Loading...
HomeMy WebLinkAbout808 W PROSPECT RD - CORRESPONDENCE - 9/29/2016City of Planning, Development & Transportation Services Flirt Collins Community Development & Neighborhood Services 281 North College Avenue Fort Collins, CO 80524 970.416.2740 fcgov.com PLAN REVIEW COMMENT LETTER Plan review for: The Slab Project description: New Mixed Use Building — 3 stories, R2/B/S1 occ. 11. Date comments sent to applicant: 09/29/2016 1. The permit application indicates ComCheck energy compliance; however, the plans reflect Prescriptive design. Please clarify. 2. Be advised that for Prescriptive compliance R49 attic insulation is required. The plans indicate R38 batt insulation at system R2. This has been redlined to R49. 3. The minimum plumbing fixture requirements on page G0.1 mention an M occupancy. Only R-2, S1, and B are indicated on the plans. Please clarify. 4. The code plan on G0.1 does not indicate any fire separation rating between the S1 storage and the corridor. A minimum 30 minute separation is required between S1 and the corridor. 5. No code plans were provided for floors 2 and 3 and the mezzanine. Please submit code plans showing the locations of fire separations. 6. The B occupancy areas are shown open to the corridors. The B occupancy area must be separated from the corridor and R2 occupancy areas with a 30 minute fire partition with 20 minute rated openings. 7. GA assemblies WP1047 and WP7053 are proprietary assemblies which require the use of specific, branded gypsum board. Please confirm that this is the intent. 8. On page A1.4, the unit demising wall between the efficiency units at the mezzanine level doesn't line up with the demising wall below. Please clarify. 9. The type A units "A" and "D" indicate a stackable washer and dryer. A stackable washer/dryer unit is unlikely to meet the requirements of ANSI A117.1 section 611 requiring the opening of front loading washer or dryer units to be no more than 36" above the floor. Please provide clarification either by providing information on a stackable unit that will comply or by revising the floor plan to show a standard side by side configuration. 10. Please submit an engineer's evaluation of the existing foundation confirming that it is structurally sound and suitable for this project as proposed. 11. Per 2012 IECC Fort Collins amended section C405.2.1.2.1; occupant sensor controls are required in the enclosed stairwells. OS controls have been redlined onto the plans. 12. Please provide information on how whole dwelling ventilation will be provided. The mechanical design indicates a low sone exhaust fan, but continuous operation is not specified. 13. A standpipe system is required for this building; however, the system is not reflected on the plans. Please provide more information. Sarah Carter Planning, Development & Transportation Services " Collins ommunity Development & Neighborhood Services ®r� �5281 North College Avenue Fort Collins, CO 80524 970.416.2740 BUILDING CODE REVIEW �Bi IT�I�L Rq E00",�' This form must be approved by the Project Planner and the Chief Building Official prior to Building "Code Review" submittal. In order to submit for Building "Code Review" prior to the recording of the project Final Plan, a copy of this form must accompany your complete building permit submittal. Project #: D F 1 C CIO Project Name: Project Type: ❑ Commercial New Description: ❑/Mixed Use New L� Multifamily New Building Services Required Information Description: _ Stories: 13 # of Dwelling Units: & 9 # of Bldgs. ❑ Residential New: ❑ Attached ❑ Detached ❑ Duplex # of Dwelling Units: Project Plan gf,§ignature Chief Building Official Signature Aoplicant Acknowledgement Date Dale understand that the multiple reviewing departments, other than Building Plan Review, WILL NOT be reviewing my building permit submittal until the Final Plan of the development project has been recorded by the City and Geographic Information Services (GIS) has completed and uploaded the appropriate data, parcel, and addressing information into the building permit system. The uploading process to the building permit system may take 10 to 15 business days from date GIS is notified of recording. Once uploaded, additional reviewing departments will be 9ctivated. ® 1 am submitting complete, 100% construction ready plans with required submittal documents for a Building Plan Review. Applicant: r_ Sign,awturef Print Name Date Revised 6/14/2016