HomeMy WebLinkAboutLAKEVIEW ON THE RISE - Filed FDT-FIELD DENSITY TEST - 2019-07-31FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0206
07/08/19
07/08/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Sewer Line Backfill, Trilby Rd East of Lynn Dr
330 Station 38+00 -2' 1 8 132.3 21.3 19.2 111.0 98
331 Station 36+00 -1' 1 8 136.0 22.7 20.0 113.3 100
HMAC FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
Client
20181040.0246
07/24/19
07/30/19
Asphalt
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
Comp.
Max.
Project Requirements
Comp.
Min.
Mat.
Material Information
Thickness
Min.
Density
Reference
Laboratory
No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%)
1 Connell Mix 154.2 92 96
Field Test Data
Test Pave. Mat. Density Length
Nuclear Core
Density
Core
Factor
Correction
Density
Corrected
Comp.
No. Test Location Lift No. (%)
Core Data
(pcf) (in) (pcf) (pcf) (pcf)
Asphalt repaving on Triliby
17 Center of Repaving, Center of
Triliby and Lynn Dr intersection
Top 1 147.1 95
18 South edge of Repaiving, 150'
West of Trilby and Lynn Dr
intersection
Top 1 145.9 95
19 North edge of Repaving, 155'
West of Trilby and Lynn Dr
Report Number:
Service Date:
Report Date:
Task:
Client
Fort Collins, CO
6740 South College Avenue
Signature Construction LLC Lakeview on the Rise Apartment Development
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
970-484-0359
Fort Collins, CO 80525-4429
1901 Sharp Point Dr, Ste C
Concrete
20181040.0148
06/06/19
07/08/19 Revision 1 - 28-day results
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Project
Project Number: 20181040
Specified Strength: 28 days
Mix ID:
Supplier:
Batch Time:
Truck No.:
7456120
Aggregate Industries
Material Information
1345
689
Plant:
Ticket No.: 83453550
Field Test Data
Test
Air Content (%):
Result Specification
4 1/2 3.0-5.0
5.8 4.5-7.5
79
83
142.4
4,500
Slump (in):
psi @
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
06/06/19 Sample Time: 1430
Christopher Rivera
Clear; Hot
10 10
Sample obtained in inlet base along
South end of Stoney Brook
Sample Location:
CT0020, 10-28-11, Rev.0
Signature Construction LLC Project Name: Lakeview on the Rise Apartment Development
Attn: Matt Boyle Report Number: 20181040.0148
720 3rd Ave SW Technician: Christopher Rivera 1901 Sharp Point Dr, Ste C
Carmel, IN 46032-2036 Date: 06/06/19 Fort Collins, CO 80525-4429
Scale: Not to Scale 970-484-0359
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0188
06/26/19
07/08/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0181 Sandy Lean Clay with Flyash ASTM D698 18.2 106.8 17.2 - 21.2 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Asphalt subgrade in road
325 Debra Drive, 25' North of
Lorien Ln intersection
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0191
06/27/19
07/08/19
Earthwork
Revision 1 - Update locations
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0160 Sandy lean clay ASTM D698 17.5 107.9 16.5 - 20.5 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Triliby Sewer backfill
326 100' West of Kyle and Triliby
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0200
07/02/19
07/08/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby utilities backfill
318 pt. 34+05 -2' 1 8" 133.5 20.4 18.0 113.1 100
319 pt. 35+10 -4' 1 8" 129.3 20.0 18.3 109.3 96
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0192
06/28/19
07/02/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby Utilities Backfill
309 pt. 29+60 -3' 1 8" 133.5 20.4 18.0 113.1 100
Comments:
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0195
07/01/19
07/02/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby Utility Backfill
310 pt. 30+90 -2' 1 8" 133.1 20.6 18.3 112.5 99
311 pt. 31+00 (NE of Manhole) -5' 1 8" 135.2 21.3 18.7 113.9 100
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0196
07/01/19
07/02/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby Utility Backfill
