Loading...
HomeMy WebLinkAbout2014 SCARECROW RD - DISCLOSURES - 2/22/2017f BUILDING LEAKAGE TEST GS`�Ser C GS Services Ltd 2000 S. College Ave #308 ` Fort Collins, CO 80525 Email: BuildingPerformance@GSServices.com Website: GSServices.com B 14 00251 Date of Test: 2/22/2017 Test File: 3rd Generation Builders - 2014 Scarecrow Rd.- BD1 Customer: 3rd Generation Builders Technician: Project Number: Building Address: 2014 Scarecrow Rd Fort Collins, CO Test Results 1. Airflow at 50 Pascals: 1485 CFM50 (+/- 0.7 %) (50 Pa = 0.2 w.c.) 2.54 ACH50 2. Leakage Area: 81.7 in2 LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient (C) = 78.6 (+/- 5.1 %) Exponent (n) = 0.751 ( +/- 0.014 ) Correlation Coefficient = 0,99982 4. Test Settings: Test Standard: RESNET Multi -Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 70.4 CFM 0.12 ACH 2. Estimated Design Infiltration Rate: Winter: 99.5 CFM Summer: 73.0 CFM 0.17 ACH 0.12 ACH Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: > .• � . a�-:��� GS Se�es �!_--- BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 2/22/2017 Test File: 3rd Generation Builders- 2014 Scarecrow Rd.- BD1 Building Information Location Climate Information Volume 35150 Ventilation Weather Factor 0.87 Surface Area Energy Climate Factor 17.00 FloorArea 3700 Heating Degree Days 6728 Height 10 Cooling Degree Days 297 #of Bedrooms Design Winter Wind Speed 7.3 mph #of Occupants Design Summer Wind Speed 9.4 mph Year of Construction 2017 Design Winter Temp Diff 73 deg F Wind Shield M Design Summer Temp Diff 15 deg F Heating and Cooling Cost and Efficiency Information Heating Fuel Gas Heating Fuel Cost Heating Efficiency% Cooling Fuel Cost Cooling SEER Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) Default Micromanometer Energy Conservatory DG700 1818 2/10/2016 � �- ; a-�`'�y� GS Se�ic�s �---- BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 2/22/2017 Test File: 3rd Generation Builders- 2014 Scarecrow Rd.- BD1 Depressurization Test: Environmental Data Indoor Temperature(A°F) Outdoor Temperature (A°F) Altitude(ft) 64.0 54.0 5000.0 Data Points Nominal Baseline Adjusted Fan Nominal Adjusted Building Pressure Building Pressure Pressure Flow Flow Fan (Pa) (Pa) (Pa) (cfm) (cfm) % Error Configuration -0.3 n/a n/a -59.7 -59.0 85.2 1660 1691 0.6 Ring A -54.3 -53.6 71.1 1520 1548 -1.1 Ring A -47.1 -46.4 59.0 1388 1414 0.7 Ring A -42.0 -41.3 48.3 1258 1282 -0.4 Ring A -35.5 -34.8 37.2 1109 1130 -0.0 Ring A -30.3 -29.6 29.1 984 1002 0.2 Ring A -24.7 -24.0 202.4 843 858 0.4 Ring B -18.7 -18.0 128.8 674 686 -0.3 Ring B -1.2 n/a n/a Time Averaging Period: 0 Deviations from Standard RESNET Multi-Point Test-Test Parameters None . � _. a�:',�.^-� . GSSe�vic�es ��----- BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 2/22/2017 Test File: 3rd Generation Builders- 2014 Scarecrow Rd.- BD1 Comments House WRT Garage = �6.1 pa