Loading...
HomeMy WebLinkAbout808 W PROSPECT RD - CO/LOC - 8/11/2017City Of Community Development & Neighborhood Services Fort Collins . College Ave For Collins,O80 Fort Collin, CO 8og22 970.221.676o 970.224.6134 -fax Temporary Certificate of Occupancy Permit #: B1604165 Work Description: NEW 50, 855 SQ FT OF RESIDENTIAL MULTI -FAMILY DWELLING UNITS (61 UNITS) AND 5087 SQ FT (OFFICE,CONFERENCE ROOM, STORAGE LOCKERS, MEDIA, AND FITNESS ROOM) CONTAINING THREE FLOORS AND FINISHED BASEMENT, AND COMMON AREAS/STAIRS ON EACH FLOOR. CITY WATER - ENERGY COMPLIANCE PRESCRIPTIVE. ELECTRONIC PLAN SUBMITTAL. JOB CONTACT: AUDIE WILSON 307-248-3190. REQUIRES THE INSTALLATION OF AN APPROVED LEAD-FREE REDUCED PRESSURE ASSEMBLY BACKFLOW PREVENTER ON THE MAIN WATER SERVICE LINE IMMEDIATELY AFTER THE WATER LINE ENTERS THE BUILDING. CORRECT BACKFLOW DEVICES ALSO REQUIRED ON FIRE LINE AND IRRIGATION SYSTEM. NORM MILL NMILL@FCGOV.COM 970-416-2249 —1 �� F 1 F7 This is to certify that the building, structure�c inspected and temporary occupancy is(hereb, following regtiirements�being completed and Collins, —CO Ras been_ nditiona,l upon'the C Bldg Dept Req Docs Rcvd,Requirements to be Completed-B :-09/11/2017_' � � L1 Y 08/112017 WOK for TCO. Elevator is to remain locked and inaccessible until State elevator inspection reports is received and approved by Building Services. See 08111/2017 commentsfor othother,doaimentation needed for_CO. Fire Authority Final Re4uireemments to be Completed.By:-08/18/2017 08/112017 Outstariding:-EERC, standpipe caps`Knox keys, fire lane signs at 808 W PROSP effective on Qkft on final inspection Soil Prep Certification Requirements to be Completed By: 09/11/2017 08/11/2017 TCO 0 month per Jesse Schlam. WWW G.1ackflow F' al equirements to be Completed By: 08111/�0q on final irrigation backflow preventer to be installed and tested. Norm Mill 970-416-2249 nmill@fcgov.com Contractor/Owner/Lessee i Authorized By: Date Date of Issuance: 08/11/2017 NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City UU14 service in the owner's name. Construction power rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. 08/112017 03:08:27 PM Page 1 of 2 City of Community Development & Neighborhood Services Fort Collins 281 Collins,O80 . College Ave Fort Collin, CO So522 970.221.676o 970.224.6134 -fax WWW Irrigation Final Requirements to be Completed By: 09/29/2017 08/1 WOW Audie Wilson with Delta Construction Zoning Final Requirements to be Completed By: 08r112017 Hold C/o for painting of electric meters, vents, and flues to match building finish sidewalk connections to the property to the east and the north, finish seating walls and trash enclosure, install fencing and gates. Remove any unpennitted signs. Building Insp Completed Requirements to be Completed By: 09/11/2017 08/11/2017 o.k. for TCO. for final need to install access panel in bath lid of unit b06. Need to tie roof drains into the sdr35 drain line on the exterior. need to complete the two final window well panels for the small ones on the north side. south foundation is exposed and needs to be graded. Need to resolve the expansion tank located on the hot water side of the water tank. If such work is not completed within the time set forth above and approved on final inspection, or unless the time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for-occ pying the building, structure, or landwithout a Certificatelof Occupancy will be I I I -�, > I l i a i i issued. Such violation is subject to a.maximum fine of $1000.00 per day-forday of violation. i CE� Contractor/Owner/Lessee Authorized By: ,P/1/?7 Date Date of Issuance: 08/11/2017 NOTE: The issuance of this temporary certificate of occupancy will entitle the ownerto place City Utility service in the owner's name. Construction power rates may be substantially higher than the rate. to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. 08/112017 03:08:27 PM Page 2 of 2