312 pt. 32+10 -4' 1 8" 133.3 20.7 18.4 112.6 99
313 pt. 31+90 -2' 1 8" 132.5 20.6 18.4 111.9 99
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0217
07/11/19
07/16/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Triliby Sewer Backfill
345 40' East of Debra Dr & Triliby
Intersection
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0248
07/24/19
07/26/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby and Debra Dr sewer backfill
366 25' South of Debra and Gary Dr
intersection
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0250
07/25/19
07/26/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0223 Recycled concrete Base ASTM D698 8.8 119.0 5.8-11.8 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Off site utilites on Debra Dr
365 South of mailboxes West of
manhole
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0247
07/23/19
07/25/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Triliby and Debra Sewer backfill
363 Debra Dr and Gary St
intersection, 15' N of
Report Number:
Service Date:
Report Date:
Task:
Client
Fort Collins, CO
6740 South College Avenue
Signature Construction LLC Lakeview on the Rise Apartment Development
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
970-484-0359
Fort Collins, CO 80525-4429
1901 Sharp Point Dr, Ste C
Concrete
20181040.0231
07/18/19
07/26/19
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Project
Project Number: 20181040
Specified Strength: 28 days
Mix ID:
Supplier:
Batch Time:
Truck No.:
A4335
Martin Marietta Materials
Material Information
0835
1917
Plant:
Ticket No.: 49160810
Field Test Data
Test
Air Content (%):
Result Specification
1 1/2 1.0-3.0
5.9 5.0-8.0
82
75
146.7
4,500
Slump (in):
psi @
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
07/18/19 Sample Time: 0910
Douglas Novosad
Sunny
60/150 10
East side of road, in front of SW corner
of building 10
Sample Location:
Report Number:
Service Date:
Report Date:
Task:
Client
Fort Collins, CO
6740 South College Avenue
Signature Construction LLC Lakeview on the Rise Apartment Development
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
970-484-0359
Fort Collins, CO 80525-4429
1901 Sharp Point Dr, Ste C
Concrete
20181040.0232
07/18/19
07/26/19
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Project
Project Number: 20181040
Specified Strength: 28 days
Mix ID:
Supplier:
Batch Time:
Truck No.:
A4335
Martin Marietta Materials
Material Information
0600
1918
Plant:
Ticket No.: 49160781
Field Test Data
Test
Air Content (%):
Result Specification
1 1/2 1.0-3.0
6.0 5.0-8.0
80
64
145.2
4,500
Slump (in):
psi @
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
07/18/19 Sample Time: 0630
Christopher Rivera
Clear; Hot
10/150 10
Sample Location: See attachment
Placement Method: Curb Machine
Water Added Before (gal):
CT0020, 10-28-11, Rev.0
Signature Construction LLC Project Name: Lakeview on the Rise Apartment Development
Attn: Matt Boyle Report Number: 20181040.0232
720 3rd Ave SW Technician: Christopher Rivera 1901 Sharp Point Dr, Ste C
Carmel, IN 46032-2036 Date: 07/18/19 Fort Collins, CO 80525-4429
Scale: Not to Scale 970-484-0359
Report Number:
Service Date:
Report Date:
Task:
Client
Fort Collins, CO
6740 South College Avenue
Signature Construction LLC Lakeview on the Rise Apartment Development
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
970-484-0359
Fort Collins, CO 80525-4429
1901 Sharp Point Dr, Ste C
Concrete
20181040.0234
07/18/19
07/26/19
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Project
Project Number: 20181040
Specified Strength: 28 days
Mix ID:
Supplier:
Batch Time:
Truck No.:
A4335
Martin Marietta Materials
Material Information
1040
0306
Plant:
Ticket No.: 49160832
Field Test Data
Test
Air Content (%):
Result Specification
2 1.0-3.0
6.2 5.0-8.0
83
90
146.2
4,500
Slump (in):
psi @
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
07/18/19 Sample Time: 1130
Douglas Novosad
Sunny
120/150 10
