HomeMy WebLinkAbout4700 LADY MOON DR - SPECIAL INSPECTIONS - 8/28/2017Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by the property owner or their authorized
agent. All defects shall be corrected and system left in service before contractor's personnel finally leave the job.
A certificate shall be filled our and singed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is
understood the owner's representative's signature in no way prejudices any claim against the contractor for faulty material, poor workmanship, or failure t
comply with approving authority's requirements or local ordinances.
Property Name: BANNER HEALTH Date: 8/10/2017
Property Address: 4700 LADY MOON DRIVE FORT COLLINS, COLORADO 80528
Accepted by approving Authorities (names) POUDRE FIRE AUTHORITY
Address 102 REMINGTON STREET FORT COLLINS, CO 80524
Plans
Installation conforms to accepted plans Q Yes No
Equipment used is approved 121 Yes ❑ No
If no, explain deviations
Instructions
Has person in charge of fire equipment been instructed as ❑ Yes ❑ No
to location of control valves and care and maintenance
of this new equipment?
If no, explain
leave copies of the following been left on the premises?
1. System components instructions Q Yes ❑ No
2. Care and maintenance instructions ❑✓ Yes ❑ No
3. NF-PA 25 FJI Yes ❑ No
Location of
Systems
Supplies building:
Year of Temperature
Make Model/Sin Manufacture Orifice Size Quantity Rating
Victualic
UPR
V2704
2017
1/2
55
200
Victualic
PEND
Al12
2017
1/2
99
200
Sprinklers
Reli
PEND
RA1414
2017
1/2
36
155
Reli
PEND
R5418
2017
1/2
6
135
Reli
PEND
RA72t6
2017
3/4
21.
155
Fell
PEND
R4441
2017
3/4
6
135
Reli
UPR
RA1425
2017
L/2
8
200
Pipe and fittings
Type of Pipe: Black Sch 10/Sch 40
Type of Fittings: Cast Iron
Alarm Device
Maximum time to operate through
test connection
Zone
Make
Model
Minutes
Seconds
Alarm
valve or
flow Indicator
` Measured from time inspector's test connection is opened /
Page 1 of 3 \
Q14n.9g-,
Dry Valve
R
Q.O.D. - .
Make
Nlodel
Serial No.
Make
Model
Serial No.
Dry pipe
operating test
Time to trip through test
Water Pressure
Air Pressure
Trip point at air
Time water reached
Alarm operated
connection"
pressure
test outlet*
properly
Minutes
Sec.
psi
psi
psi
Minutes
Sec.
Yes
No
Without Q.O.D
With Q.O.D
If no explain:
Operation: LJ Pneumatic U Electric U Hydraulic
Piping supervised EFYes No Detecting media supervised Ll Yes No
Does valve operate from the manual trip, remote, or both control stations?
Is there an accessible facility in each circuit for testing? ❑ Yes No
Deluge and
If no, explain:
preaction valves
Does each circuit
Does each circuit
Maximum time to
operate supervision
Make
Model
loss alarm?
operate valve release?
operate release
Yes
No
Yes
No
Minutes
Sec.
Location and
Make and Model
Setting
Static Pressure
Residual pressure (flowing)
Plow rate
Pressure reducing
floor
Inlet (psZpsi
Inlet (psi)
Outlet (psi)
Flow (gpm)
valve test
I lVdrostatic: Hydrostatic tests shall be made at not less thar) For hours r SD psi (3.4 bar) above
static pressure in excess of 150 psi (10.2 bar) for 2 hours.pe valve clappers shall be left open during
the test to prevent damage. All aboveground leakage shall be stopped.
Test description
Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1.5 psi (0.1 bar) in 24
hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not
exceed 1.5 psi (0.1 bar) in 24 hours.
All piping hydrostatically tested at: 200 psi for 2 hours
f no, state reason:
Dry piping pneumatically tested ❑ Yes ❑ No
Equipment operates properly ❑ Yes ❑ No
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of
sodium silica�j , brine, or other corrosive chemicals were not used for testing systems or stopping leaks?
W Yes ❑ No
Tests
Reading of gauge located near water supply test
-
Residual pressure with valve in test connection
Drain test
connection: p s-psi
open wide: 11f psi
Underground mains and lead-in connections to system risers flushed before connection made to sprinkler piping
Verified by copy of he Contractor's Material and Test Other: Explain
Certificate for Underground Piping. ❑ Yes ❑ No
Flushed by installer of underground sprinkler piping ❑ Yes ❑ No
If powder -driven fasteners are used in concrete, has
If no, explain:
representative sample testing been satisfactorily
Blank testing
Number used:
Locations :
Number removed:
gaskets
Page 2 of 3
016 7?91
Welding piping n Yes ❑ No If yes..........
Do you certify as the sprinkler contractor that welding procedures used complied with the [7] Yes
❑ No
minimum requirements of AWS B2.1 ASME Section IX Welding and Brozing
Quolijications, or other applicable qualification standard as required by the AEII?
Do you certify that all welding was performed by welders or welding operators qualified E] Yes
❑ No
in accordance with the minimum requirements of AWS B2.1, ASME Section IX Welding
Welding
and Brazing Qualifications, or other applicable qualification standard as required by the
AHJ?
Do you certify that the welding was conducted in compliance with a documented quality [2] Yes
❑ No
control procedure to ensure that (1) all discs are retrieved; (2) that openings in piping are
smooth, that slag and other welding residue are removed; (3) the internal diameters of
piping are not penetrated; (4) completed welds are free from cracks, incomplete fusion,
surface porosity greater than 1/16 in.: and (5) completed circumferential butt weld
reinforcement does not exceed 3/32 in.?
Cutouts (discs)
Do you certify that you have a control feature to ensure that all cutouts (discs)
❑Yes ❑ No
are retrieved?
Hydraulic data
Nameplate provided: IJ Yes ❑ No
If no, explain:
nameplate
Remarks
Date left in service with all control valves open:
Name of sprinkler contractor
Rapid Fire Protection, Inc.
Test witnessed by
_
Signatures
r `�:�'^Y`� — S`i.[�t/r�ri.eAd2lw�
T pr erty owner or their Title
Date
thor ed agent (signed)
For sprinkler contractor (signed) Title
Date
Additional Explanations and note:
Page 3 of 3