HomeMy WebLinkAboutLAKEVIEW ON THE RISE SUBDIVISION - Filed FDT-FIELD DENSITY TEST - 2019-07-01FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0168
06/18/19
06/24/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0-22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Offsite utilities at Trilby
289 at Trilby intersection -3' 1 8 133.7 20.8 18.4 112.9 100
Comments:
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0183
06/24/19
06/27/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Triliby Sewer
302 15' East of Kyle and Triliby
intersection
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0186
06/25/19
06/27/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Triliby Sewer bacfkill
307 15' West of Kyle and Triliby
intersection
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0161
06/14/19
06/18/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Off site utilities
277 40' North of Trilby 0' 1 8 132.0 20.6 18.5 111.4 98
Comments:
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0162
06/14/19
06/18/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 Min 95
2 20181040.0004 Sandy lean clay ASTM D698 15.3 111.7 14.3-18.3 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Off site utilities
278 30' North of Trilby -2' 1 8 128.6 19.8 18.2 108.8 96
CT0020, 10-28-11, Rev.0
Signature Construction LLC Project Name: Lakeview on the Rise Apartment Development
Attn: Matt Boyle Report Number: 20181040.0162
720 3rd Ave SW Technician: Christopher Rivera 1901 Sharp Point Dr, Ste C
Carmel, IN 46032-2036 Date: 06/14/19 Fort Collins, CO 80525-4429
Scale: Not to Scale 970-484-0359
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0159
06/13/19
06/18/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0-22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Off site utilities on Portner
270 West of North entrance to
FOCO Utilities
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0171
06/20/19
06/24/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby sewer backfill
290 pt. 19+50 -1' 1 8" 133.5 20.4 18.0 113.1 100
291 pt. 20+80 -2' 1 8" 132.7 21.0 18.8 111.7 99
HMAC FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
Client
20181040.0172
06/20/19
06/24/19
Asphalt
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
Comp.
Max.
Project Requirements
Comp.
Min.
Mat.
Material Information
Thickness
Min.
Density
Reference
Laboratory
No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%)
1 Connell Mix 154.2
Field Test Data
Test Pave. Mat. Density Length
Nuclear Core
Density
Core
Factor
Correction
Density
Corrected
Comp.
No. Test Location Lift No. (%)
Core Data
(pcf) (in) (pcf) (pcf) (pcf)
Portner dr. asphalt patch
1 pt. 10+75 Bottom 1 144.7 94
2 pt. 11+75 Bottom 1 147.3 96
3 pt. 12+75 Bottom 1 141.8 92
4 pt. 13+75 Bottom 1 141.9 92
Comments:
Datum: 0'=road finish grade Std. Cnt. M: 538 Std. Cnt. D: 1770
Rice value was given to technician by Jason with Connell.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services: Perform in-place density tests to determine degree of compaction.
HMAC FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
Client
20181040.0176
06/21/19
06/24/19
Asphalt
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
Comp.
Max.
Project Requirements
Comp.
Min.
Mat.
Material Information
Thickness
Min.
Density
Reference
Laboratory
No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%)
1 Connell Mix 154.2 92 96
Field Test Data
Test Pave. Mat. Density Length
Nuclear Core
Density
Core
Factor
Correction
Density
Corrected
Comp.
No. Test Location Lift No. (%)
Core Data
(pcf) (in) (pcf) (pcf) (pcf)
Portner dr apshalt patch
12 pt. 10+50 Top 1 141.6 92
13 pt. 11+50 Top 1 141.5 92
14 pt. 12+50 Top 1 141.4 92
15 pt. 13+50 Top 1 142.6 92
16 pt. 14+50 Top 1 142.3 92
Comments:
Datum: 0'=road finish grade Std. Cnt. M: 538 Std. Cnt. D: 1770
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0173
06/20/19
06/24/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby sewer backfill
292 pt. 20+25 -1' 1 8" 131.0 20.1 18.1 110.9 98
Comments:
HMAC FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
Client
20181040.0174
06/20/19
06/24/19
Asphalt
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
Comp.
