HomeMy WebLinkAboutLARIMER COUNTY MIDPOINT CAMPUS SECOND FILING - Filed DCP-DEV. CONSTRUCTION PERMIT - 2020-10-19City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 20-08 Issuance Date: Project Name: Larimer County Midpoint Campus Second Filing Project AKA: Larimer County Jail Project Location: Midpoint Dr., east of Timberline Road Permittee: Ken Cooper, Larimer County Facilities Director City and developer contacts: See attached Exhibit for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee $400.00 Construction Inspection Fee $3,842.50 Pavement Impact Fee excavation permit $229.25 Total amount (paid check#1450684) $4,471.75 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. N/A Form of security deposited with the City: N/A PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The - Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance June 30, 2020 with City requirements. 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from issuance, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re-apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the - City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any construction activities on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMPs) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. The applicant also understands that at no time pollutants, especially dirt, are allowed to leave the construction site (either by drainage, wind, or track out) and that the applicant shall immediately address and correct the issue regardless of being formally directed by the City. 11. City of Fort Collins Traffic Operations must be notified prior to the installation of permanent traffic signing, symbols and striping. The developer shall place temporary tabs or tape, and/or set up a field meeting for review and approval prior to installation. 12. The Permittee agrees to comply with Forestry requirements specified in the development agreement and the approved final plans. 13. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 14. Other conditions: N/A signature: By signing this permit, I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Signature: Date: Approval for issuance: City Engineer Approval: Date: (Permit Issuance Date) June 30, 2020 David Bragg Digitally signed by David Bragg DN: C=US, E=dbragg@larimer.org, O=Larimer County, OU=Facilities Department, CN=David Bragg Date: 2020.06.30 09:49:43-06'00' 6/30/2020 EXHIBIT DEVELOPMENT PROJECT CONTACT PERSONS Project Name: UCH LINAC Expansion Name, address and numbers City Staff Contact Persons: Development Engineer: Marc Virata 281 N. College Avenue Fort Collins, CO 80524 (970) 221-6567 mvirata@fcgov.com Construction Inspector: Jason Martin 281 N. College Avenue Fort Collins, CO 80524 (970) 416-2779 jmartin@fcgov.com Stormwater Engineering: Dan Mogen 700 Wood Street Fort Collins, CO 80521 (970) 305-5989 dmogen@fcgov.com Erosion Control Inspector: Basil Hamdan 700 Wood Street Fort Collins, CO 80521 (970) 222-1801 bhamdan@fcgov.com Environmental Planning: Kelly Smith 281 N. College Avenue Fort Collins, CO 80524 (970) 224-6189 ksmith@fcgov.com Traffic Operations: Martina Wilkinson 626 Linden Street Fort Collins, CO 80524 (970) 221-6887 mwilkinson@fcgov.com Street closures: Tom Utech 626 Linden Street Fort Collins, CO 80524 (970) 221-6815 tutech@fcgov.com Forestry: Nils Saha 413 S. Bryan Avenue Fort Collins, CO 80521 (301) 204-7852 nsaha@fcgov.om Light and Power: Cody Snowdon 700 Wood Street Fort Collins, CO 80521 (970) 416-2306 csnowdon@fcgov.com Persons: Project Manager/Owner: David Bragg, Sr. Project Manager Permittee: General Contractor: Project Engineer: Planner: Larimer County, Facilities Dept. 200 W. Oak Street Fort Collins, CO 80521 (970) 498-5918 office dbragg@larimer.org Ken Cooper, Facilities Director Larimer County, Facilities Dept. 200 W. Oak Street Fort Collins, CO 80521 (970) 775-3782 office ken.cooper@larimer.org Jake Coutts JE Dunn Construction 2000 S. Colorado , Ste. 1000 Denver, CO 80222 (303) 518-8146 Joe Rausch Martin and Martin 12499 West Colfax, Lakewood, CO 80215 (303) 431-6100 mthornbrough@martinmartin.com Michael Clark DLR Group 1401 Lawrence St. Suite 10000, Denver, CO 80202 (720) 904-0440 michael.clark@dlrgroup.com M J UP 811 OVERALL SITE PLAN C120 ” ” ” ” Revisions Attachment No. To: Dated: - NOT FOR CONSTRUCTION - © DLR Group MARTIN/MARTIN C O N S U L T I N G E N G I N E E R S 12499 WEST COLFAX AVENUE, LAKEWOOD, COLORADO 80215 303.431.6100 MARTINMARTIN.COM 05/15/2020 LARIMER COUNTY JAIL SITE PLAN REVIEW 2405 MIDPOINT DRIVE, FORT COLLINS, CO 80525 IMPROVEMENTS "PROJECT QUANTITIES AND COST ESTIMATE SHEET" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 Project: Larimer County Jail Expansion Date: 6/10/2020 Attendee Company/ Title (as it pertains to the Project) Phone Number Email 1 Greta Brooks City of Fort Collins/ Engineering Dev Rev 970-221-6794 gbrooks@fcgov.com 2 Marc Virata City of Fort Collins/ Dev Rev Engineer 970-221-6567 mvirata@fcgov.com 3 Eric Tracy Larimer County 970-498-5729 etracy@larimer.org 4 Steven Swanson JE Dunn 402-981-6889 steven.swanson@jedunn.com 5 Eric Taylor JE Dunn 307-275-2120 eric.taylor@jedunn.com 6 Linda Hardin COFC/ Environmental Svcs 970-416-2701 lhardin@fcgov.com 7 Michael Clark DLR Group 303-638-4858 michael.clark@dlrgroup.com 8 David Kasperbauer Dunrite Excavation 970-744-8073 David@dunritexinc.com 9 Cody Snowdon COFC/ L&P 970-416-2306 csnowdon@fcgov.com 10 Joe Rausch Martin/Martin, Inc 303-431-6100 or 303-981-9206 jraucscehll@martinmartin.com 11 Mark Thornbrough Martin/Martin, Inc 303-638-4023 MTHORNBROUGH@martinmartin.com 12 Jim McChesney COFC/ Utility Inspection 970-556-8179 jmcchesney@fcgov.com 13 Kayla Fochtman Martin/Martin, Inc 303-431-6100 kfochtman@martinmartin.com 14 Jason Martin COFC/ Chief Construction Inspector/ ENG 951-473-0044 jmartin@fcgov.com 15 Norm Mill COFC/ Utility - Water backflow 970-416-2249 (office) & 970-nmill@222-1707 fcgov.(cell)com 16 Dan Mogen COFC - water, wastewater, stormwater development review 970-305-5989 dmogen@fcgov.com 17 Development Construction Permit Meeting 60 61 62 63 64 65 66 A B C D E F G H I J K Larimer County Jail Expansion 5/12/2020 DESCRIPTION UNITS OF ESTIMATED INFRASTRUCTURE TOTAL INSPECTION TOTAL (LIST ALL PUBLIC AND APPLICABLE MEASURE QUANTITY CONSTRUCTION ESTIMATED FEE PER UNIT INSPECTION *PRIVATE IMPROVEMENTS) (PROVIDED BY THE COST PER UNIT INFRASTRUCTURE (PROVIDED FEE PROJECT ENGINEER) OF MEASURE COST BY THE CITY) (COST ESTMATE APPROVED BY THE CITY) Sanitary Sewer System Sanitary Sewer Main L.F. 0 $0.00 $0.00 $0.70 $0.00 Manhole EACH 2 $6,500.00 $13,000.00 $103.00 $206.00 Sewer Service Line Stub EACH 2 $2,500.00 $5,000.00 $70.00 $140.00 Sewer Connection/Disconnect EACH 2 $181.27 $362.54 $35.00 $70.00 Sanitary Sewer Inspection Fees $416.00 Water System Water Main L.F. 1,629 $88.00 $143,352.00 $0.70 $1,140.30 Water Service Line Stub EACH 1 $3,375.00 $3,375.00 $70.00 $70.00 Fire Hydrant EACH 3 $7,500.00 $22,500.00 $70.00 $210.00 Valves EACH 11 $1,500.00 $16,500.00 $70.00 $770.00 Meter Pit (3/4" ) EACH 0 $0.00 $0.00 $35.00 $0.00 Meter Pit (1 1/2") EACH 0 $0.00 $0.00 $35.00 $0.00 Meter Pit (3" ) EACH 1 $2,637.00 $2,637.00 $35.00 $35.00 Water Main (Fire Line)* L.F. 116 $0.00 $0.00 $0.70 $81.20 Water Fitting ( Bend, Tee, Cross ) EACH 22 $750.00 $16,500.00 $35.00 $770.00 Fireline Fitting ( Bend, Tee, Cross ) EACH 2 $0.00 $0.00 $35.00 $70.00 Water Connection/Disconnect EACH 2 $7,000.00 $14,000.00 $35.00 $70.00 Water Inspection Fees $3,216.50 Public Storm Sewer System Reinforced Concrete Pipe L.F. 0 $0.00 $0.00 $0.70 $0.00 Underdrain L.F. 0 $0.00 $0.00 $0.70 $0.00 Concrete Headwall L.F. 0 $0.00 $0.00 $3.50 $0.00 Water Quality Outlet Structure C.Y. 0 $0.00 $0.00 $3.50 $0.00 All Inlet Types/Chase EACH 0 $0.00 $0.00 $103.00 $0.00 Manhole EACH 0 $0.00 $0.00 $103.00 $0.00 Storm Connection/Disconnect EACH 0 $0.00 $0.00 $35.00 $0.00 Public Storm Inspection Fees $0.00 Street System/ Trench Grading L.S. 0 $0.00 $0.00 Asphalt Pavement SY 0 $0.00 $0.00 $0.45 $0.00 Asphalt Mill & Overlay SY 0 $0.00 $0.00 $0.45 $0.00 Concrete Pavement SY 0 $0.00 $0.00 $0.45 $0.00 Colored Concrete Pavement SY 0 $0.00 $0.00 $0.45 $0.00 Curb & Gutter L.F. 4 $25.00 $100.00 $1.00 $70.00 Sidewalk *** L.F. 4 $19.00 $76.00 $1.00 $70.00 Pedestrian Ramps L.F. 0 $0.00 $0.00 $1.00 $0.00 Fire Access Grass Crete S.Y. 0 $0.00 $0.00 $0.45 $0.00 Gutter Pan S.Y. 0 $0.00 $0.00 $0.45 $0.00 Drive Approach S.Y. 0 $0.00 $0.00 $0.45 $0.00 Storm Trench L.F. 0 $0.00 $0.00 $0.70 $0.00 Sewer Trench L.F. 0 $0.00 $0.00 $0.70 $0.00 Water Trench L.F. 17 $4.00 $68.00 $0.70 $70.00 Street System Inspection Fees $210.00 Excavation Permit Application L.S. 1 $30.00 Pavement Patching S.Y. 3 $105.00 $291.67 $0.45 $103.00 Potholing E.A. 0 $0.00 $0.00 $10.00 $0.00 Pavement Impact Fees 6+ S.F. 25 $96.25 Pavement age Excavation Permit Fees $229.25 TOTAL INSPECTION FEES $4,071.75 TOTAL PUBLIC INFRASTRUCTURE COST $237,762.21 * PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL INFRASTRUCTURE COST FOR BONDING. ** INCLUDES TRENCH PRICE *** SIDEWALK LENGTH IS INCREASED DUE TO OVERSIZE WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5'