Loading...
HomeMy WebLinkAbout4965 HOGAN DR - SPECIAL INSPECTIONS - 2/6/2017Truutn +En4tnterin4, 11r. 34rurtural Enginerring & 3nzprrtivrrs February 6, 2017 V I l` r Riot i i 13I6 6(al %l Homes from the Hart 377 Bluegrass Court Windsor, CO 80550 v Re: Excavation & Footing Observation at 4965 Hogan Drive, Fort Collins, CO Crown Engineering, llc. Project No. 50-01-23-02 r Gentlemen: As requested, we have visually observed the excavation at the above referenced location. The purpose of this observation was to verify that the bearing capacity of the soil is adequate for the support of the residential additions to be constructed there. At the time of our observation, the excavation had been completed. The excavations revealed brown and gravelly lean clays to the depths excavated for the frost depth concrete stem wall and footings to be constructed. We also visually observed the footing sizes, widths and steel reinforcement at the residence under construction at the above referenced location. The observation was performed on September 15, 2016. It is our opinion that the footing sizes, widths and steel reinforcing were in general conformance with the foundation plan, drawn by Crown Engineering, llc. Project number 50-01-23-01 dated July 22, 2016. Thank you for consulting with us on this phase of your project. If you have any questions, please do not hesitate to contact me at (970) 691-4239. Sincerely, Main Office 524 Stover Street Fort Collins, Colorado 80524 Phone (970)498-9537 Cell (970) 691-4239 Fax (970) 221-1521 e-mail revessf5@msn com Grown En#inrrrin#, 11r. 3lrurturnl Kn#inerring & 3nspirrlions February 6, 2017 Homes from the Hart 377 Bluegrass Court Windsor, CO 80550 Re: Wall Steel Reinforcement Observation at 4965 Hogan Drive, Fort Collins, CO Crown Engineering, llc. Project No. 50-01-23-03 Gentlemen: We have visually observed the concrete foundation wall steel reinforcing placed in the forms at the residential addition under construction at the above referenced location. The observation was performed on September 19, 2016. It is our opinion that the foundation wall steel reinforcement was placed in general conformance with the foundation plan, drawn by Crown Engineering, llc. Project number 50-01-23-01, dated July 22, 2016. Thank you for consulting with us on this phase of your project. If you have any questions, please do not hesitate to contact me at (970) 691-4239. Sincerely, (grown Structural ,. ' SAR ��.•'P�o 8159 P.E. pr �. i••......•�V�� S�0NAL� Main Office 524 Stover Street Fort Collins, Colorado 80524 Phone (970)498-9537 Cell (970)691-4239 Fax (970) 221-1521 e-mail revessf5@msn com