Loading...
HomeMy WebLinkAbout3235 STANFORD RD - CO/LOC - 4/12/2018City ®f Community Development &Neighborhood Services 281N.,College Ave rFort ins, CO 80522 - t ` Collins 97 .2211676o 970.224.6134 -fax Temporary Certificate of Occupancy Permit #: B1601380 Work Description: NEW 1 STORY, 1430 SQ FT, MAINTENANCE BUILDING FOR APARTMENT COMMUNITY. ALSO TO. INCLUDE BICYCLE REPAIR AND DOG WASH AREAS AND TRASH ENCLOSURE. CITY WATER. ENERGY COMPLIANCE: COMCHECK. JOB CONTACT: GREGORY PAVLICH 303-860-6660. This is to -certify that the building, structure, or land located at 3236 STANFORD RD Fort Collins, CO has been inspected and temporary occupancy is hereby` authorized, effective on 04/12/2018 and conditional upon the following requirements being completed and approved upon final inspection. Bldg Dept Req Docs Rcvd Requirements to be Completed By: 04/11/2018 The following documents are required.w lfiin�30 days fora Certificate of Occupancy: Final HVAC test and balance report (commercial, area); Final Construction Waste Recycling Form with Receipts. WWW Irrigation Final Zoning Final Requirements to be Completed By: 05/ 1 /2018 { {_J I �.-»- If such work is not completed-within:the•time set_forth above and approved on final inspection, or unless the time for completion is extended by tWBuilding and Zoning Office, an order to vacate the premises, or a violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to a maximum fine of $1000.00 per day for every day of violation. Contractor/Owner/Lessee Authorized By: Wlz/l�Date Date of Issuance: 04/12/2018 NOTE: The issuance of this temporary certificate of occupancy will entitle the ownerto place City Utility service in the owners name. Construction power rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. 04/02018 04:0428 PM Page 1 of 1