Loading...
HomeMy WebLinkAboutLAKEVIEW ON THE RISE SUBDIVISION - Filed CT-CONCRETE TEST - 2019-07-01Report Number: Service Date: Report Date: Task: Client Fort Collins, CO 6740 South College Avenue Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 970-484-0359 Fort Collins, CO 80525-4429 1901 Sharp Point Dr, Ste C Concrete 20181040.0123 05/16/19 06/17/19 Revision 2 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: 20181040 Specified Strength: 28 days Mix ID: Supplier: Batch Time: Truck No.: CD4575 Martin Marietta Materials Material Information 0712 125 Plant: Ticket No.: 83453068 Field Test Data Test Air Content (%): Result Specification 3 3.0 - 5.0 5.0 5.0 - 8.0 66 61 141.4 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: 05/16/19 Sample Time: 0820 Quinn Zamora Overcast 11/11 11 Sample Location: Far east corner wall bottom 2' Placement Method: Chute Water Added Before (gal): 20181040.0287.1.xlsx Bituminous Mixture Test Results 1901 Sharp Point Drive Fort Collins, Colorado 80525 Telephone No.: (970) 658 - 4405 Fax No.: (970) 484 - 0454 Client Name: Signature Construction LLC Address: 720 3rd Ave SW Project No.: 20181040 Date of Report: 8/12/19 Camel, IN 46032-2036 Mix Source: Connell Attn.: Matt Boyle Plant/Pit: Timnath connell asphalt plant Report# .0287 Project Name: Lakeview on the Rise Apartment DevelopmentMix Type: 20150 S75PG64-22L Location: Debra Drive and Lorien Lane Sampled By:Larimer CountTyons: 14 Date: 8/6/19 Intersection Northbound Debra Truck/Ticket No.: 170008 4505 Time: 1:45 PM Lift Designation: Bottom Reviewed By: Craig Nelson Test Procedures: Department Manager AASHTO T 164, Quantitative Extraction of Bitumen from Bituminous Paving Mixtures, Method B X CP L5120, Determination of the Asphalt Binder Content of Bituminous Mixtures by the Ignition MethodMethod A Laboratory Testing Information 0.00 Calibration factor No Temp. compensation factor used 0.00 Moisture content, % 538 Test temp, C 2245 Sample Mass, gm Yes AC measured on external scale Corrected Bituminous Content, % AASHTO T 164 4.98 Ignition Method Physical Properties of Bituminous Mixtures: Specification limits: 5.10 + / - 0.3 AASHTO T 245 @ Blows per Side Sieve Analysis of: X Ignited Mineral Agg. or CP L5106 (Hveem) Extracted Agg. or CP L5115 N(design) gyrations Cold Belt Combined Avg. dia. of mold, mm Averge. ht, mm: Sieve Accumulative Specification CDOT Avg. of Specifi- Size % Passing Job Mix Master Band Property Standard Specimens cation Min. Max. Min. Max. Bulk Specific Gravity CP 44 1-1/2" Bulk Density (pcf) CP 44 1" Theoretical Max. Specific Gravity CP 51 2.423 3/4" 100 100 100 100 Theoretical Density (pcf) CP 51 151.2 1/2" 90 90 100 90-100 Air Voids (%) CP 44 3/8" 79 75 87 --- Voids Filled (%) AI SP-2 1/4" Voids Min. Aggregate (%) T 269 #4 64 58 68 --- Stability (pounds) T 245 #8 49 44 54 28-58 Flow (1/100 inch) T 245 #10 Temperature of mix sampled (F) #16 35 --- Ambient Temp. @ sampling (F) #30 24 20 28 --- Hveem Stability CP L5106 #40 Lottman Test: CP L5109 #50 15 --- Conditioned/Dry Strength, psi #80 Tensile Strength Ratio (TSR), % #100 9 --- Fine Aggregate Angularity, % T 304 #200 5.9 4.2 8.2 2.0-10.0 Comments: ( ) Denotes outside specification limits shown above. Sampled according to CP55-06, Method B Distribution: Client Water Added After (gal): Accumulative Yards: Batch Size (cy): Placement Location: Stormwater Inlet A1A Laboratory Test Data Set Avg Diam. Area Date Weight Date Test Age at Load Maximum Strength Compressive Fracture No. ID Specimen (in) (sq in) Received Tested (days) (lbs) (psi) Type Tested (lbs) By 2 1 4.00 12.57 05/17/19 8.32 05/19/19 3 40,500 3,220 2 2 2 4.00 12.57 05/17/19 8.26 05/23/19 7 51,140 4,070 3 2 3 4.00 12.57 05/17/19 8.34 06/13/19 28 57,020 4,540 2 2 4 4.00 12.57 05/17/19 8.40 06/13/19 28 57,830 4,600 3 2 5 4.00 12.57 05/17/19 8.36 06/13/19 28 60,760 4,840 3 Average (28 days) 4,660 Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Reported To: Contractor: Report Distribution: (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt Craig L. Nelson Project Manager Connell Taylor w/ Signature Construction Reviewed By: Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064 Terracon Rep.: Quinn Zamora The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 1 of 1