HomeMy WebLinkAbout4700 LADY MOON DR - SPECIAL INSPECTIONS - 9/11/2017FJP7-
G
ENGINEERING, INC. PO BOX 810. SEDALIA CO Q03) 688-9044
GENERAL INFORMATION
PROJECT
BANNER FORT COLLINS HEALTH CENTER EXPANSION
LOCATION
FORT COLLINS, COLORADO
ELEVATION
5000,
ARCHITECT
DLR GROUP
MECH. ENG.
DLR GROUP
CONTRACTOR
US ENGINEERING
��6
BAL. CREW
ERIC CONNER
DATE
AUGUST,2017
JPG JOB #
3525
INSTRUMENTS USED
CALIBRATION DATE: Feb 16, 2017
AMPMETER/VOLTMETER
FLuke 324
4152637
ANEMOMETER
TSI/ALNOR RVA-801
JPG-17
PRESSURE GAGE -DIFFER
SHORTRIDGE HDM-300
247987
SPEED INDICATOR
Biddle 9920
786293
VELTMETER
Shortridge ADM-870
M98083
METHOD OF BALANCE
Supply Diffusers are read with a capture hood using a Shortridge Air Data Meter.
Exhaust and return inlet registers read with Shortridge Air Data Meter and Flow Hood.
DDC Velocity sensors on VAV and FPB boxes are calibrated to actual flow measured with Air Data
Meter.
Heating water flow rates are measured with a differential pressure meter on the installed flow elements.
\\\\\111H111111711pq!!!0 I)a
*��G�P®eRo'���yw,, 3�° en ine
as 11,661 Weam '0
Pi�os/ CMIMOPWR Q. CONNER
� ron!° tim 30TIFICiNnON
43
Arta un �
Exp. 3/31/le
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM / -AH 1�A LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
VAV1 A.07
7
24X24
24X24
1.0
80
80
83
83
8
24X24
24X24
1.0
80
80
84
84
r- TOTAL
790
788
VAV1 A.08
1
24X24
24X24
1.0
80
80
78
78
9
48X24
48X24
1.0
160
160
152
152
3
48X24
48X24
1.0
160
160
160
160
4
24X24
24X24
1.0
70
70
69
69
5
24X24
24X24
1.0
80
80
83
83
TOTAL
550
542
VAV1 A.09
1
24X24
24X24
1.0
105
105
104
104
2
24X24
24X24
1.0
105
105
107
107
3
24X24
24X24
1.0
115
115
110
110
4
24X24
24X24
1.0
115
115
117
117
TOTAL
440
438
Pal 9 of 21
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM �'AHU 1A LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
VAV1A.10
1
24X24
24X24
1.0
65
65
67
67
2
24X24
24X24
1.0
50
50
48
48
3
24X24
24X24
1.0
75
75
77
77
4
24X24
24X24
1.0
75
75
72
72
5
24X24
24X24
1.0
75
75
80
80
6
24X24
24X24
1.0
75
75
78
78
7
24X24
24X24
1.0
75
75
71
71
8
24X24
24X24
1.0
75
75
74
74
9
24X24
24X24
1.0
75
75
71
71
10
24X24
24X24
1.0
75
75
71
71
TOTAL
715
709
VAV1A.11
1
24X24
24X24
1.0
75
75
76
76
2
24X24
24X24
1.0
75
75
78
78
TOTAL
150
154
Pa( 1 of 21
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER
FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM A`HU-1A/ LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
VAV1A.12
1
12X12
12X12
1.0
315
315
322
322
TOTAL
315
322
Pa( 2 of 21
wf ENGINEERING
VAV RECAP SHEET
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM: EXISTING AHU
BOX #
ADD #
MAX
MIN
HEAT
SIZE
MULT
REMARKS
VAV'S
XVAV1-2
20
350
240
240
6"
0.67
XVAV1-7
21
350
350
350
6"
0.70
XVAV1-8
19
300
100
100
6"
0.65
TOTAL
1000
690
690
Page 13 of 21
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM EXISTING AHU LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
XVAV1-2
1
24/8
24/8
1.0
110
110
109
109
2
24/8
24/8
1.0
80
80
75
75
3
24/8
24/8
1.0
40
40
44
44
4
24/8
24/8
1.0
120
120
120
120
TOTAL
350
348
XVAV1-7
1
24/10
24/10
1.0
300
300
309
309
2
12X12
12X12
1.0
50
50
50
50
TOTAL
350
359
XVAV1-8
1 24/10 24/10 1.0 300 300 296 296
TOTAL 300 296
P2 '4of21
JENGINEERING
EQUIPMENT DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
EQUIPMENT INFORMATION
UNIT # EF-12
MAKE GREENHECK
MODEL # CUE-099-VG-4-X
SERIAL # 14969881
RATING 350 CFM @ 0.50" ESP
MOTOR DATA
MAKE
GREENHECK
H.P.
