Loading...
HomeMy WebLinkAbout6903 ENTERPRISE DR - DISCLOSURES - 12/26/201831 r- - C�P-"%Yg owl City of Fort Collins Residential Mechanical Systems Performance Report Updated 3f7/2014 This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools City of and testing techniques, see the "Residential New Construction Mechanical Systems Testing Guide." The guide and Fort Collins this form may be periodically updated; check the Building Services web site for the current version. This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O. Color key y�urtz+'' Measuredvalue '' " x, rfarget z f to compare with Pass 1 Ea 1 � a Guhon ; Other. a o (imAty target or hmift 3 E t data ADCF = Air Density Correction Factor, based on tool, ADCF altitude (5000% air temperature through tool Volumetric flow (CFM 5000') = ADCF x Indicated flow (CFM) , • ' yii` Yt. ^ f,ryNs, Yx' I� {.S • � J\�,41> Y' \ . S't 1' ALC : c SI,F� ' ii S^11..1.'[ 4.. •:.. �,: Address Date of "Residential 3u f Q Mechanical Systems >,x ' Design Submittal l Bwlder LLO KA V l-(ov.y� Information referenced "« HVAC contractor ' '" I, ......... testing technicians. by g cins 14't1 >t GtD (iGA =.. y ..: . As -built ch meth design Testingdate(s)Z1.y ?;, •cal-Exhaust(Spot'Ventilationy Bath exhaust Flow Flow box Potot tutie duct traverse tool Passive flow hood; Other{no`.te below) Air temp through tool (F) ?0 Testing tech (initials)MD ADCF Kitchen exhaust NIA - hood does not vent to outside Testing tech (initials) t' Oven fuelIN Gas .❑ Electric Minimum airflow requirement (CFM 5000') + operation ' OO;IntertniW.a 25 traRtmu s# Measured airflow Flow Flowboz Pitottubetraverse Tool—Intenorgrille Air temp tool Passive flow hood ❑Flow grid 2 E� haunt dudt through 'e ADCF ( O rr Powered flow hood Other. note below location ( ) (ExtenortertninatlonnotOK) tool(F) Indicated flow 34R5 CFM Volumetric flow y30 CFM 5000' Pass Fail Testing notes Residential Mechanical Design Submittal V20140307 Page 1 Systems other than sub -structural floor exhaust Testing tech (initials) Code -minimum ventilation airflow Design ventil-';-- (based on CFA and # of BR) CFM 5000' ai fl O o CFM 5000' System type Balanced Target ventilation airflow range I r" 5000, -74 CFM Measured Airflow Air Temp Indicated Volumetric Measurement Method ToolLocationThrough ADCF Flow Flow Pass Fail Too[ (F) (CFM) (CFM 5000') Total ❑ Nik ❑Passivepowhood' exhaust ®Flowb -,,a Pitbftutiii fr6V&.�e'N", ._1 airflow 0�o collar. R Total supply []Flbwbbx;,' . airflow ❑RoWc6il iii❑Other (note below) - MR, ml When supply airflow is circulated by air handler fan, fan speed for measuremenl:[D_"Oea 'E[�Coollrig quouslan Balanced airflow in balanced systems Average of measure CFM A r sf supply + exhaust flowsEj LL--JSOOO' Target flow range CFM ❑ Pass Fail (average +/ 5000' Testing notes - Sub -structural floor exhaust N/A — no sub -structural floor exhaust system Testing tech (initials) N '�O Design exhaust airflow (based on Target airflow limits 4' approved design) CFM 5000' (design +I- 15%)CFM5000' Measured airflow Flow Pit6i f6be.trOver-s-e Air temp Flow box fibod' collar through P 1 3 Kood U Powered flow.'Other- '. Passive s Iva Ildii Tool ADCF location F tool (F) El Indicated flowl CFM Volumetric flowl CFM 5000Pass QFail Testing notes ri- v �T EI Noduc-tWork- N/A • &5�rk'.