Loading...
HomeMy WebLinkAbout241 CORDOVA RD - DISCLOSURES - 2/16/2018 (6)BUILDING LEAKAGE TEST L&L Home Performance 401 N Link Ln Fort Collins, CO 80524 Phone: 970.221.3180 Fax: 970.568.0690 Email: llinsulationjh@gmail.com Website: www.ll-insulation.com Date of Test: 2/16/2018 Test File: Bldg 22 unit 2 Technician: Justin Heldenbrand Project Number: Customer: Capstone Cottage Builders Inc 224 N Lemay Ave Fort Collins, CO 80524 Building Address: Bldg 22 241 Cordova Rd unit 2 Fort Collins, CO 80524 Test Results 1. Airflow at 50 Pascals: 678 CFM50 ( +/- 1.0 %) (50 Pa = 0.2 w.c.) 2.08 ACH50 2. Leakage Area: 37.3 in2 LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient (C) = 21.2 ( +/- 7.3 %) Exponent (n) = 0.886 ( +/- 0.020 ) Correlation Coefficient = 0.99974 4. Test Settings: Test Standard: RESNET Multi-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 39.5 CFM 0.12 ACH 6.6 CFM per person 2. Estimated Design Infiltration Rate: Winter: 74.4 CFM 0.23 ACH Summer: 46.7 CFM 0.14 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 2/16/2018 Test File: Bldg 22 unit 2 Building Information Volume 19540 Surface Area 2416 Floor Area 1800 Height 20 # of Bedrooms 5 # of Occupants 6 Year of Construction 2018 Wind Shield M Location Climate Information Ventilation Weather Factor 0.87 Energy Climate Factor 17.00 Heating Degree Days 6128 Cooling Degree Days 297 Design Winter Wind Speed 7.3 mph Design Summer Wind Speed 9.4 mph Design Winter Temp Diff 73 deg F Design Summer Temp Diff 15 deg F Heating and Cooling Cost and Efficiency Information Heating Fuel Gas Heating Fuel Cost Heating Efficiency % Cooling Fuel Cost Cooling SEER Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) 43466-7-700 - Micromanometer Energy Conservatory DG700 43466 9/15/2016 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 2/16/2018 Test File: Bldg 22 unit 2 Depressurization Test: Environmental Data Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft) 43.0 31.0 5003.0 Data Points Nominal Building Pressure (Pa) Baseline Adjusted Building Pressure (Pa) Fan Pressure (Pa) Nominal Flow (cfm) Adjusted Flow (cfm) % Error Fan Configuration -13.8 n/a n/a -73.4 -59.5 181.9 799 788 -0.4 Ring B -66.6 -52.6 149.0 724 714 0.7 Ring B -61.9 -47.9 125.9 666 657 0.5 Ring B -56.1 -42.2 99.0 591 583 -0.1 Ring B -49.8 -35.8 74.4 513 506 0.2 Ring B -43.5 -29.6 50.7 424 418 -1.8 Ring B -37.6 -23.7 35.4 355 350 0.2 Ring B -32.4 -18.4 23.0 286 282 0.7 Ring B -14.1 n/a n/a Time Averaging Period: 0 Deviations from Standard RESNET Multi-Point Test - Test Parameters None BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 2/16/2018 Test File: Bldg 22 unit 2 Comments Building Performance Institute ID:5060608 (Building Analyst and Infiltration & Duct Leakage Certified) Connection to: Mechanical -50.0pa Garage NA