1/4
PF/EFF
NOT GIVEN / NOT GIVEN
TYPE
NOT GIVEN
PH.
1
RATED SPEED
300-1725
MEAS. VOLTS
120
SF.
NOT GIVEN
RATED VOLTS
115
MEAS. AMPS
2.6
FR.
NOT GIVEN
RATED AMPS
3.5
STARTER DATA
MAKE NONE
MODEL
SIZE
ENCLOSURE CLASS
THERMALS
(EXISTING) AMP RATING
THERMALS
(REQUIRED) AMP RATING
OTHER BUILT IN OVERLOAD
DRIVE DATA
DRIVEN SHEAVE DIRECT DRIVE
BORE
DRIVER SHEAVE
BORE
BELT SIZE
NO. BELTS
TURNS TO MAX
MOTOR ADJUST -INCHES
DRIVE CHANGE
BELT CHANGE
INITIAL/FINAL RPM /
FINAL AMPS 2.6
PRESSURE INFORMATION
IN JOUT
Remarks: REQUIRED = 350 CFM FINAL = 356 CFM. FAN SPEED SET
Page 15 of 21
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM EXHAUST LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
EF-12
1
12X12
12X12
1.0
100
100
99
99
2
12X12
12X12
1.0
100
100
99
99
3
12X12
12X12
1.0
100
100
105
105
4
24X12
24X12
1.0
50
50
53
53
TOTAL
350
356
P2 16of21
ENGINEERING
TABLE OF CONTENTS
Item Sheet Number
CoverPage..................................................................................................................................................
I
Tableof Contents........................................................................................................................................2
Equipment(Air) - AHU-IA (SUPPLY)......................................................................................................3
Equipment(Air) - AHU-IA (RETURN).....................................................................................................4
RectDuct Traverse - AHU-1 OSA..............................................................................................................5
VAVRecap - AHU- I A / VAV'S................................................................................................................6
Air Balance - AHU-IA / VAV IA.01.........................................................................................................7
Air Balance - AHU- I A / VAV I A.02.........................................................................................................7
AirBalance - AHU- I A / VAV I A.03.........................................................................................................8
Air Balance - AHU- I A / VAV 1 A.04.........................................................................................................8
Air Balance - AHU-1 A / VAV I A.05.........................................................................................................8
Air Balance - AHU-1 A / VAV 1 A.06.........................................................................................................9
Air Balance - AHU- I A / VAV 1A.07.........................................................................................................9
Air Balance - AHU- I A / VAV 1 A.08.........................................................................................................10
Air Balance - AHU-I A / VAV 1A.09.........................................................................................................10
Air Balance - AHU-IA / VAV IA.10.........................................................................................................I
I
Air Balance - AHU-1 A / VAV IA.I 1.........................................................................................................I
1
Air Balance - AHU-IA / VAV IA.12.........................................................................................................12
VAV Recap - EXISTING AHU / VAVS...................................................................................................13
Air Balance - EXISTING AHU / XVAV 1-2..............................................................................................14
Air Balance - EXISTING AHU / XVAV 1-7..............................................................................................14
Air Balance - EXISTING AHU / XVAV 1-8..............................................................................................14
Equipment(Air) - EF-12..............................................................................................................................15
Air Balance - EXHAUST / EF-12..............................................................................................................16
Water Balance - HOT WATER / HOT WATER.......................................................................................17
Equipment(Water) - PHP-AHU-IA ............................................................................................................20
Water Balance - CHILLED WATER / AHU- I A.......................................................................................21
Page 2of21
ENGINEERING
EQUIPMENT DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
EQUIPMENT INFORMATION
UNIT # AHU-1A (SUPPLY)
MAKE TEMTROL
MODEL # ITF-RSA-RDHRE 15
SERIAL # B000403-00
RATING 8,400 CFM @ 2.0" ESP
MOTOR DATA
MAKE
BALDOR X 2
MOTORS
H.P.
