLC during the Construction Administration Phase of the Project. We have physically visited
the Project site once, and you have routinely been in contact with us supplying progress updates
accompanied by photos. Our visit and your photos cover the following items:
1) Reinforcing steel in concrete footings and stem walls.
2) Wall framing.
3) Level 2 floor framing.
4) Roof framing.
B O U L D E R F O R T C 0 L L I N 5 W I N T E R P A R K G L E N W 0 0 D S P R I N G S D E N V E R
623 West Mountain Avenue
``J. ►l` �/il `�► Fort Collins, CO., 80524
6/29/2020
2 of 2
Based on our Field Observation and frequent communications with Empire LLC, we believe that
construction conforms to the intent of the construction documents. JVA Inc. takes no exceptions to the
structural components of the Garage Addition.
Please let us know if we can be of further assistance on this Project, or other Projects.
Sincerely,
JVA, Inc.
00
U
L/
��*By: 6/29/2020
Steve Carpenter, PE, LEED AP
Principal