HomeMy WebLinkAbout6227 SAKER CT - DISCLOSURES - 7/11/2016,-�— ((-7�0fi0
City of Fort Collins Residential Mechanical Systems Performance Report Updated 3/7/2014
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools CCCiitty, of
and testing techniques, see the "Residential New Construction Mechanical Systems Testing Guide." The guide and FVI ` Colons
this form may be periodically updated; check the Building Services web site for the current version. u�
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Measured value
Target
to compare with
r, - S
Pass (
Other
or limit
target or limit
data
ADCF = Air Density Correction Factor, based on tool,
ADCF altitude (5000'), air temperature through tool
Volumetric flow (CFM 5000') = ADCF x Indicated flow (CFM)
House1. rrr---rrr
Address r „Z2 4 Date of "Residential
�Y Mechanical Systems n
Builder -r Design Submittal"
information referenced r
HVAC contractor by testing technicians
As -built changes vs
mech design submittal
2. Local Exhaust (Spot Ventilation)
TestingBath exhaust ■/lid
Flow — Flow box _ Pilot tube duct traverse Air temp t ]
ADCF r Z
tool Passive flow hood Other (note below) through tool (F)
Measured Airflow
Design
Airflow
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust PickupLocation
(CFM
(CFM 5000')
Flow
Flow
Pass ss Fall
+ Type of Operation
(CFM)
(CFM 5000')
0)0
_VV0 Intermittent — 20 Continuous
'j(,
El�v
— 50 Intermittent _ 20 Continuous
GJLj
❑
50 Intermittent , 20 Continuous]
❑
Intermittent _ 20 Continuous
❑
— 50 Intermittent — 20 Continuous
❑
— 50 Intermittent `20 Continuous
❑
— 50 Intermittent _ 20 Continuous
❑
Testing
riotes
Kitchen exhaust N/A - hood does not vent to outside Testing tech (initials)
Oven fuel Gas Electric Minimum airflow requirement (CFM 5000') + operation 100 Intermittent 25 Continuous
Measured airflow
Flow — Flow box ZPitot tube traverse Tool — II rior grille Air temp
tool —Passive flow hood Flow grid ✓E�diaust duct through ADCF
Powered flow hood —Other note below location —
( ) (Exterior torminflon not OK) tool (F)
Indicated flow CFM Volumetricflow CFM 5000' ass ,Fall
Testing
notes
OY4,LA NLq, AA)W VA 6Vt *\rK11 6st-3eWN fr,,L-d%,y
Residential Mechanical Design Submittal V20140307 Pagel
Systems other than sub -structural floor exhaust
Cod ( minimum ventilation airflow CFM 5000' Design ventilation (]� CFM 5000'
based on CFA and # of BR airflow L
Target ventilation airflow range �j to �(� CFM 5000'
(cod�inimum) (120%of design flow)
Testing tech (initials)I�®t! \ I
System — a`ustonly
typo —Supply only
_ Balanced
Measured Airflow
Air Temp
Indicated
Volumetric
Measurement Method
Tool Location
Through
ADCF
Flow
Flow
Pass Fail
Tool (F)
(CFM)
(CFM 5000')
Total
exhaust
NIA Passive flow hood _
Flow box — Pilot tube traverse
n
v% �
(4
1
airflow
Flow collar Other (note below)
j(/.
