Loading...
HomeMy WebLinkAbout6266 BUCHANAN ST - APPLICATIONS - 2/3/2016FES-03-2016 10:36AM FROM- 9704848354 T-276 P-002/002 F-054 C r°C tCons Planning, Development & Transportation 281 N. College Ave P.O. Box 580 Fort Collins, CO 80524 Phone 970-416-2740 Fax 224-6134 OVER-THE-COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning ❑ Demolition (interior non-structural) Q Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log ❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic ❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and Complete all applicable information on the application. Incomplete applications will not be accepted. Application # 'Bluonjacy Date For offlee use only Job Site Address (required) Value of Construction (labor, materials, profit) 266) $ wo Property Owner Name Address City/Sta a Zip Phone 1. , MA el 6266 ew�mw_ t a oo�� 292-W Applicant Name Address City/State zip Phone Contractor Address City/State Zip Phone Fort Collins Heating and Air 208 Commerce M. #4 Fort Collins CO 80524 970 494-4552 Contractor City of It Collins Sales Tax # Are you paying taxes here or by report? ❑ Here 4 Report SaleStaxnumber rsrequired bya#contractors. Are you paying with your trust account? ❑ Yes ❑ No Is this a residential or commercial project? 3 Residential ❑ Commercial If residential, is it: C Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex ❑ Multifamily (apartment) ❑ Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building 50 years of age or more? ❑ Yes ❑ No tfyes, you mayneed to contact Historic Preservation If this is for a demolition permit, what year was the building constructed? Ifpdor to .075, you wi/I need an asbestos assessment to submit with this application. Description of work *If lawn sprinkler/backflow preventer, must list licensed plumber. If First-time A/C, must list licensed electrician. Subcontractors: Ust the company name or City of Ft Collins license of Electra Plumber. Mechanical H1309 Roofer Other i hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Applicant: Print Name: Angela Morrow Signature Date 213116