Loading...
HomeMy WebLinkAboutLAKEVIEW ON THE RISE SUBDIVISION - Filed FDT-FIELD DENSITY TEST - 2019-10-11FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: 20181040.0387 09/24/19 09/30/19 Earthwork 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 970-484-0359 Client Signature Construction LLC Attn: Matt Boyle 720 3rd Ave SW Carmel, IN 46032-2036 Lakeview on the Rise Apartment Development 6740 South College Avenue Fort Collins, CO Project Project Number: 20181040 Lab Test Data (%) Compaction Project Requirements (%) Content Water No. Mat. Material Information Density Max. Lab (%) Content Water Optimum Ref. No. Proctor Laboratory Classification and Description Test Method (pcf) 2 20181040.0004 Sandy lean clay ASTM D698 15.3 111.7 14.3 - 18.3 Min 95 Field Test Data No. Test Location Elev. No. Test Lift / Mat. Depth Density Probe Wet Content Water (%) Content Water Density Dry (%) Percent Compaction (in) (pcf) (pcf) (pcf) Sidewalk Along North Bound Hwy 287 480 See Diagram 0' 2 8 126.3 17.4 16.0 108.9 97 481 See Diagram 0' 2 8 126.4 16.8 15.3 109.6 98 FIELD DENSITY TESTING REPORT Report Number: 20181040.0387 Service Date: 09/24/19 1901 Sharp Point Dr, Ste C Report Date: 09/30/19 Fort Collins, CO 80525-4429 Task: Earthwork 970-484-0359 Client Project Signature Construction LLC Lakeview on the Rise Apartment Development Attn: Matt Boyle 6740 South College Avenue 720 3rd Ave SW Fort Collins, CO Carmel, IN 46032-2036 Project Number: 20181040 Services: Terracon Rep.: Taylor Keller Reported To: Rory with Connell Contractor: Connell Report Distribution: See attached distribution list. Reviewed By: ____________________________________ Craig L. Nelson Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 North South Report Date: Service Date: Report Number: Task: 20181040.0387 09/24/19 09/30/19 1901 Sharp Point Dr, Ste C Fort Collins, CO 80525-4429 Earthwork 970-484-0359 Distribution List Distribution Page (1) Signature Construction LLC, Matt Boyle (1) Connell Resources Inc, Jeff Laugel (1) Martin Marietta Materials Inc, Bill Meek (1) Martin Marietta Materials Inc, Matt Hysen (1) Signature Construction LLC, Taylor Elizalde (1) Signature Construction LLC, Trevor Rine (1) Terracon Consultants, Inc., Eric Bernhardt (1) Total Concrete Services Inc, Jeff Cast (1) Total Concrete Services Inc, John Montanez 482 See Diagram 0' 2 8 123.4 16.0 14.9 107.4 96 Comments: Datum: 0' =Subgrade Std. Cnt. M: 619 Std. Cnt. D: 1973 Test and/or retest results on this report meet project requirements as noted above. S/N: 60674 Make: Troxler Model: 3430 Last Cal. Date: 01/31/2019 Services: Reported To: Contractor: Rory with Connell Connell Craig L. Nelson Project Manager Report Distribution: See attached distribution list. Reviewed By: Terracon Rep.: Taylor Keller Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 1 of 1