Total
NIA Passive flow hood
supply
_ _
— Flow box Pilot tube traverse
,
❑
airflow
Flow collar Other (note below)
When supply airflow is circulated by air handler fan, fan speed for measurement
Heating — Cooling _ Continuous fan
Balanced airflow in balanced systems
Average of measured CFM Target flow range CFM '
supply + exhaust flows 5000' (average +/- 15%)F to 5000, Pass Fail
Sub -structural floor exhaust ❑ N/A -- no substructural floor exhaust system Testing tech (initials)
Design exhaust airflow (based on CFM 5000' Target airflow limits to CFM 5009
approved design) (design +1- 15%)
Measured airflow
Flow box _Pilot tube traverse Air temp
Flow — Passive flow hood _ Flow collar Tool through ADCF
tool --Powered flow hood Other (note below) location tool (F)
Indicated flow CFM Volumetric flow CFM 5000' ❑ Pass ,Fall
Testing
Heating4. + Cooling Duct Leakage
WA — No ducriwrk Testing notes � ` -- �\I
✓�10 ductwork outside conditioned space pnG multiple sys}
Duct leakage
data source
_ Testing tech (initials):
_ Energy rater (name,
company, testing date):
House conditioned floor area Air temp ADCF
�
(include full basement) meat) sf through tool (F)
Maximum Allowed Duct Leakage
Measured Duct Leakage
System #1
System #2
Test Parameter and Conditions
Normalized
(CFM25 5000' / 100 sf)
Absolute
(CFM25 5000')
Indicated
(CFM25)
Volumetric
(CFM25 5000')
Leakage Type
Timing
Air Handler
Pass Fail Pass Fail
Total leakage
Rough -in
Excluded
3
❑ ❑
Total leakage
Rough -in
Included
4
❑ ❑
Total leakage
Complete
Included
4
❑ ❑
Residential Mechanical Design Submittal V20140307 Page 2
For multiple systems, attach one page per system
System #M Which parts of house does it serve? r" 6 V—
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials)
St
Furnace or Boiler J
AC or Heat Pump Condenser
AC or Heat Pump Coil
Manufacturer
IdModel#/
7
1[ 66D206z-1[�"�t�ji�As®�(y
(�
�i� �
1"!iZ7—`1
Filter _ Basic fiberglass _ Electrostatic Thickness /_ MERV
brand TypeI-Zhligh-effic
" sic pleated _ Other. (inches) (optional)
pleated
auL; p
Setup
Speed: ✓ Heating _Cooling _ Cont. fan
_ High -stage for multi -stage equipment
Blower speed tap: V-K
Humidifier damper.
Open (Heating)
_ Closed (Cooling)
All registers open
((J kone dampers open
SP1
AP Filter \
(SP1 - SP2) l
Cooling: Me�sured air flow through Indoor coil
Design cooing as
(high stage) tage) CFM 5000'
� 1 ��`"
Measured airflow
SP2
❑ NIA -- no AC installed
Testing tech (initials)
(Same location
• SP4 . / _ for NSOP,
�(J TF50P)
AP Coil
(SP3$P4) '7
. SP3
OP Total ESP G
(SP3-SP2)
Testing tech (initials)
Target airflow limits p
(design +1-15%) C/2 to 1, CFM 5000'
Flow grid �4
plate size ✓ 20
-
Air temp
t
tool rough®
(F)
ADCF NSOP r)
Flow Resistance
TFSOP Correction Factor-
Measured airflow, on
adjustment/correction
(� Qd'�
CFM
Indicated x airflow (/ j]���—�,�) CFM
Measured AF x FRCF r 1 �`�
Volumetric airflow CFM ass
Indicated AF x ADCF 5000'.Fail
Heating: Gas manifold pressure (high stage)
Testing tech (initials)�J
Manifold pressure5000-�IWC Target manifold P
OEM spec Q 5000' � � � limits (spec +/- 5%)
to
�� 7% Zf �
IWC
ass
Measured rsure WC
pressure
. Fail
Heating: Temperature rise
Testing tech (initials)
OEM temperature rise limits ` F
(high stage)l to
Measured temps F : Supply 7, Z� Retum�I]%1.�f�7�I Temp i
p () air /3� airL1—J — rise Pass
Caution: within 10F
Fail .�, top
of of range
J-�>-£�%GtiN3 e 1330 GFN\,
Residential Mechanical Design Submittal V20140307 Page 3
...y cVV. anu ... ycw
❑ N/A: No complete AC system ❑ NIA; House completed November - April (installing contractor responsible for testing in warm weather)
XV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM -specific: Approach ❑ Other OEM -specific (documentation requ,red)
Temperatures Condenser Non-TXV: Return Target Target Target
(F): entering air temp airwet-bulb temp ® superheater subcooling approach
Subcooling
Discharge Condenser Liquid Actual a V Pass: Actual SC within +/-
pressure V� saturation T J� 1 F line ,� F subcooling r 0 F 3 F of target SC, 2 F min
(PSI. (5l) XY chart) ( l temp (Cana T - liq tine l ® TXV Fail
Superheat
Suction Evaporator Suction Actual ❑ Non-TXV Pass: Actual SH
pressure I �Q saturation TIq5
F line F superheatF within +!- 5 F of target SH
(PSI) ` �J (SOW chart) temp (Sucl line T- Non-TXV Fail
TXV checks: ❑ Pass: Field -installed TXV installed in accordance with OEM instructions ![];Caution: Actual SH outside mfgr range
Approach
Liquid line�F Actual approach�F El Approach Pass: Actual approach within +/- 1 F of target approach
temp (Liq line T- condenser EAT)
Approach Fail
i?'1 P"-c - 647� -
All registers are cut through finish materials and moving air ass .Fail ----------
(Remainder of register air flow section under devolopment, not yet being enforced)
Pressure balance
Testing tech (initials
Room
(match names on plans, include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pa)
Pass Fall
-3 to +3
5
-3 to +3
�-I
-3 to +3
r.