West side of road, by the NE corner of
building 12
Sample Location:
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0214
07/10/19
07/12/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Sewer Line Backfill West Side of Lynn Rd
339 Station 39+00 -0' 1 8 134.0 21.7 19.3 112.3 99
340 Station 39+50 -1' 1 8 133.4 22.7 20.5 110.7 98
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0217
07/11/19
07/16/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Triliby Sewer Backfill
345 40' East of Debra Dr & Triliby
Intersection
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0210
07/09/19
07/11/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0160 Sandy lean clay ASTM D698 17.5 107.9 16.5 - 20.5 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Offsite Sewer Line Backfill
333 Station 39+50 -3' 1 8 127.2 20.6 19.3 106.6 99
334 Station 39+50 -2' 1 8 124.6 19.8 18.9 104.8 97
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0219
07/12/19
07/17/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Sewerline Backfill near Trilby Rd and Debra Dr
349 Station 42+00 -4' 1 8 132.3 21.9 19.8 110.4 97
350 Station 42+30 -3' 1 8 135.5 24.0 21.5 111.5 98
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0233
07/18/19
07/23/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0160 Sandy lean clay ASTM D698 17.5 107.9 16.5 - 20.5 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Sewerline backfill Along Trilby
358 Triliby and Debra intersection 0 1 8 124.4 17.8 16.7 106.6 99
359 Triliby and Debra intersection,
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0242
07/19/19
07/23/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0 - 22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Debra Dr Sewer backfill
361 Intersection for Debra Dr and
Trilby storm pan running along
Trilby West to East.
0 1 8 132.9 20.5 18.2 112.4 99
362 40' South of prevoious test -2' 1 8 134.7 21.6 19.1 113.1 100
Comments:
Datum: Std. Cnt. M: 620 Std. Cnt. D: 2247
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Juan with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
5' South of center of intersection
-4' 1 8 124.1 18.2 17.2 105.9 98
360 Triliby and Debra intersection,
10' South of center of
intersection
-3' 1 8 124.0 17.8 16.8 106.2 98
Comments:
Datum: Std. Cnt. M: 618 Std. Cnt. D: 2248
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
351 Station 42+50 -2' 1 8 134.7 22.9 20.5 111.8 99
352 Station 42+00 -1' 1 8 134.0 23.1 20.8 110.9 98
353 Station 42+30 -0' 1 8 136.0 23.7 21.1 112.3 99
Comments:
Datum: 0' = Subgrade Std. Cnt. M: 619 Std. Cnt. D: 1973
Test and/or retest results on this report meet project requirements as noted above.
S/N: 32847 Make: Troxler Model: 3430 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Roger w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Taylor Keller
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
335 Station 39+50 -1' 1 8 125.5 20.0 19.0 105.5 98
336 Station 39+50 -0' 1 8 124.7 20.3 19.4 104.4 97
Comments:
Datum: 0'= Subgrade Std. Cnt. M: 619 Std. Cnt. D: 1973
Test and/or retest results on this report meet project requirements as noted above.
S/N: 32847 Make: Troxler Model: 3430 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Taylor Keller
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
-2' 1 8 129.3 19.8 18.1 109.5 97
346 37' East of Debra Dr & Triliby
Intersection
-1' 1 8 131.3 20.4 18.4 110.9 98
Comments:
Datum: Std. Cnt. M: 623 Std. Cnt. D: 2217
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Taylor w/ Signature Construction
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
341 Station 39+00 -2' 1 8 131.6 22.8 21.0 108.8 96
342 Station 39+50 -3' 1 8 131.4 22.1 20.2 109.3 96
343 Station 39+00 -4' 1 8 130.8 20.3 18.4 110.5 97
Comments:
Datum: -0' = Subgrade Std. Cnt. M: 619 Std. Cnt. D: 1973
Test and/or retest results on this report meet project requirements as noted above.
