Loading...
HomeMy WebLinkAbout866 SANDY COVE LN - SPECIAL INSPECTIONS - 1/31/2018EARTH ENGINEERIG COMPANYN NC. January 31, 2018 Marisa Basta Brown (mbastabrown(a�comcast.net) 1224 Parkwood Drive Fort Collins, CO 80525 Re: Caisson Observation 866 Sandy Cove Lane Fort Collins, Colorado EEC Project No. 17-01-143 Ms. Brown: As requested, on January 23', 2018, Earth Engineering Company, Inc. (EEC) personnel provided construction observation services for the referenced project. On that date, drilled pier foundations were being constructed for the residence at the referenced address. Construction observation services were provided by EEC personnel on a part-time basis and included observations of the pier drilling operation and observation of pier steel reinforcement. Results of the field observations completed by EEC personnel during the referenced period are included with this report. On January 23`d, 2018, EEC personnel observed the drilling operations for the caisson foundations for the residence under construction at the referenced address. Items observed by EEC personnel included plumbness of the drilled shafts, stratification of soils and bedrock encountered, caisson length, cleanliness of the bearing surface and difficulties encountered during excavation. The materials encountered in the pier borings observed in the garage and basement excavation areas consisted of brown sandy clay soils underlain by brown sandy claystone bedrock at a depth of approximately 3 to 7 feet which extended to the depths explored. The piers were drilled a minimum of 22 feet in length with a minimum penetration of 15 feet into bedrock. The pier hole bottoms appeared relatively clean with water infiltration observed in some of the piers at the time of our observations. The drilled shafts observed appeared plumb, were approximately 10 inches in diameter and extended to a depth of approximately 22 feet at various locations. At the time of our observations, 3 #6 bars were being placed in each caisson excavation and concrete was being placed. The observed pier excavations appeared to be in general accordance with the construction plans prepared by Weeks & Associates, Project No. 217222, dated November 8, 2017. P.O. Box 271428, Fort Collins, CO 80527 phone: 970.775.2004 fax: 970.663.0282 q Earth Engineering Company, Inc. EEC Project No. 17-01-143 January 31, 2018 Page 2 We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company, Inc. cc: Doug Sinclair (dougna,designingstructures.com) walam5 S El SSOC2ElT122S STRUOTURAL ENGINEF_RS January 26, 2018 Doug Sinclair 723 E 51" Street Loveland, Colorado 80537 Re: Foundation Wall Steel 866 Sandy Cove Lane Fort Collins, Colorado Project No. 217222 Gentlemen: On January 26`", 2018, a representative of Weeks & Associates observed foundation wall steel at the referenced site. Observations indicate the foundation steel reinforcement and void form placement is in substantial accordance with the engineered foundation plan for the project by Weeks & Associates. In addition, the electrode had been placed in accordance with the recommendations by NEC. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. 230'1 2 Patrick Sanders, E.I.T. G ry Weeks, P.E. 9' Staff Engineer S ructu lo.Tngineer 4730 South College Ave, Suite 201. Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622