Max.
Project Requirements
Comp.
Min.
Mat.
Material Information
Thickness
Min.
Density
Reference
Laboratory
No. Reference Number Classification and Description Test Method (pcf) (in) (%) (%)
1 Connell Mix 154.2 92 96
Field Test Data
Test Pave. Mat. Density Length
Nuclear Core
Density
Core
Factor
Correction
Density
Corrected
Comp.
No. Test Location Lift No. (%)
Core Data
(pcf) (in) (pcf) (pcf) (pcf)
Portner dr asphalt patch
5 pt. 10+50 Middle 1 145.6 94
6 pt. 11+50 Middle 1 148.7 96
7 pt. 12+50 Middle 1 143.1 93
8 pt. 14+50 Middle 1 144.4 94
9 pt. 14+50 Middle 1 145.9 95
10 pt. 15+50 Middle 1 147.8 96
11 Intersection of Trilby and Portner Middle 1 143.6 93
Comments:
Datum: 0'=road finish grade Std. Cnt. M: 538 Std. Cnt. D: 1770
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0177
06/21/19
06/24/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Trilby sewer backfill
293 pt. 22+65 -0' 1 8" 134.6 20.9 18.4 113.7 100
294 pt. 22+75 -3' 1 8" 132.4 20.3 18.1 112.1 99
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0158
06/13/19
06/18/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Portner drive sewer backfill
276 point 13+40 -3' 1 8" 133.9 20.8 18.4 113.1 100
Comments:
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0154
06/11/19
06/17/19
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0003 Lean clay with sand ASTM D698 14.1 108.1 13.1-17.1 min 95%
2 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18-22 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Stoney Brook Rd. storm sewer backfill
272 15' west of manhole on SE
corner of property
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0157
06/12/19
06/17/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0004 Sandy lean clay ASTM D698 15.3 111.7 14.3-18.3 Min 95
2 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 19.0-22.0 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Off site utility trench
266 200' North of Trilby 0' 2 8 133.4 21.1 18.8 112.3 99
CT0020, 10-28-11, Rev.0
Signature Construction LLC Project Name: Lakeview on the Rise Apartment Development
Attn: Matt Boyle Report Number: 20181040.0157
720 3rd Ave SW Technician: Christopher Rivera 1901 Sharp Point Dr, Ste C
Carmel, IN 46032-2036 Date: 06/12/19 Fort Collins, CO 80525-4429
Scale: Not to Scale 970-484-0359
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0156
06/12/19
06/17/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0-22.0 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Utility trench backfill on Portner
265 At South entrance to FC utilities 0' 1 8" 133.4 21.1 18.8 112.3 99
Comments:
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0168
06/18/19
06/24/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0153 Dark Brown Clay ASTM D698 19.0 113.4 18.0-22.0 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Offsite utilities at Trilby
289 at Trilby intersection -3' 1 8 133.7 20.8 18.4 112.9 100
Comments:
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0179
06/21/19
06/27/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0181 Sandy Lean Clay with Flyash ASTM D698 18.2 106.8 17.2-21.2 min 95%
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Stoney Brook Road Flyash Tilling
304 Attachment #1 -0' 1 8" 124.8 20.5 19.7 104.3 98
305 Attachment #2 -0' 1 8" 124.7 18.7 17.6 106.0 99
FIELD DENSITY TESTING REPORT
Report Number: 20181040.0179
Service Date: 06/21/19 1901 Sharp Point Dr, Ste C
Report Date: 06/27/19 Fort Collins, CO 80525-4429
Task: Earthwork 970-484-0359
Client Project
Signature Construction LLC Lakeview on the Rise Apartment Development
Attn: Matt Boyle 6740 South College Avenue
720 3rd Ave SW Fort Collins, CO
Carmel, IN 46032-2036
Project Number: 20181040
Services:
Terracon Rep.: Quinn Zamora
Reported To: Rory with Connell
Contractor: Connell
Report Distribution:
(1) Signature Construction LLC, Matt
Boyle
(1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor
Elizalde
(1) Signature Construction LLC, Trevor
Rine
Reviewed By: ____________________________________
(1) Terracon Consultants, Inc., Eric
Bernhardt
Craig L. Nelson
Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
BC0001, 10-16-13, Rev.10 Page 1 of 1
FIELD DENSITY TEST REPORT
Report Number:
Service Date:
Report Date:
Task:
20181040.0182
06/24/19
06/27/19
Earthwork
1901 Sharp Point Dr, Ste C
Fort Collins, CO 80525-4429
970-484-0359
Client
Signature Construction LLC
Attn: Matt Boyle
720 3rd Ave SW
Carmel, IN 46032-2036
Lakeview on the Rise Apartment Development
6740 South College Avenue
Fort Collins, CO
Project
Project Number: 20181040
Lab Test Data
(%)
Compaction
Project Requirements
(%)
Content
Water
No.
