HomeMy WebLinkAbout1809 N College Ave - Applications/Reroof - 04/04/2019City of
Fort Collins
Planning, Development & Transportation
281 N. College Ave P.O. Box 580
Fort Collins, CO 80524
Phone 970-416-2740 Fax 224-6134
OVER-THE-COUNTER PERMITS ONLY
This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning
❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log
❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic
❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and
manufacturer).
Complete all applicable infojr/maation on the application: Incomplete applications will not be accepted.
Application # D � fol VI Date
For lfice use only $, <S6'. y6(s-- 6 r
Job Site Address (required)
Value of Construction (labor, materials, profit)
J�o c,Ile A
co -
Property Owner Name Address
City/State 7Zb Zip
Phone
Na Ou,1 Zd N
Call , Ave- C irms Co
�Q-
Applicant Name Address
City/State Zip
Phone
Contractor Address
City/State Zip
Phone
i ie rs� `e ed )2cr�JY61a S�
i- RL a �co
C'
o � r
Contractor City of Ft. Collins Sales Tax #
Are you paying taxes here or by report?
❑ Here
❑ Report
Sales tax number is required by all contractors.
Are you paying with your trust account?
❑ Yes
❑ No
Is this a residential or commercial project? ❑ Residential ff Commercial
If residential, is it: ❑ Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex
❑ Multifamily (apartment) ❑ Garage
If commercial, is it: ❑ Bank ❑ Bar ❑ Church 5Kotel/Motel ❑ Medical office ❑ Office ❑ Retail
❑ Restaurant ❑ Other (explain)
Is this building 50 years of age or more? ❑ Yes ❑ No Ifyes, you mayneed to contact Historic Preservation
If this is for a demolition permit, what year was the building constructed?
If prior to 1975, you will need an asbestos assessment to submit with this application.
Description of work
*If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician.
Subcontractors: List the company name or City of Ft Collins license #
Mechanical Roofer 'k—
Electrician
Other
I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to
comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a
permit is not valid until it has been paid and issued.
Applicant: `��
Print Name: �iior4 Signat to _)c'