HomeMy WebLinkAbout914 S COLLEGE AVE - SPECIAL INSPECTIONS - 6/9/2016A L L e N D G U ►- T l 5
33 fE'40 Nrsi court
Livermore, i oloradu 9,05?(h
TIO / ' o a - -1MO
City of Fort Collins 13uitding Dept.
M No. College Ave.
Fort Collins, Colorado 80522
Rt✓: Letter, field changes, Permit # U000271
Best Western Facelift
114 So. College
Ft. Collins, Colorado 90524
This letter is in reference to the above -mentioned Project.
g l i6oa62?/
ro4z'C.-
oq Sune:2o16
Per requests from the Contractor, Dolehoy Construction, Inc., and field observations, the following
were in response to conditions encountered in the field upon the removal of the Remington Street side,
mansard roof system. The existing roof trusses wereover-hanging the walls as part of the existing
roof mansard system. The following was a simple fix for the addition of the new window awnings. as
indicated on the approved drawings:
1. 3/8' Titan. concrete anchors at Wo.c. were approved in for anchoring the P.T. rim joist which
will be for securing the field -built mini -trusses for the new awning.
2, the use of field built 2x4 mini -awning trusses which are to have plywood or o.s.b. gussets
each side of the joints and to be sistered to the existing over -hanging roof trusses.. The now
awning will be sheathed with 7/IV' o.s.b. minimum and be ready for the new roofing as
indicated. j
"3. The new awning soffit shalt have a continuous venting and be soffited with a primed MDF soffit;
board.
I
Should there be any questions, please don't hesitate to call.
Thanr you.
Very truly yours,
Allen D. Curtis, Aribitect
ADG/blc
Copy: File
.r"
AM D.
culls
D-1753
A L L t✓ N D. C u F- T I S
A 9 C H I T e C T
Architecture / Planning
33 Eagles Nest Court
Livermore, Colorado 80536
Tio / 01 - 72go
City of Fort Collins Building Dept.
28i No. College Ave.
Fort Collins, Colorado S0522
g/f SS C CIZ le i hw-
�/o®IOA��O
RE: Site Inspection, Foundation 'Open Hole, Rebar inspection, Permit # *00211
5est Western Facelift
914 So. College
Ft. Collins, Colorado W524
This letter is in reference to the above -mentioned Project.
05 Apr. 201(o
Per a request from the Contractor, Delehoy Construction, Inc., I inspected the excavation for the
required foundation system on 04 Apr. 201(0. The excavation seemed to be per requirements. The size
and depth appeared as required, and soils encountered were consistent with the design parameters
used.
Also, the rebar, were as indicated.
Should there be any questions, please don t hesitate to call.
Thant: you.
Very truly yours,
Allen D. Curtis, Architect
ADC/blc
Copy: File
ALLEN D
CURTIS
B-175S
,, �� ,