Mat.
Material Information
Density
Max. Lab
(%)
Content
Water
Optimum
Ref. No.
Proctor Laboratory
Classification and Description Test Method (pcf)
1 20181040.0160 Sandy lean clay ASTM D698 17.5 107.9 16.5 - 20.5 Min 95
Field Test Data
No. Test Location Elev. No.
Test Lift / Mat. Depth Density
Probe Wet
Content
Water
(%)
Content
Water
Density
Dry
(%)
Percent
Compaction
(in) (pcf) (pcf) (pcf)
Triliby Sewer backfill
301 East of Triliby and Kyle
intersection, 40' East of
intersection
-2' 1 8 123.4 17.9 17.0 105.5 98
Comments:
Datum: Std. Cnt. M: 620 Std. Cnt. D: 2244
Test and/or retest results on this report meet project requirements as noted above.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Taylor w/ Signature Construction
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
306 Attachment #3 -0' 1 8" 125.1 18.6 17.5 106.5 100
Comments:
Datum: 0'=road sub-grade Std. Cnt. M: 538 Std. Cnt. D: 1770
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Rory with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Datum: 0= Finish subgrade elevation Std. Cnt. M: 535 Std. Cnt. D: 1775
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Roger w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Datum: 0= Finish subgrade elevation Std. Cnt. M: 420 Std. Cnt. D: 2630
Test and/or retest results on this report meet project requirements as noted above.
S/N: 2157 Make: Instrotek Model: 3500 Xplorer Last Cal. Date: 01/02/2019
Services:
Reported To:
Contractor:
Jeff with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
267 190' North of Trilby -2' 2 8 132.9 22.5 20.4 110.4 97
On site utilities
268 See attachments 0' 1 8 129.4 18.9 17.1 110.5 99
269 See attachments 0' 1 8 122.2 16.1 15.2 106.1 95
Comments:
Datum: 0= Finish subgrade elevation Std. Cnt. M: 420 Std. Cnt. D: 2630
Test and/or retest results on this report meet project requirements as noted above.
S/N: 2157 Make: Instrotek Model: 3500 Xplorer Last Cal. Date: 01/02/2019
Services:
Reported To:
Contractor:
Weston w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
-1' 1 8" 120.4 17.6 17.1 102.8 95
273 25' west of manhole on the SE
corner of property
-0' 1 8" 124.5 15.6 14.3 108.9 101
Portner Drive sewer backfill
274 Point 10+75 -2' 2 8" 129.9 20.9 19.2 109.0 96
275 Point 10+25 -1' 2 8" 131.0 23.2 21.5 107.8 95
Comments:
Datum: 0'=finish sub-grade Std. Cnt. M: 544 Std. Cnt. D: 1766
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Jeff with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Datum: 0'= finish road grade Std. Cnt. M: 540 Std. Cnt. D: 1791
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Jeff with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Comments:
Datum: 0'=road finish gradde Std. Cnt. M: 538 Std. Cnt. D: 1770
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services: Perform in-place density tests to determine degree of compaction.
