Loading...
HomeMy WebLinkAbout639 S COLLEGE AVE - CO/LOC - 3/8/2016City Collins Community Development & Neighborhood Services 281 N. College Ave Fort Collins, CO 8o522 970.221.676o 970.224.6134 -fax Temporary Certificate of Occupancy Permit #: B1411616 Work Description: TENANT FINISH FOR BOHEMIAN FOUNDATION TO INCLUDE GUTTING ALL 3 STORIES FOR STRUCTURAL UPGRADES; 1ST FLOOR 5665 SQ FT, 2ND FLOOR 2951 SQ FT, 3RD FLOOR(MEZZEZNINE) 482 SQ FT, DEMOS TO INCLUDE INTERIOR AND EXTERIOR. NEW LIGHTING FIXTURES, MINOR ROOF REPAIRS, AND FACADE REPAIRS. WORK TO ALSO INCLUDE ADDITION ON CRAWL SPACE FOUNDATION TO 1ST AND 2ND STORY TOTALING 1750 SQ FT. This is to certify that the building, structure, or land located at 639 S COLLEGE AVE Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective on 03/08/2016 and conditional upon the following requirements being completed and approved upon final inspection. Engineering Final Requirements, to be. Completed By: 03/31/2017 02N82016 All curb and gutter, sidewalks are o.k Curbstop has been checked and functioning cor�redly Addre s umber correctly shown on sWdure Fire Authority Final -Requirements to be Completed By: 03/05/2016 j � `0�16 fire lai ne, map by FACP, Knox Boz� SW Erosion Final Requirements be Completed By: 02292016 Due 5/152016 Soil Prep Certification Requirements_ to,be Completed -By: 0229r2016 A Tempor ry Waiver has been submitted for this address. This Waiver has been accepted and is valid until 05/1512016 Upon or prior to that date a full soil can and landscape receipt should be submitted. Full Cert forms and further soil amendment information should able to be attained at www fcgov.com/soil-amendment if there are further questions or concerns about this waiver please contact Jesse Schlam at tschlam@fcgov com or (970) 218-2932 + , WWW Irrigation Final Requirements to be Completed By: 06/15/2016 Zoning Final Requirements to be Completed By: Contrac er/Le ee Date nxt ;LLMot,rl,h 0fsl 2-01(v Auto rized By Date of Issuance NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owner's name. Construction power rates may be substantially higher than the rate to which the owner is entitled Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills 03/082016 02 03 47 PM Page 1 of 2 �t Collins Community Development & Neighborhood Services 281 N. College Ave Fort Collins, CO 8o522 970.221.676o 990.224.6134 -.fax 02MO16 Landscape bond received 2119/16. HOLD CO for final site and landscape inspection and compliance with MA150083. Compliance includes installation and boiling down bike racks; painting exterior vents/piping to match building exterior color; parking lot striping, installation handicap signage, installation or escrow of landscaping. Contact Rids 303-710-1889 or Sergio Ortiz 303-710-1858. Sergio.Ortiz@Neenan com If such work is not completed within the time set forth above and approved on final inspection, or unless the time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to a maximum fine of $1000.00 per day for every day of violation. o3/d816 Date M R+`G h G(? 20 I ( Date of Issuance NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owner's name. Construction pouter rates may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will continue to be liable to the City for all utility bills. 03/082016 02.03.47 PM Page 2 of 2