Loading...
HomeMy WebLinkAbout866 SANDY COVE LN - SPECIAL INSPECTIONS - 1/26/2018WM M M S�9GCT 18 3:36�PI S EISSOC:MMTMS 6TRUCTU RAL ENGINEERS January 26, 2018 Doug Sinclair 723 E 5t" Street Loveland, Colorado 80537 Re: Foundation Wall Steel 866 Sandy Cove Lane Fort Collins, Colorado Project No. 217222 Gentlemen: On January 26t", 2018, a representative of Weeks & Associates observed foundation wall steel at the referenced site. Observations indicate the foundation steel reinforcement and void form placement is in substantial accordance with the engineered foundation plan for the project by Weeks & Associates. In addition, the electrode had been placed in accordance with the recommendations by NEC. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. Patrick Sanders, E.I.T. Staff Engineer G,.• cP� G. U 230-12�`�. .,Weeks, P.E. .4� r IEngineer. *' At�`SS'In:.lnl cCr�� 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622 WIMMMS S IFISSOCMEITLS STRUCTURAL ENGINEERS February 5, 2018 Doug Sinclair 723 E 5t' Street Loveland, Colorado 80537 Re: Perimeter Drain & Damproofing Observation 866 Sandy Cove Lane Fort Collins, Colorado Project No. 217222 Gentlemen: On February 5111, 2018, Weeks & Associates observed the perimeter drain at the referenced site. Observations indicated a 4" diameter perforated pipe had been placed around the exterior perimeter of the foundation and sloped to the sump pit. The drainpipe installation is in substantial accordance with the perimeter drain recommendations for the project. In addition, the exterior of the crawl space foundation walls had been damproofed. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. Patrick Sanders, E.I.T. Staff Engineer 23012 :eks, P.E. ?Qt•Engineer 40, n ,.\ d ''I Ri •. 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622 L March 8, 2018 Doug Sinclair 723 E 51' Street Loveland, Colorado 80537 Re: Structural Steel Connections 866 Sandy Cove Lane Fort Collins, Colorado Project No. 217222 Gentlemen: WLLGIAMS B EISSOMMIE1TISIB STRUCTURAL ENMINEERS On March 8111, 2018, a representative of Weeks & Associates observed the structural steel framing connections at the referenced site. Observations indicate the bolted and welded structural steel framing connections are in substantial accordance with the engineered plan for the project by Weeks & Associates. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. Patrick Sanders, E.I.T. Staff Engineer f 1 q J.�eks, P.E... 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622 EARTH [91919 ENGINEERIG COMPANYN INC. January 31, 2018 Marisa Basta Brown (mbastabrownacomcast.net) 1224 Parkwood Drive Fort Collins, CO 80525 Re: Caisson Observation 866 Sandy Cove Lane Fort Collins, Colorado EEC Project No. 17-01-143 Ms. Brown: As requested, on January 23T4, 2018, Earth Engineering Company, Inc. (EEC) personnel provided construction observation services for the referenced project. On that date, drilled pier foundations were being constructed for the residence at the referenced address. Construction observation services were provided by EEC personnel on a part-time basis and included observations of the pier drilling operation and observation ofpier steel reinforcement. Results of the field observations completed by EEC personnel during the referenced period are included with this report. On January 23`d, 2018, EEC personnel observed the drilling operations for the caisson foundations for the residence under construction at the referenced address. Items observed by EEC personnel included plumbness of the drilled shafts, stratification of soils and bedrock encountered, caisson length, cleanliness of the bearing surface and difficulties encountered during excavation. The materials encountered in the pier borings observed in the garage and basement excavation areas consisted of brown sandy clay soils underlain by brown sandy claystone bedrock at a depth of approximately 3 to 7 feet which extended to the depths explored. The piers were drilled a minimum of 22 feet in length with a minimum penetration of 15 feet into bedrock. The pier hole bottoms appeared relatively clean with water infiltration observed in some of the piers at the time of our observations. The drilled shafts observed appeared plumb, were approximately 10 inches in diameter and extended to a depth of approximately 22 feet at various locations. At the time of our observations, 3 #6 bars were being placed in each caisson excavation and concrete was being placed. The observed pier excavations appeared to be in general accordance with the construction plans prepared by Weeks & Associates, Project No. 217222, dated November 8, 2017. P.O. Box 271428, Fort Collins, CO 80527-.ddWNw�_ phone: 970.775.2004 fax: 970.663.0262 Earth Engineering Company. Inc. EEC Project No. 17-01-143 January 31, 2018 Page 2 We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Company, Inc. Principal Engineer cc: Doug Sinclair fdouggeMesigningstructures.coil' )