HomeMy WebLinkAbout617 TULANE DR - APPLICATIONS - 2/16/2016 (2)City of
Fort Collins
Planning, Development & Transportation
281 N. College Ave P.O. Box 580
Fort Collins, CO 80524
Phone 970-416-2740 Fax 224-6134
OVER-THE-COUNTER PERMITS ONLY
This application is to be used to apply for the following permits only (check all that apply)4199ir Conditioning
❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log
❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic
❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and
manufacturer).
Complete all applicable information the application. Incomplete applications will not be accepted.
Application # laaO q I Date 2z
For o"ce use only
Job Site Address (required)
Value of Construction (labor, materials, profs 4yJJ'
/Owner Name
Property
/Address / City/State Zip
Phone
/
a
Applicant Name
Address City/State Zip
Phone
rA�r /�;%%;►� l�.
'G /'�/-:�'S/,�/rr9 �d'1_ �/~ �/� s ��aZS`�
�3-%l�C/�
Contractor
Address City/State Zip
Phone
411 !�0$firs" 11696, ,1 cs
/
ve- 9hZ :& 61"JX
Contractor City of Ft. Collins Sales Tax # Are you paying taxes here or by report? A!KHere ❑ Report
Sales tax number is required by all contractors Are you paying with your trust account? ❑, Yes ❑ No
Is this a residential or commercial project? I21tResidential ❑ Commercial
If residential, is it: Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex
❑ Multifamily (apartment) ❑ Garage
If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail
❑ Restaurant ❑ Other (explain)
Is this building 50 years of age or more? ❑ Yes WNO If yes, you may need to contact Historic Preservation
If this is for a demolition permit, what year was the building constructed?
Ifprior to 1975, you w/ll need an asbestos assessment to submit with this application.
Description of work
*If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician.
Subcontractors: List the company name or City of Ft Collins license #
Electrician Plumber Mechanical Roofer
Other
I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to
comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a
permit is not valid until it has been paid and issued.
Applicant: /� ,
Print Name:/&?/, " /c����,Y(5/�% Signature �7����� �/ Dated= ��" `lo
a