Loading...
HomeMy WebLinkAbout609 SMITH ST - SPECIAL INSPECTIONS - 1/19/2016January 19, 2016 Esmeralda Reynolds 609 Smith Street Fort Collins, CO 80524 Subject: Structural Review 4Interior Wall Removal 609 Smith Street ,/ Fort Collins, Colorado CTLIT Project Number: FC07073.000 Dear Ms. Reynolds, I N "C' jj /5"0 6-BSA{ Per your request, personnel from our office made a site visit to the above mentioned location on January 15, 2016. The purpose of our site visit was to review/inspect the removal of an interior wall which separated the living room from the kitchen. Observations from the site visit determined that the wall which was removed supported ceiling joists only. By removing the wall, an opening of approximately 10'-8" was created and it was seen that a (2) 1 3/4" x 11 7/8" LVL beam had been installed to span that opening. Our review is based on a ceiling dead load of 5psf and ceiling live load of 20psf, and concluded that the (2) 1 3/4" x 11 7/8" LVL beam is appropriate to supportthe design loads. Thank you for selecting CTLITHOMPSON for your engineering needs. When we can be of additional service, please contact our office. Very truly yours, CTLITHOMPSON, INC. Matt Gooderu.m, EIT Staff Engineer