7.5
PF/EFF
90 / 91
TYPE
B000403-00
PH.
3
RATED SPEED
3525
MEAS. VOLTS
VFD - 460 @ 60 HZ
SF.
1.15
RATED VOLTS
230/460
MEAS. AMPS
VFD - 8.8 @ 47 HZ
FR.
213TZ
RATED AMPS
19-17.2/8.6
STARTER DATA
MAKE HVAC-VFD
MODEL
SIZE
ENCLOSURE CLASS
THERMALS
(EXISTING) AMP RATING
THERMALS
(REQUIRED) AMP RATING
OTHER
DRIVE DATA
DRIVEN SHEAVE DIRECT DRIVE
BORE
DRIVER SHEAVE
BORE
BELT SIZE
NO. BELTS
TURNS TO MAX
MOTOR ADJUST -INCHES
DRIVE CHANGE
BELT CHANGE
INITIAL/FINAL RPM /
FINAL AMPS VFD - 8.8 @ 47 HZ
PRESSURE INFORMATION
BLENDER
IN
-0.13
OUT
-0.18
DROP
0.05 "
FILTER
IN
-0.18
OUT
NO ACCESS
- "
HEATING COIL
IN
NO ACCESS
OUT
-0.36
- "
COOLING COIL
IN
-0.36
OUT
-0.73
DROP
0.37 "
FAN
IN
-0.73
OUT
2.18
RISE
2.91 "
FINAL FILTER
IN
2.18
OUT
1.84
DROP
0.34 "
Remarks: UNIT FINALLED AT MINIMUM (26% - 2,200 CFM) OUTSIDE AIR WITH ALL VAV'S CALLING FOR MAX
COOLING. DUCT STATIC IS MAINTAINING 1.40". DUCT STATIC SETPOINT IS 1.40"
Page 3 of 21
ENGINEERING
EQUIPMENT DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
EQUIPMENT INFORMATION
UNIT # AHU-1A (RETURN)
MAKE TEMTROL
MODEL # ITF-RSA-RDHRE 15
SERIAL # B000403-00
RATING 8,100 CFM @ 0.50" ESP
MOTOR DATA
MAKE
BALDOR X 2
MOTORS
H.P.
2
PF/EFF
82 / 86.5
TYPE
B000403-00
PH.
3
RATED SPEED
1725
MEAS. VOLTS
VFD - 460 @ 60 HZ
SF.
1.15
RATED VOLTS
230/460
MEAS. AMPS
VFD - 2.7 @ 35 HZ
FR.
145T
RATED AMPS
5.7-5.4/2.7
STARTER DATA
MAKE HVAC-VFD
MODEL
SIZE
ENCLOSURE CLASS
THERMALS
(EXISTING) AMP RATING
THERMALS
(REQUIRED) AMP RATING
OTHER
DRIVE DATA
DRIVEN SHEAVE DIRECT DRIVE
BORE
DRIVER SHEAVE
BORE
BELT SIZE
NO. BELTS
TURNS TO MAX
MOTOR ADJUST -INCHES
DRIVE CHANGE
BELT CHANGE
INITIAL/FINAL RPM /
FINAL AMPS VFD - 2.7 @ 35 HZ
PRESSURE INFORMATION
FAN IN -0.17 OUT 0.008 RISE 0.181,
Remarks:
Page 4 of 21
ENGINEERING
RECTANGULAR DUCT TRAVERSE REPORT
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM AHU-1 OSA LOCATION/ZONE
AIR TEMP. (°F)
DUCT S.P.
DUCT
SIZE 58 X 38 SQ.FT. 15.31
REQUIRED
FPM 144 CFM 2200
MEASURED
FPM 147.25 CFM 2254
POSITION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
222
231
238
209
2
55
87
73
63
3
4
5
6
7
8
9
10
11
12
13
14
Velocity
Subtotals
277
318
311
272
NOTE: Instrumentation used: Airdata Multimeter
Velocity readings are automatically corrected for altitude and temperature.
