Loading...
HomeMy WebLinkAboutLAKEVIEW ON THE RISE SUBDIVISION - Filed FDT-FIELD DENSITY TEST - 2019-09-16FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: 20181040.0353 09/10/19 09/12/19 Earthwork 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 970-484-0359 Client Signature Construction LLC Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 Lakeview on the Rise Apartment Development 6740 South College Avenue Fort Collins, CO Project Project Number: 20181040 Lab Test Data (%) Compaction Project Requirements (%) Content Water No. Mat. Material Information Density Max. Lab (%) Content Water Optimum Ref. No. Proctor Laboratory Classification and Description Test Method (pcf) 1 20181040.0223 Recycled concrete Base ASTM D698 8.8 119.0 5.8-11.8 min 95% Field Test Data No. Test Location Elev. No. Test Lift / Mat. Depth Density Probe Wet Content Water (%) Content Water Density Dry (%) Percent Compaction (in) (pcf) (pcf) (pcf) Hwy. 287 northbound site exit lane sub-grade 456 50' north of north exit -0' 1 8" 127.1 10.3 8.8 116.8 98 457 150' north of north exit -0' 1 8" 127.9 10.7 9.1 117.2 98 Report Date: Service Date: Report Number: Task: 20181040.0353 09/10/19 09/12/19 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 Earthwork 970-484-0359 Distribution List Distribution Page (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt (1) Total Concrete Services Inc, Jeff Cast (1) Total Concrete Services Inc, John Montanez FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: 20181040.0346 09/09/19 09/10/19 Earthwork 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 970-484-0359 Client Signature Construction LLC Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 Lakeview on the Rise Apartment Development 6740 South College Avenue Fort Collins, CO Project Project Number: 20181040 Lab Test Data (%) Compaction Project Requirements (%) Content Water No. Mat. Material Information Density Max. Lab (%) Content Water Optimum Ref. No. Proctor Laboratory Classification and Description Test Method (pcf) 1 20181040.0223 Recycled concrete Base ASTM D698 8.8 119.0 5.8-11.8 min 95% Field Test Data No. Test Location Elev. No. Test Lift / Mat. Depth Density Probe Wet Content Water (%) Content Water Density Dry (%) Percent Compaction (in) (pcf) (pcf) (pcf) Hwy 287 turning lane 452 Test #1 (see attachment) 0' 1 8" 125.3 7.0 5.9 118.3 99 453 Test #2 0' 1 8" 129.9 10.6 8.9 119.3 100 FIELD DENSITY TESTING REPORT Report Number: 20181040.0346 Service Date: 09/09/19 1901 Sharp Point Dr, Ste C Report Date: 09/10/19 Fort Collins, CO 80525-4429 Task: Earthwork 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Terracon Rep.: Quinn Zamora Reported To: Jeff with Connell Contractor: Connell Report Distribution: See attached distribution list. Reviewed By: ____________________________________ Craig L. Nelson Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 Report Date: Service Date: Report Number: Task: 20181040.0346 09/09/19 09/10/19 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 Earthwork 970-484-0359 Distribution List Distribution Page (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt (1) Total Concrete Services Inc, Jeff Cast (1) Total Concrete Services Inc, John Montanez HMAC FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: Client 20181040.0348 09/10/19 09/12/19 Asphalt Signature Construction LLC Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 970-484-0359 Lakeview on the Rise Apartment Development 6740 South College Avenue Fort Collins, CO Project Project Number: 20181040 Lab Test Data Comp. Max. Project Requirements Comp. Min. Mat. Material Information Thickness Min. Density Reference Laboratory No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%) 1 Connell Mix 154.2 Field Test Data Test Pave. Mat. Density Length Nuclear Core Density Core Factor Correction Density Corrected Comp. No. Test Location Lift No. (%) Core Data (pcf) (in) (pcf) (pcf) (pcf) Highway 287 northbound turn lane 85 Approximately 1,200' south of north entrance Bottom 1 142.2 92 86 Approximately 800' south of north entrance Bottom 1 144.2 94 87 Approximately 500' south of north entrance Bottom 1 143.5 93 Report Date: Service Date: Report Number: Task: 20181040.0348 09/10/19 09/12/19 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 Asphalt 970-484-0359 Distribution List Distribution Page (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt (1) Total Concrete Services Inc, Jeff Cast (1) Total Concrete Services Inc, John Montanez 88 Approximately 200' south of north entrance Bottom 1 142.2 92 89 Approximately 10' south of north entracne Bottom 1 141.2 92 Comments: Datum: 0'=final road grade Std. Cnt. M: 530 Std. Cnt. D: 1741 S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019 Services: Perform in-place density tests to determine degree of compaction. Reported To: Contractor: Report Distribution: See attached distribution list. Brian w/Connell Connell Craig L. Nelson Project Manager Reviewed By: Terracon Rep.: Quinn Zamora Test Methods: ASTM D2950 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0025, 11-16-12, Rev.6 Page 1 of 1 454 Test #3 0' 1 8" 130.0 8.5 7.0 121.5 102 455 Test #4 0' 1 8" 129.3 7.1 5.8 122.2 103 Comments: Datum: 0'=final road sub-grade Std. Cnt. M: 530 Std. Cnt. D: 1741 Test and/or retest results on this report meet project requirements as noted above. S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019 Services: Reported To: Contractor: Jeff with Connell Connell Craig L. Nelson Project Manager Report Distribution: See attached distribution list. Reviewed By: Terracon Rep.: Quinn Zamora Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 1 of 1 Comments: Datum: 0'=final road sub-grade Std. Cnt. M: 530 Std. Cnt. D: 1741 Test and/or retest results on this report meet project requirements as noted above. S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019 Services: Reported To: Contractor: Rory with Connell Connell Craig L. Nelson Project Manager Report Distribution: See attached distribution list. Reviewed By: Terracon Rep.: Quinn Zamora Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 1 of 1