Loading...
HomeMy WebLinkAboutLAKEVIEW ON THE RISE SUBDIVISION - Filed CSS-COMPRESSIVE STRENGTH SUMMARY - 2019-10-11Report Number: Service Date: Report Date: Task: Client Fort Collins, CO 6740 South College Avenue Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 970-484-0359 Fort Collins, CO 80525-4429 1901 Sharp Point Dr, Ste C Concrete 20181040.0293 08/15/19 09/12/19 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 20181040 Specified Strength: 28 days Mix ID: Supplier: Batch Time: Truck No.: 7456120 Aggregate Industries Material Information 1500 126 Plant: Ticket No.: 83455505 Field Test Data Test Air Content (%): Result Specification 3 3/4 3.0-5.0 5.0 4.5-7.5 81 95 142.4 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: 08/15/19 Sample Time: 1545 Christopher Rivera Clear; Hot 4/4 4 Sample Location: Sample obtained in North wall Placement Method: Direct Discharge Water Added Before (gal): Report Date: Service Date: Report Number: Task: 20181040.0293 08/15/19 09/12/19 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 Concrete 970-484-0359 Revision 1 - 28-day results Distribution List Distribution Page (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt (1) Total Concrete Services Inc, Jeff Cast (1) Total Concrete Services Inc, John Montanez Report Number: Service Date: Report Date: Task: Client Fort Collins, CO 6740 South College Avenue Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 970-484-0359 Fort Collins, CO 80525-4429 1901 Sharp Point Dr, Ste C Concrete 20181040.0385 09/25/19 10/02/19 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 20181040 Specified Strength: 28 days Mix ID: Supplier: Batch Time: Truck No.: A4305 Martin Marietta Materials Material Information 0612 1623 Plant: Ticket No.: Rigden 49164441 Field Test Data Test Air Content (%): Result Specification 4 3-5 5.2 4.5-7.5 80 54 148.0 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: 09/25/19 Sample Time: 0730 Quinn Zamora Clear 10/100 100 Sample Location: See attachemnt. CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 20181040.0385 Service Date: 09/25/19 1901 Sharp Point Dr, Ste C Report Date: 10/02/19 Fort Collins, CO 80525-4429 Task: Concrete 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Terracon Rep.: Quinn Zamora Reported To: Taylor w/ Signature Construction & Wayne Contractor: Connell Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen Reviewed By: ____________________________________ (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine Craig L. Nelson (1) Terracon Consultants, Inc., Eric Bernhardt Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 Report Number: Service Date: Report Date: Task: Client Fort Collins, CO 6740 South College Avenue Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 970-484-0359 Fort Collins, CO 80525-4429 1901 Sharp Point Dr, Ste C Concrete 20181040.0344 09/07/19 10/07/19 Revision 2 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 20181040 Specified Strength: 28 days Mix ID: Supplier: Batch Time: Truck No.: A4305 Martin Marietta Materials Material Information 0614 1917 Plant: Ticket No.: 49163652 Field Test Data Test Air Content (%): Result Specification 4 1/2 3-5 5.0 4.5-7.5 76 65 147.4 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: 09/07/19 Sample Time: 0720 Shannon Cargile Sunny 10/30 10 Sample Location: Station 24+93.5 Placement Method: Direct Discharge Water Added Before (gal): Report Number: Service Date: Report Date: Task: Client Fort Collins, CO 6740 South College Avenue Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 970-484-0359 Fort Collins, CO 80525-4429 1901 Sharp Point Dr, Ste C Concrete 20181040.0317 08/28/19 09/27/19 Revision 2 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 20181040 Specified Strength: 28 days Mix ID: Supplier: Batch Time: Truck No.: A4305 Martin Marietta Materials Material Information 0925 1716 Plant: Ticket No.: Rigden 49163167 Field Test Data Test Air Content (%): Result Specification 4 3-5 7.0 4.5-7.5 81 68 145.0 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: 08/28/19 Sample Time: 1010 Quinn Zamora Clear 10/50 50 NE corner of intersection (see CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 20181040.0317 Service Date: 08/28/19 1901 Sharp Point Dr, Ste C Report Date: 09/27/19 Revision 2 - 28-day results Fort Collins, CO 80525-4429 Task: Concrete 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Terracon Rep.: Quinn Zamora Reported To: Taylor w/ Signature Construction Contractor: Connell Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen Reviewed By: ____________________________________ (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine Craig L. Nelson (1) Terracon Consultants, Inc., Eric Bernhardt Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 Report Number: Service Date: Report Date: Task: Client Fort Collins, CO 6740 South College Avenue Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 970-484-0359 Fort Collins, CO 80525-4429 1901 Sharp Point Dr, Ste C Concrete 20181040.0323 08/30/19 09/27/19 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 20181040 Specified Strength: 28 days Mix ID: Supplier: Batch Time: Truck No.: A4335 Martin Marietta Materials Material Information 0819 1916 Plant: Ticket No.: Rigden 49163319 Field Test Data Test Air Content (%): Result Specification 1 1.0-3.0 5.0 5.0-8.0 79 61 148.2 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: 08/30/19 Sample Time: 