S/N: Make: Model: Last Cal. Date:
Services:
Reported To:
Contractor:
Roger w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Taylor Keller
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Placement Method: Curb Machine
Water Added Before (gal):
Water Added After (gal):
Accumulative Yards: Batch Size (cy):
Debra Drive both East and West Curb
and Gutter
Placement Location:
Laboratory Test Data
Set Avg Diam. Area Date Weight Date Test
Age at
Load
Maximum
Strength
Compressive
Fracture
No. ID
Specimen
(in) (sq in) Received Tested (days) (lbs) (psi) Type
Tested
(lbs) By
12 1 4.00 12.57 8.64 07/25/19 7 48,540 3,860 3
12 2 8.64 08/15/19 28
12 3 8.60 08/15/19 28
12 4 8.68 08/15/19 28
Initial Cure: Outside Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services:
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Craig L. Nelson
Project Manager
Connell
JC w/ TCS Concrete
Reviewed By:
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064
Terracon Rep.: Douglas Novosad
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0001, 11-16-12, Rev.6 Page 1 of 1
Water Added After (gal):
Accumulative Yards: Batch Size (cy):
Placement Location: Curb and gutter along
Laboratory Test Data
Set Avg Diam. Area Date Weight Date Test
Age at
Load
Maximum
Strength
Compressive
Fracture
No. ID
Specimen
(in) (sq in) Received Tested (days) (lbs) (psi) Type
Tested
(lbs) By
10 1 4.00 12.57 07/19/19 8.60 07/25/19 7 51,690 4,110 3
10 2 07/19/19 8.64 08/15/19 28
10 3 07/19/19 8.64 08/15/19 28
10 4 07/19/19 8.58 08/15/19 28
Initial Cure: Outside Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services:
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Craig L. Nelson
Project Manager
Connell
Christian w/ Martin Marietta
Reviewed By:
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064
Terracon Rep.: Christopher Rivera
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0001, 11-16-12, Rev.6 Page 1 of 1
Placement Method: Curb Machine
Water Added Before (gal):
Water Added After (gal):
Accumulative Yards: Batch Size (cy):
Debra Drive both East and West Curb
and Gutter
Placement Location:
Laboratory Test Data
Set Avg Diam. Area Date Weight Date Test
Age at
Load
Maximum
Strength
Compressive
Fracture
No. ID
Specimen
(in) (sq in) Received Tested (days) (lbs) (psi) Type
Tested
(lbs) By
11 1 4.00 12.57 8.70 07/25/19 7 54,570 4,340 3
11 2 8.64 08/15/19 28
11 3 8.64 08/15/19 28
11 4 8.68 08/15/19 28
Initial Cure: Outside Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services:
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Craig L. Nelson
Project Manager
Connell
JC w/ TCS Concrete
Reviewed By:
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064
Terracon Rep.: Douglas Novosad
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0001, 11-16-12, Rev.6 Page 1 of 1
intersection in center of Debra
Dr
0 1 8 133.6 20.4 18.0 113.2 100
364 Debra Dr and Gary St
intersection, 13' N of
intersection in center of Debra
Dr
-1' 1 0 132.9 20.5 18.2 112.4 99
Comments:
Datum: Std. Cnt. M: 618 Std. Cnt. D: 2257
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Juan with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
-1' 1 8 126.1 12.3 10.8 113.8 96
Comments:
Datum: 0= Finish subgrade elevation Std. Cnt. M: 548 Std. Cnt. D: 1766
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Roger w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
0 1 8 133.3 21.2 18.9 112.1 99
367 35' South of Debra and Gary Dr
intersection
-2' 1 8 132.1 20.7 18.6 111.4 98
Comments:
Datum: Std. Cnt. M: 685 Std. Cnt. D: 2284
Test and/or retest results on this report meet project requirements as noted above.
