Loading...
HomeMy WebLinkAbout421 STOVER ST - APPLICATIONS - 6/14/2019P30 City of Planning, Development, & Transportation Services Flirt CollinslCommunity Development & Neighborhood Services 281 North College Avenue Fort Collins, CO 80524 Main: 970.416.2740 Fax: 970.224.6134 OVER-THE-COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning ❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log ❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic ❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and manufacturer). Complete all applicable Inf ormation on the application. Incomplete applications will not be accepted. Application A q ' -a Date For office use only b 19W `�A- (�r Job Site Address (required) Value of Construction (labor, materials, profit) ,42A S c) 0 ev- r)� &7 P, Property Owner Name Address City/State Zip , Phone e /- y-o I ; a , Applicant Name 4 Address City/State Zip Phone S r ('e ; IZ Contractor Address City/State Zip L27 C Phone s e rez' ticc�If d� (-�I (°� t�o�yS && ��Sa Contractor City of Ft. Collins Sale ax # Are you paying taxes here or by report? ❑ Here ❑ Report Sales tax number is required by allconbactors. Are you paying with your trust account? ❑ Yes ❑ No Is this a residential or commercial project? Residential ❑ Commercial If residential, is it: `Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex ❑ Multifamily (apartment) Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building 50 years of age or more? ❑ Yes ❑ No If yes, you may need to contact Historic Preservation If this is for a demolition permit, what year was the building constructed? Description of work � 410 p I ug Lo S I� S24 ylrn l� *If lawn sprinkler/backAow pr, enter, must list licensed plumber. If first-time A/C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license # Electrician Plumber Mechanical Roofer Other I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Applicant: ,Q� Print Name: J20A "`"r SSfe'- Signature Date 2% Revision date 2/6/2017