Loading...
HomeMy WebLinkAboutLAKEVIEW ON THE RISE - Filed FDT-FIELD DENSITY TEST - 2019-08-16 (2)HMAC FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: Client 20181040.0280 08/07/19 08/13/19 Asphalt Signature Construction LLC Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 970-484-0359 Lakeview on the Rise Apartment Development 6740 South College Avenue Fort Collins, CO Project Project Number: 20181040 Lab Test Data Comp. Max. Project Requirements Comp. Min. Mat. Material Information Thickness Min. Density Reference Laboratory No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%) 1 Connell Mix 154.2 92 96 Field Test Data Test Pave. Mat. Density Length Nuclear Core Density Core Factor Correction Density Corrected Comp. No. Test Location Lift No. (%) Core Data (pcf) (in) (pcf) (pcf) (pcf) Southeast Corner of Stoney Brook road/Debra Drive 24 See Diagram Bottom 1 143.3 93 25 See Diagram Bottom 1 144.0 93 26 See Diagram Bottom 1 145.1 94 27 See Diagram Bottom 1 144.3 94 28 See Diagram Bottom 1 143.8 93 29 See Diagram Bottom 1 144.0 93 30 See Diagram Bottom 1 145.0 94 Comments: Datum: Bottom = Bottom Mat Std. Cnt. M: 619 Std. Cnt. D: 1973 ASPHALT DENSITY TESTING REPORT Report Number: 20181040.0280 Service Date: 08/07/19 1901 Sharp Point Dr, Ste C Report Date: 08/13/19 Fort Collins, CO 80525-4429 Task: Asphalt 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Perform in-place density tests to determine degree of compaction. Terracon Rep.: Taylor Keller Reported To: Jeff with Connell Contractor: Connell Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine Reviewed By: ____________________________________ (1) Terracon Consultants, Inc., Eric Bernhardt Craig L. Nelson Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 North South HMAC FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: Client 20181040.0282 08/07/19 08/13/19 Asphalt Signature Construction LLC Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 970-484-0359 Lakeview on the Rise Apartment Development 6740 South College Avenue Fort Collins, CO Project Project Number: 20181040 Lab Test Data Comp. Max. Project Requirements Comp. Min. Mat. Material Information Thickness Min. Density Reference Laboratory No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%) 1 Connell Mix 154.2 92 96 Field Test Data Test Pave. Mat. Density Length Nuclear Core Density Core Factor Correction Density Corrected Comp. No. Test Location Lift No. (%) Core Data (pcf) (in) (pcf) (pcf) (pcf) North End of Debra Drive 31 See Diagram Bottom 1 143.4 93 32 See Diagram Bottom 1 144.0 93 33 See Diagram Bottom 1 144.5 94 34 See Diagram Bottom 1 143.8 93 35 See Diagram Bottom 1 144.3 94 Comments: Datum: Bottom Mat Std. Cnt. M: 619 Std. Cnt. D: 1973 Test and/or retest results on this report meet project requirements as noted above. S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019 ASPHALT DENSITY TESTING REPORT Report Number: 20181040.0282 Service Date: 08/07/19 1901 Sharp Point Dr, Ste C Report Date: 08/13/19 Fort Collins, CO 80525-4429 Task: Asphalt 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Perform in-place density tests to determine degree of compaction. Terracon Rep.: Taylor Keller Reported To: Jeff with Connell Contractor: Connell Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine Reviewed By: ____________________________________ (1) Terracon Consultants, Inc., Eric Bernhardt Craig L. Nelson Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 North South HMAC FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: Client 20181040.0283 08/08/19 08/13/19 Asphalt Signature Construction LLC Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 970-484-0359 Lakeview on the Rise Apartment Development 6740 South College Avenue Fort Collins, CO Project Project Number: 20181040 Lab Test Data Comp. Max. Project Requirements Comp. Min. Mat. Material Information Thickness Min. Density Reference Laboratory No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%) 1 Connell Mix 154.2 92 96 Field Test Data Test Pave. Mat. Density Length Nuclear Core Density Core Factor Correction Density Corrected Comp. No. Test Location Lift No. (%) Core Data (pcf) (in) (pcf) (pcf) (pcf) Southeast Corner of Stoney Brook Road / Debra Drive 36 See Diagram Bottom 1 144.0 93 37 See Diagram Bottom 1 143.6 93 38 See Diagram Bottom 1 144.2 94 39 See Diagram Bottom 1 143.7 93 40 See Diagram Bottom 1 145.0 94 41 See Diagram Bottom 1 144.3 94 42 See Diagram Bottom 1 144.2 94 43 See Diagram Bottom 1 143.9 93 44 See Diagram Bottom 1 144.6 94 ASPHALT DENSITY TESTING REPORT Report Number: 20181040.0283 Service Date: 08/08/19 1901 Sharp Point Dr, Ste C Report Date: 08/13/19 Fort Collins, CO 80525-4429 Task: Asphalt 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Perform in-place density tests to determine degree of compaction. Terracon Rep.: Taylor Keller Reported To: Jeff with Connell Contractor: Connell Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine Reviewed By: ____________________________________ (1) Terracon Consultants, Inc., Eric Bernhardt Craig L. Nelson Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 North South 45 See Diagram Bottom 1 143.4 93 Comments: Datum: Std. Cnt. M: Std. Cnt. D: Test and/or retest results on this report meet project requirements as noted above. S/N: Make: Model: Last Cal. Date: Services: Perform in-place density tests to determine degree of compaction. Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Jeff with Connell Connell Craig L. Nelson Project Manager Reviewed By: Terracon Rep.: Taylor Keller Test Methods: ASTM D2950 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0025, 11-16-12, Rev.6 Page 1 of 1 Services: Perform in-place density tests to determine degree of compaction. Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Jeff with Connell Connell Craig L. Nelson Project Manager Reviewed By: Terracon Rep.: Taylor Keller Test Methods: ASTM D2950 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0025, 11-16-12, Rev.6 Page 1 of 1 Test and/or retest results on this report meet project requirements as noted above. S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019 Services: Perform in-place density tests to determine degree of compaction. Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Jeff with Connell Connell Craig L. Nelson Project Manager Reviewed By: Terracon Rep.: Taylor Keller Test Methods: ASTM D2950 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0025, 11-16-12, Rev.6 Page 1 of 1