#Citsi�e� "di 0 ed: Testing notes tii•h 6 c (incl mulUple sys) Te.sting,tecK-(jrJ&ls)�' 11-7-77777777:-7 Como by, � est Duct leakage data source a in g� ate House conditioned floor area (include full basement)�sf Air temp through tool (F) ADCF Maximum Allowed Duct Leakage Measured Duct Leakage Test Parameter and Conditions Normalized Absolute (CFM255000'1100sf)I(CFM256000') _ ! Indicated Volumetric er (CFM25) (CFM25 5000') System #1 Pass Fail System #2 Pass Fall Leakage Type Timing Air Handier Total leakage Rough -in Excluded '3 lyt� Total leakage Rough -in Included 4 Total leakage Complete Included 4 Residential Mechanical Design Submittal V20140307 Page 2 For multiple systems, attach one page per system System 95 Which parts of house does it serve? &01404 1006 ,, % Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials) T7�1 '41 Manufacturer j 1tF ,1 Model Furnace or Boiler AC or Heat Pump Condenser AC or Heat Pump Coil fiber&ss-t.�--,,.�-` Electrostatic Filter F 7-7 Type Thickness FRV X-,Ba§ic-plddted -U Other,, brand LAIPJOCO�� (inches) (optional) Static pressures P -A 00696d (Cooling)'-" open registers i e'damp,,. '&9'bpen ' Spi AP Filter (sp SP21� I Testing tech (Initials) 1/,4,1 (Same location- SP4 for NSOP. TFSOP) AP Coil (Spzi�sl`4) - SP3 AP Total ESP (SP3-SF2) Cooling: Measured air flow through Indoor coil N/A - no AC installed Testing tech (Inifials) Design cooling airflow (h1gh 7, CFM 5000' Target airflow limits (design +1- 15%) 7V AlM 0, 01. 1 1W 14. 6 0; IP ijCFM 5000' ('Measured airflow Flow grid plate size . U 14 :[J� 20 Air temp through too] (F) ADCF NSOP TFSOP FlowResistance Correct! on Factor \: Measured airflow, no adjustment/correctionl'-$Fl"tD F777= :jCFM Indicated airflow, 1CFM Measured AF x FRCF Volumetric airflow A CFM 9Pass Eil Indioated AF x ADCF 5000 Fall Testing notes Heating: Gas manifold pressure (high stage) Testing tech (initials) Manifold pressure 13 IWC Target manifold P OEM Spec @ 5000' limits0,- (Spec +/- 5%) 171 1 Measured Pass IWC rr pressure IWC n; Fail H I eating: Temperature rise Testing tech (initials) F� ... OEM temperature rise limits " I F (high stage) UK�—�. Measured temps (F): supply Return �76 Temp Pass Fall - Caution: within 10F air FM5� - air rise Qof top of range Residential Mechanical Design Submittal V20140307 Page 3 Testing tech (initials) Testing approach and targets a;}3 +,,`•F= ❑N/A: No complete AC system � N/A: House completed November - April (instaifing contractor responsible for testing in warm weather) '(❑TXV: Subcooling + SH check Non -TXV: Superheat ❑ OEM -specific: Approach ❑ Other OEM -specific (documentation required) 4,3 Temperatures t,A Condenser Non-TXV: Return Target, (F): enteringairtemp Target Target air wet -bulb temp superhsubcooling{rne LLj approach;«ikro Subcooling Discharge Condenser Liquid Actual w presPusre� saturation TF ine F subcooling F ❑TXV Pass: Actual SC within +!- F of target SC, 2 F min (PSI) (5000' Shan) temp (cond T- Hq me T) ❑3 TXV Fail Superheat ixs Suction Evaporator Suction Actual k pressure s TlF line F superheat F Non-TXV Pass: Actual SH within +/- 5 F of target SH (5000,ion t± (PSI) (s0oo'chart) temp (SuctlineT- ovapT) ❑Non-TXVFail TXV checks: 'El Pass: Field -installed TXV installed in accordance with OEM instructions Caution: Actual SH outside mfgr range w e• P*'it Y ^s"by "'t #�tt P= 1 �v x ti' tx x �,� x „r y. , . .Register air flows Testing tech (initia;s)OW] z 1: All registers are cut through finish materials and moving air J - (Remainder of register air flow section under development, not yet being enforced) Pressure balance Testing tech (initials) `11 Room Room -to -Core Measured (match names on plans, include Pressure Drop Pressure Pass Fail basement if there is a door) Target Range (Pa) Drop (Pa) 1��2 aif3�to+3`I:k cMm t �f `.A Y1 L3./L = 'r , w•3;to +31'�s3 {r (v �U C3A y ; * do +3' sq - 'i's''•�1"tt" 5 3to+3 Ske:. 