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Jason with Connell
Connell
Craig L. Nelson
Project Manager
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D2950
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0025, 11-16-12, Rev.6 Page 1 of 1
Datum: 0'=road finish grade Std. Cnt. M: 538 Std. Cnt. D: 1770
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Jeff with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Services: Perform in-place density tests to determine degree of compaction.
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Jason with Connell
Connell
Craig L. Nelson
Project Manager
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D2950
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0025, 11-16-12, Rev.6 Page 1 of 1
Reported To:
Contractor:
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Jason with Connell
Connell
Craig L. Nelson
Project Manager
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D2950
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0025, 11-16-12, Rev.6 Page 1 of 1
Comments:
Datum: 0'=road finish grade Std. Cnt. M: 538 Std. Cnt. D: 1770
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Quinn Zamora
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
0' 1 8 133.7 20.4 18.0 113.3 100
271 West of North entrance to
FOCO Utilities
-1' 1 8 131.7 21.7 19.7 110.0 97
Comments:
Datum: 0= Finsih subgrade elevation Std. Cnt. M: 425 Std. Cnt. D: 2647
Test and/or retest results on this report meet project requirements as noted above.
S/N: 2157 Make: Instrotek Model: 3500 Xplorer Last Cal. Date: 01/02/2019
Services:
Reported To:
Contractor:
Jeff with Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
On site utilities
279 See attachments 0' 2 8 128.7 17.9 16.2 110.8 99
280 See attachments 0' 2 8 124.7 18.3 17.2 106.4 95
281 See attachments 0' 2 8 123.8 15.7 14.5 108.1 97
282 See attachments 0' 2 8 125.7 16.6 15.2 109.1 98
Comments:
Datum: 0= Finish subgrade elevation Std. Cnt. M: 538 Std. Cnt. D: 1775
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Weston w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Datum: 0= Finish subgrade elevation Std. Cnt. M: 538 Std. Cnt. D: 1775
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Roger w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
-1' 1 8 131.4 18.5 16.4 112.9 100
308 35' West of Kyle and Triliby
intersection
-3' 1 8 129.3 17.9 16.1 111.4 98
Comments:
Datum: Std. Cnt. M: 617 Std. Cnt. D: 2210
Test and/or retest results on this report meet project requirements as noted above.
The percent moisture reuqirements for tests 307 and 308 are not required due to the material acheiveing the minimum
percent compaction.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Juan with Connel
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
-1' 1 8 131.2 18.8 16.7 112.4 99
303 10' East of Kyle and Triliby
intersection
-2' 1 8 132.4 19.3 17.1 113.1 100
Comments:
Datum: Std. Cnt. M: 620 Std. Cnt. D: 2244
Test and/or retest results on this report meet project requirements as noted above.
The percent moisture reuqirements for tests 302 and 303 are not required due to the material acheiveing the minimum
percent compaction.
S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019
Services:
Reported To:
Contractor:
Taylor w/ Signature Construction
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Douglas Novosad
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1
Datum: 0= Finish subgrade elevation Std. Cnt. M: 535 Std. Cnt. D: 1775
Test and/or retest results on this report meet project requirements as noted above.
S/N: 17271 Make: Troxler Model: 3440 Last Cal. Date: 01/16/2019
Services:
Reported To:
Contractor:
Roger w/ Connell
Connell
Craig L. Nelson
Project Manager
Report Distribution:
(1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel
(1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine
(1) Terracon Consultants, Inc., Eric Bernhardt
Reviewed By:
Terracon Rep.: Christopher Rivera
Test Methods: ASTM D6938
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated
above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples
tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0007, 11-16-12, Rev.7 Page 1 of 1