S/N: 28849 Make: Troxler Model: 3430 Last Cal. Date: 01/02/2019
Services:
Reported To:
Contractor:
Juan with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
-2' 1 8 129.3 19.8 18.1 109.5 97
346 37' East of Debra Dr & Triliby
Intersection
-1' 1 8 131.3 20.4 18.4 110.9 98
Comments:
Datum: Std. Cnt. M: 623 Std. Cnt. D: 2217
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Taylor w/ Signature Construction
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Comments:
Datum: 0'= road finish grade Std. Cnt. M: 634 Std. Cnt. D: 1943
Test and/or retest results on this report meet project requirements as noted above.
S/N: 32847 Make: Troxler Model: 3430 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Juan with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Comments:
Datum: 0'= road finish grade Std. Cnt. M: 634 Std. Cnt. D: 1943
Test and/or retest results on this report meet project requirements as noted above.
S/N: 32847 Make: Troxler Model: 3430 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Datum: 0'= road finish grade Std. Cnt. M: 543 Std. Cnt. D: 1771
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Comments:
Datum: 0'=road finish grade Std. Cnt. M: 424 Std. Cnt. D: 4274
Test and/or retest results on this report meet project requirements as noted above.
S/N: 2157 Make: Instrotek Model: 3500 Xplorer Last Cal. Date: 01/02/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
intesection
-2 1 8 123.1 17.7 16.8 105.4 98
327 90' West of Kyle and Triliby
intesection
-1 1 8 122.0 17.3 16.5 104.7 97
Comments:
Datum: Std. Cnt. M: 620 Std. Cnt. D: 2280
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Taylor w/ Signature Construction
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
0 1 8 126.1 19.3 18.1 106.8 100
Comments:
Datum: Std. Cnt. M: 622 Std. Cnt. D: 2220
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Rory with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Placement Method: Chute
Water Added Before (gal):
Water Added After (gal):
Accumulative Yards: Batch Size (cy):
Placement Location: See attached diagram
Laboratory Test Data
Set Avg Diam. Area Date Weight Date Test
Age at
Load
Maximum
Strength
Compressive
Fracture
No. ID
Specimen
(in) (sq in) Received Tested (days) (lbs) (psi) Type
Tested
(lbs) By
4 1 4.00 12.57 06/07/19 8.46 06/13/19 7 46,240 3,680 3
4 2 4.00 12.57 06/07/19 8.46 07/04/19 28 58,200 4,630 3 BA
4 3 4.00 12.57 06/07/19 8.42 07/04/19 28 57,790 4,600 3 BA
4 4 4.00 12.57 06/07/19 8.52 07/04/19 28 57,830 4,600 3 BA
Average (28 days) 4,610
Initial Cure: Outside Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services:
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Craig L. Nelson
Project Manager
Connell
Weston w/ Connell
Reviewed By:
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064
Terracon Rep.: Christopher Rivera
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0001, 11-16-12, Rev.6 Page 1 of 1
intersection
Top 1 145.3 94
20 20' East of Trilby and Debra
intersection, Center of paving
Top 1 145.2 94
Comments:
Datum: Std. Cnt. M: 689 Std. Cnt. D: 2285
Test and/or retest results on this report meet project requirements as noted above.
S/N: 28849 Make: Troxler Model: 3430 Last Cal. Date: 01/02/2019
Services: Perform in-place density tests to determine degree of compaction.
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Brian w/Connell
Connell
Craig L. Nelson
Project Manager
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D2950
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0025, 11-16-12, Rev.6 Page 1 of 1
332 Station 34+00 -0' 1 8 137.1 24.7 22.0 112.4 99
Comments:
Datum: -0' = Subgrade Std. Cnt. M: 619 Std. Cnt. D: 1973
Test and/or retest results on this report meet project requirements as noted above.
S/N: 32847 Make: Troxler Model: 3430 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor: Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Taylor Keller
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1