1k Y Residential Mechanical Design Submittal V20140307 Page 4 ® Combustion safety testing N/A — no natural -draft combustion appliances Testing (Appliance Types table must be completed for every home) Tesg tech (initials ) ' 0 Appliance types I p r :1y w, Combustion Type NSA Draft -hood Induced -draft Power- Direct- Powered sealed - Appliance Natural -draft (Natural -draft) vent vent combustion Electric M Furnace 91 ❑ ❑ ❑ ❑ ❑:. %1* D ❑':' , .: , Fumace #2 Boiler#1 ❑ i0 ❑ ; ❑ ❑4-` ❑: , ❑' Boiler #2 '❑ ' �' ❑ ❑r❑ ❑. ,.;;:�> _d Di _: ii r^ Water heater #1 ;,❑ ❑ ❑ ❑ ❑ f " ❑' ❑ ' Water heater #2 s❑ ` ❑ $' ❑ ❑ r ❑ ' ❑ , ❑ Fireplace #1 ; 0 20 ' ❑ ❑ n ' ❑ ❑, x a ❑ 'Fireplace #2 �:❑ 5❑<; ❑` t:.�❑ m❑ ski (® �r„❑. r Other. 4':O , ❑ t s ❑ r ❑> ` ❑ " '.." f❑ - ` ' ❑. Worst -case depressurization performance Outdoor temperature = F Z pressure BPI depressurization limit (Pa wrt outside) Measured net CAZ depressurization (Pa wrtoutside) OK (less negative) I Caution (more negative) BPI maximum limit (seconds Measured spillage duration (seconds Pass = duration not exceeding limit Draft pressure BPI limit (Pa wrt CAZ Measured (Pa wrt CAZ' Pass = pressure more negative than limit CO concentration in undiluted flue gas BPI maximum limit (ppm; Measured CO (ppm; Pass = CO level not exceeding limit Caution = CO level 25 to 100 ppm �. Testing x :3 \...�. ❑"; OK)� Caution ❑n OK �x Caution ;',❑a OK Caution .ev�a 60g"Z'i ❑. Pass[}` Fail `i❑' Pass a, Faii 4❑° Pass IFail {+N W, ,"a-y ❑:- Pass ©? Fail ❑ 'Pass ❑ Fad ;'❑ Pass R': Fail j:. Pass 1❑� Fail ❑° Pass } Fail ❑`> Pass �ZZ Fail Caution * tr s Caution "10 lCaution Residential Mechanical Design Submittal V20140307 Page 5 9:1* tem'Ct ntrtils' " System Controls Operating Per Design Intent Local exhaust (all fans) 0; N/A `•®d. Pass fl Fail Whole -house ventilation ®`. N/A Q Pass Fail Sub -structural floor exhaust N/A Pass Heating (all systems) ( N/A �> s - Pass Fail Cooling (all systems) �h WA®.y t Pass _i[] Fail Testing tech (initials) Testing Notes a r .... :( L -•, f r • , Technician #1 performing inspection and testing documented on this report (Approved Agency) �c I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the rtCity of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. �1( Name (print) Title "s Company it, 1 Signature and Date r ' t� !')- T +c F { � �. ;,y yn y fs t>..} "♦ _ � v i� 1K t+ i.� ;;. \ F i 9t f�4y L +y.F[ � ^ � t[ 'n 3 •.[('c r 1 `' I y trk � � l�,r,%� (j�C.iJ 4( �'[�J� At•�. ��Y ,? C � A I [ :r v7 pj->1 [ ��<�et i <4 :. 1t t -.• t; j i :-� i�i�, e�� a�� 0' � a ^t t> V � L ; .r.. 3 t v Technician #2 performing inspection and testing documented on this report (Approved Agency) (�; • I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the 7 , City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. x( Name (print) �i Title Sa Company ' Signature and Date I A s sFr t i t e> r, f c a x .fit s h +{1 s tT ' �:•'.�. { ,saS:.. .� -..i.; HVAC Contractor (City of Fort Collins license holder) I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical ' systems. �N ' Name (print) f i ' rtt 4 Title t x ai ' Company pi Signature and Date Residential Mechanical Design Submittal V20140307 Page 6