-3 to +3
}
-3 to +3
❑
-3 to +3
❑
-3 to +3
❑
-3 to +3
❑
-3 to +3
❑
-3 to +3
❑
Residential Mechanical Design Submittal V20140307 Page 4
i safety testing N/A -- no natural -draft combustion appliances
Types table must be completed for every home)
Appliance types
Testing tech (initials)
Appliance
Combustion
T pe
N/A
Draft -hood
Natural -draft
Induced -draft
Natural -draft
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
❑
❑
❑
❑
❑
❑
❑
Fumace #2
❑
❑
❑
❑
❑
❑
❑
Boiler #1
❑
❑
❑
❑
❑
❑
❑
Boiler #2
❑
❑
❑
I ❑
❑
1 ❑
❑
Water heater #1
❑
❑
❑
❑
❑
❑
❑
Water heater #2
❑
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
❑
❑
❑
Fireplace #2
❑
❑
❑
❑
❑
❑
❑
Other:
❑
❑
❑
❑
❑
❑
El
Worst -case depressurization performance
House setup
These doors are
_ # of bath fans on
_ Vented range hood on
_ Clothes dryer on
_ Air handler on
Other fans on:
Outdoor temperatureF
CAZ pressure
BPI depressurization limit
setup notes:
(Pa wrt outside)
Measured net CAZ depressurization (Pawn outside)
OK (less negative) i Caution (more negative)
Spillage
BPI maximum limit (seconds)
Measured spillage duration (seconds)
Pass = duration not exceeding limit
Draft pressure
BPI limit (Pa wrt CAZ)
Measured (Pa wrt CAZ)
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit (ppm)
Measured CO (ppm)
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
❑ JOK Q Caution ❑ OK , . i Caution ❑ JOK 1ji,) •' Caution
60
60
60
❑ Pass Fail
❑ Pass Fail
❑ Pass Faii
❑ Pass Fail ❑ Pass Fail ❑ Pass Fail
100
100
100
❑
I.OgW_
Pass Fail
❑
Pass Fail
❑
Pass Fail
Caution
Caution
�,
Caution
Residential Mechanical Design Submittal V20140307 Page 5
Testing tech
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
❑
NIA
Pass
Whole-house ventilation
❑
NIA
Pass
Sub -structural floor exhaust
IA
❑
Pass
UFail
Heating (all systems)
❑
NIA
Pas
Cooling (all systems)
❑
NIA
Pass
Technician #1 performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Buildingervices Department, and that the reported results are accurate to the best of my knowledge.
Name (print)
Title
Company
'i
Signature and Date
MINES
IWO�
'1�7,
Technician #2 performing inspection and testing documented on this report (Approved Agency)
t
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
y. S.
n
s Nai
w
w�
�4
t
C„
trt Signature
HVAC Contractor (City of Fort Collins license holder)
I certify that j have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical
systems.
;+ Na
�t:
f�
h Signature
Residential Mechanical Design Submittal V20140307 Page 6