( 1178 / 8 ) = ( 147.25 FPM) ( 15.31 SO.FT. ) = 2254 CFM
Remarks:
Page 5 of 21
. [PG
of ENGINEERING
VAV RECAP SHEET
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM: AHU-1 A
BOX #
ADD #
MAX
MIN
HEAT
SIZE
MULT
REMARKS
VAV'S
VAV1A.01
1
1560
1320
1320
14"
0.76
VAV1A.02
2
285
145
145
6"
0.72
VAV1 A.03
3
530
160
160
8"
0.69
VAV1A.04
4
385
385
385
6"
0.70
VAV1A.05
5
820
820
820
10"
0.78
VAV1A.06
6
430
130
130
8"
0.72
VAV1A.07
7
790
790
790
10"
0.78
VAV1A.08
8
550
165
165
8"
0.84
VAV1A.09
9
440
440
440
8"
0.73
VAV1 A.10
10
715
600
600
10"
0.87
VAV1A.11
11
150
150
150
6"
0.65
VAV1A.12
12
315
0
0
6"
0.84
TOTAL
6970
5105
5105
Remarks: VAV'S WERE CALIBRATED AND BALANCED WITH GRILLES IN A FULL COOLING MODE
Page 6 of 21
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM /AHLI1 A LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
VAV1 A.01
1
SLOT
SLOT
1.0
260
260
267
267
2
SLOT
SLOT
1.0
260
260
264
264
3
SLOT
SLOT
1.0
260
260
268
268
4
SLOT
SLOT
1.0
260
260
260
260
5
SLOT
SLOT
1.0
260
260
260
260
6
SLOT
SLOT
1.0
260
260
247
247
TOTAL
1560
1566
VAV1 A.02
1
24X24
24X24
1.0
70
70
67
67
2
24X24
24X24
1.0
70
70
69
69
3
24X24
24X24
1.0
70
70
72
72
4
24X24
24X24 t
1.0
75
75
72
72
TOTAL
285
280
P 7of21
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM /A U- A LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
VAV1 A.03
1
48X24
48X24
1.0
150
150
160
160
2
48X24
48X24
1.0
150
150
148
148
3
48X24
48X24
1.0
230
230
218
218
TOTAL
530
526
VAV1 A.04
1
24X24
24X24
1.0
75
75
79
79
2
24X24
24X24
1.0
105
105
111
111
3
24X24
24X24
1.0
105
105
100
100
4
24X24
24X24 t
1.0
100
100
104
104
TOTAL
385
394
VAV1 A.05
1
24X24
24X24
1.0
80
80
76
76
2
24X24
24X24
1.0
110
110
111
111
3
24X24
24X24
1.0
110
110
106
106
4
24X24
24X24
1.0
110
110
110
110
5
24X24
24X24
1.0
110
110
112
112
8 of 21
ENGINEERING
AIR BALANCE DATA
PROJECT BANNER FORT COLLINS HEALTH CENTER EXPANSION
SYSTEM HU-1 A LOCATION
OPENING
SIZE
REQUIRED
FINAL
MINIMUM
HEATING
PLAN
ACTUAL
AREA
VEL
CFM
VEL
CFM
VEL
CFM
VEL
CFM
VAV1 A.05
6
24X24
24X24
1.0
110
110
117
117
7
24X24
24X24
1.0
110
110
118
118
8
24X24
24X24
1.0
80
80
78
78
TOTAL
1
820
828
VAV1 A.06
1
48X24
48X24
1.0
160
160
165
165
2
48X24
48X24
1.0
160
160
154
154
3
24X24
24X24
1.0
110
110
105
105
TOTAL
430
424
VAV1 A.07
1
24X24
24X24
1.0
105
105
101
101
2
24X24
24X24
1.0
105
105
102
102
3
24X24
24X24
1.0
105
105
100
100
4
24X24
24X24
1.0
105
105
104
104
5
24X24
24X24
1.0
105
105
107
107
6
24X24
24X24
1.0
105
105
107
107
P r 9 of 21