Loading...
HomeMy WebLinkAbout417 N GRANT AVE - CORRESPONDENCE - 6/2/2017�Gtyof C Community Development & Neighborhood Services � Collins 281 N College Ave Fort Collins, CO 80522, Voice 970 221-6760 FAX 970 224 6134 CONSTRUCTION WASTE MANAGEMENT PLAN and DOCUMENTATION Note City staff is able to assist if you have questions about implementing a construction site recycling program please call Jonathon Nagel at (970) 416 2701 �7 PROJECT INFORMATION Address(es) /� Permit #(s) General Contractor & Contact Info �en 64".5 Instructions Submit the construction waste management plan at the beginning and end of each protect At first submittal do not include the total volume/weights signatures or documentation At protect completion resubmit this plan with ALL fields completed along with the required documentation If one or more materials were not generated during the protect indicate as such Documentation Provide documentation from the hauling company listing the protect address and services provided If you hauled the materials yourself attach tickets from all facilities recycling the materials Vendor hauling the Facility recycling the Total volume or weight Material material material of material Indicat 1f self -hauled Indicate units Concrete/Masonry N /L (Required) Wood/Lumber (Required) �1 " Metals \ Se I Co bni-45 100 Its (Required) �a/y) Cardboard Se. �( `��� I f t� (Required) yam( S Trash S � N/A I tL k Contaminated loads (Intended recyclables sent N/A to landfill Indicate material) I and my hauler certify that the above materials from my const-Fuctlon site were recycled in the volume / weight described and were taken to the facilities described -ro, Q (,e�ID�c I� 6/.-1 17 Print Name & Signature - Contractor or Owner Date / C'4 a V� L-� of&/ %..� <1 0i Print Name Signature - Hauler(s) (If multiple indicate vendor and include signature from each) 61�),'-2 Date Rev 5 1 2017 0/80017 11 34 AM Sales Receipt #599980 Store 1 HAGEMAN EARTH CYCLE 3501 Lnst Prospect Road Fort (,olhnc CO 80525 970 221 7173 V1ww hagemanemlhcycle com BIII To Lenoch Constmolon 417 N Grant Ave Fort Colhns C) 80521 d Cashier MalyJo Description I Oly Fnce Eet Ir Ice CaratluPLonMaten 1 $750 $2 50 SutAotal ,22 hl County bales ia> 0 % Tax + $0 00 RECEIPT TOTAL $22 50 Account $12 °0 Sic3n4turo __ I Ugrce to I ay a ove amount according to card r suer agreement tmerchmlt agreement if wedit voucher, Thank you for yourbusmess' COMPANIONS WI rH NATURE 0/8/,017 3 14 PM Sales Receipt 1160017b Store I HAGEMAN EARTH CYCLE 3501 E tst Prospect Road Fort (,olluls CO 8056 9/0 221 7173 www hagemane tlthcyr le r om BIII To I enoch Construction 417 f r Grant Ave Fort Collins CC) 80521 ; r Cashier M,i/Jo ijt " nption I OIy Price Ert I'nw 0111trw hoii Mrlui _' $7 50 FI9 Ju Subtot it $I i 00 'r Int; 0 % lax $0 00 RECEIPT TOTAL $15 00 air cunt $ 1 100 Slgn tul - -- -- -- ,I c r pay above anwunl arcodmg to c,ld Duel agr�enrent (merrhant ay uement it rdit vuurher) shank you for your business' COMPANIONSWITH tl VURE Weitzel & Sons Excavatin& Inc. 225 South Taft Hill Road Fort Collins, CO 80521-2229 970-482-9777 uww WettzelandSonsExcavatzng coin BX To- Lenoch Construction 417 Grant St Ft Collins, CO 80521 1 IWI)5f " V 5/30/2017 Ship Ta 417Gran t St Ft Collins, CO Invoice it ' 5375 De,smphon Qty Rate Amount Dump Truck _ _ _ _ __.. _ . ,._ Compost (4 yards) Top Soil (5 yards) 2 4 5 _ 85 00_ 2395 33.00 170 00 95 80T 165.00T _ Terms Due upon receipt Finance charge will be 1 o, _____. t_ __ ___ _____.__r _. _._ subtotal $430.80 Sales Tax Q 401o) $19 30 Total. $450.10 Payments/credits $0 00 Balance Due. $450 10 MI r /J/o Pur /murilm, ui art ttrtrmut vale Vf /i /o Weitzel & Sons Excavatin& Inc. 225 South Taft Hill Road Fort Collins, CO 80521-2229 970-482-9777 uraw Wei tzelan dSonsExcavah ng con/ Bdl To- lenocln Construction 417 Grant St Ft. Collins, CO 80521 es{, 0Dnte InvoiceH 5/77/2017 5372 Slip To 417 Grant St Ft Collins, CO Description Qty Rate Amount Dump Truck 2 85.00 17000 Compost (4 yards) 4 23.95 95 80T Top Soil (5 yards) 5 33.00 165 OOT Subtotal- $430 80 Sates Tax (7401b) $19.30 Total. $450.10 Terns Due upon receipt Payments/Credits- $0 00 Finance charge will be Balance Due. $45010 u u, 1 /./ie per month, or un unnuuI /utc Uj 41 /e