0940 Quinn Zamora Partly Cloudy 10/100 100 Sample Location: See attachment. CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 20181040.0323 Service Date: 08/30/19 1901 Sharp Point Dr, Ste C Report Date: 09/27/19 Revision 1 - 28-day results Fort Collins, CO 80525-4429 Task: Concrete 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Terracon Rep.: Quinn Zamora Reported To: JC w/ TCS Concrete and Wayne w/ City of Fort Collins Contractor: Connell Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen Reviewed By: ____________________________________ (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine Craig L. Nelson (1) Terracon Consultants, Inc., Eric Bernhardt Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 Placement Method: Chute Water Added Before (gal): Water Added After (gal): Accumulative Yards: Batch Size (cy): Curb and gutter along east side of Highway 287. Placement Location: Laboratory Test Data Set Avg Diam. Area Date Weight Date Test Age at Load Maximum Strength Compressive Fracture No. ID Specimen (in) (sq in) Received Tested (days) (lbs) (psi) Type Tested (lbs) By 29 1 4.00 12.57 09/03/19 8.70 09/06/19 7 70,140 5,580 2 29 2 4.00 12.57 09/03/19 8.76 09/27/19 28 87,920 7,000 3 29 3 4.00 12.57 09/03/19 8.76 09/27/19 28 87,560 6,970 3 29 4 4.00 12.57 09/03/19 8.68 09/27/19 28 89,630 7,130 2 Average (28 days) 7,030 Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Craig L. Nelson Project Manager Connell JC w/ TCS Concrete and Wayne w/ City of Fort Collins Reviewed By: Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064 Terracon Rep.: Quinn Zamora The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 1 of 1 attachment) Sample Location: Placement Method: Chute Water Added Before (gal): Water Added After (gal): Accumulative Yards: Batch Size (cy): Curb and gutter for Debra Drive and north parking lot intersection Placement Location: Laboratory Test Data Set Avg Diam. Area Date Weight Date Test Age at Load Maximum Strength Compressive Fracture No. ID Specimen (in) (sq in) Received Tested (days) (lbs) (psi) Type Tested (lbs) By 26 1 4.00 12.57 08/29/19 8.48 09/04/19 7 53,160 4,230 3 26 2 4.00 12.57 08/29/19 8.52 09/25/19 28 66,620 5,300 2 26 3 4.00 12.57 08/29/19 8.48 09/25/19 28 68,520 5,450 2 26 4 4.00 12.57 08/29/19 8.52 09/25/19 28 69,320 5,520 2 Average (28 days) 5,420 Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Craig L. Nelson Project Manager Connell Taylor w/ Signature Construction Reviewed By: Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064 Terracon Rep.: Quinn Zamora The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 1 of 1 Water Added After (gal): Accumulative Yards: Batch Size (cy): Curb and Gutter, North Site Entryway Placement Location: Laboratory Test Data Set Avg Diam. Area Date Weight Date Test Age at Load Maximum Strength Compressive Fracture No. ID Specimen (in) (sq in) Received Tested (days) (lbs) (psi) Type Tested (lbs) By 36 1 4.00 12.57 09/09/19 8.54 09/09/19 2 51,440 4,090 3 BA 36 2 4.00 12.57 09/09/19 8.62 09/14/19 7 69,230 5,510 3 BA 36 3 4.00 12.57 09/09/19 8.60 10/05/19 28 95,780 7,620 3 36 4 4.00 12.57 09/09/19 8.64 10/05/19 28 91,250 7,260 2 36 5 4.00 12.57 09/09/19 8.62 10/05/19 28 93,530 7,440 3 Average (28 days) 7,440 Initial Cure: Onsite Cooler Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Todd A. Turney Department Manager Connell Taylor w/ Signature Construction Reviewed By: Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064 Terracon Rep.: Shannon Cargile The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 1 of 1 Placement Method: Chute Water Added Before (gal): Water Added After (gal): Accumulative Yards: Batch Size (cy): Sidewalk along hwy 287 (see attachamnet). Placement Location: Laboratory Test Data Set Avg Diam. Area Date Weight Date Test Age at Load Maximum Strength Compressive Fracture No. ID Specimen (in) (sq in) Received Tested (days) (lbs) (psi) Type Tested (lbs) By 44 1 4.00 12.57 09/26/19 8.60 10/02/19 7 64,050 5,100 2 44 2 09/26/19 8.62 10/23/19 28 44 3 09/26/19 8.62 10/23/19 28 44 4 09/26/19 8.66 10/23/19 28 44 5 09/26/19 8.58 11/20/19 56 Initial Cure: Outside Final Cure: Moist Room Comments: Samples Made By: Terracon Services: Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Craig L. Nelson Project Manager Connell Taylor w/ Signature Construction & Wayne Reviewed By: Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064 Terracon Rep.: Quinn Zamora The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 1 of 1 Water Added After (gal): Accumulative Yards: Batch Size (cy): Inlet Walls on College Ave across from tree farm Placement Location: Laboratory Test Data Set Avg Diam. Area Date Weight Date Test Age at Load Maximum Strength Compressive Fracture No. ID Specimen (in) (sq in) Received Tested (days) (lbs) (psi) Type Tested (lbs) By 25 1 4.00 12.57 08/16/19 8.50 08/22/19 7 47,110 3,750 2 QMZ 25 2 4.00 12.57 08/16/19 8.50 09/12/19 28 58,340 4,640 3 25 3 4.00 12.57 08/16/19 8.42 09/12/19 28 60,360 4,800 3 25 4 4.00 12.57 08/16/19 8.44 09/12/19 28 61,770 4,920 2 Average (28 days) 4,790 Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Reported To: Contractor: Report Distribution: See attached distribution list. Craig L. Nelson Project Manager Connell Wayne w/ CoFC Reviewed By: Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064 Terracon Rep.: Christopher Rivera The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 1 of 1