Temporary Certificate of Occupancy
Permit #: B1504207
Work Description: CONSTRUCTION OF A NEW 121,767 TOTAL SQ. FT. BUILDING (BUILDING 3) CONTAINING
23,643SF IN ONE STORY ADJOINED TO A 98,124SF THREE STORY COMBINED
NON -HAZARDOUS CLEAN ROOM TESTING SPACE AND OFFICE, STRUCTURAL STEEL
CONSTRUCTION FOR "AVAGO TECHNOLOGIES". THIS PERMIT ALSO INCLUDES AN ON
GRADE LINK FROM BUILDING 1 (EXISTING BUILDING) AND A CONNECTING BRIDGE TO
BUILDING 4 (EXISTING BUILDING).
This is to certify that the building, structure, or land located at 4380 ZIEGLER RD, BLDG 3 Fort Collins, CO has
been inspected and temporary occupancy is hereby authorized, effective on 01/03/2017 and conditional upon the
following requirements being completed and approved upon final inspection.
Bldg Dept Req Docs Rcvd,Requirements to be Completed By:
'01AM17 Received: Special inspection required on welding; bolting; elevator,structural masonry 8 foundation.
FBuilding air tightness test 8 commissioning not'required perapproved variance letter)
Need: Hvactest and balance report.`_] � cc:
rr
Rineniremer
t. L be completedleted B \: 0Fire Authority
4�/28/20�1�7
Pe122MW16 rmail(�
WWW Irrigation Final Requirements to be Completed By: 03/29/2017
Zoning Final Requirements to be Completed'By: 01/22/2017
1222/1016 TCO ok HOId CO for_1..Parking lot striping 2. Removal of Construction fencing 3. Removal of Port-o-lets 4. Removal of
construction debris 5. Removal of construction trailers
Building Insp Completed Requirements to be Completed By:
12222016 Complete landings from temporary to permanent.
If such work is rl corn let within the time set
Contractor/ essee
Authorized By:
forth above and a proved on final inspection, or unless the
Date
Date of Issuance: 01/03/2017
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owner's name. Construction power rates
may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owners name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.
01/032017 01:01:25 PM Page 1 of 2
�of
t Collins
Community Development & Neighborhood Services
281 N. College Ave
Fort Collins, CO 80522
970.221.676o 970.224.6134 -fax
time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a
violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be
issued. Such violation is subject to a maximum fine of $1000.00 per day for every day of violation.
Contractor/Owner essee
Authorized By:
4�
Date
Date of Issuance: 01/03/2017
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owners name. Construction power rates
may be substantially higher than the rate to which the Omer is entitled. Until the owner contacts the City Utility Olfice and makes the necessary arrangements to
transfer City Utilities to the owners name, utilities will continue to be fumished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.
01/=017 01:01:25 PM Page 2 of 2