HomeMy WebLinkAboutEAST RIDGE PHASE 3 - Filed SEPD-SURFACE EXPLORATION/PAVEMENT DESIGN REPORT - 2018-08-16Geotechnical Subsurface Exploration and Pavement Design Report East Ridge Phase 3 Pavements Fort Collins, Colorado Soilogic # 16-2046P 2 FIELD EXPLORATION To develop subsurface information for use in the pavement design, a total of seven (7) borings were completed. In the project roadways were water and sewer utilities were installed as part of the site development, one (1) boring was advanced over the utility trench area to a depth of approximately five (5) feet below roadway subgrade level and one (1) boring advanced outside the utility trench area to a depth of approximately 10 feet. One (1) boring extended to a depth of approximately 5 feet below alleyway subgrade elevation was completed along Alley A which does not contain water and sewer utilities. The test areas were established at approximate 500 foot intervals along the roadway alignments in accordance with the Larimer County Urban Area Street Standards (LCUASS). The boring locations were established in the field by Soilogic personnel by pacing and estimating angles and distances from identifiable site references. A diagram indicating the approximate boring locations is included with this report. The boring locations outlined on the attached diagram should be considered accurate only to the degree implied by the methods used to make the field measurements. Graphic logs of each of the auger borings are also included. The test holes were advanced using 4-inch diameter continuous-flight auger powered by a truck-mounted CME-45 drill rig. Samples of the subsurface materials were obtained at regular intervals using California barrel sampling procedures in general accordance with ASTM specification D-1586. As part of the D-1586 sampling procedure, standard sampling barrels are driven into the substrata using a 140-pound hammer falling a distance of 30 inches. The number of blows required to advance the sampler a distance of 12 inches is recorded and helpful in estimating the consistency or relative density of the soils encountered. In the California barrel sampling procedure, lesser disturbed samples are obtained in removable brass liners. Samples of the subsurface materials obtained in the field were sealed and returned to the laboratory for further evaluation, classification and testing. LABORATORY TESTING The samples collected were tested in the laboratory to measure natural moisture content and visually and/or manually classified in accordance with the Unified Soil Classification Geotechnical Subsurface Exploration and Pavement Design Report East Ridge Phase 3 Pavements Fort Collins, Colorado Soilogic # 16-2046P 3 System (USCS). The USCS group symbols are indicated on the attached boring logs. An outline of the USCS classification system is included with this report. As part of the laboratory testing, a calibrated hand penetrometer (CHP) was used to estimate the unconfined compressive strength of essentially-cohesive specimens. The CHP also provides a more reliable estimate of soil consistency than tactual observation alone. Dry density, Atterberg limits, -200 wash and swell/consolidation tests were completed on selected samples to help establish specific soil characteristics. Atterberg limits tests are used to determine soil plasticity. The percent passing the #200 size sieve (-200 wash test) is used to determine the percentage of fine-grained soils (clay and silt) in a sample. Swell/consolidation tests are performed to evaluate soil volume change potential with variation in moisture content. Swell/consolidation tests completed on samples obtained at a depth of approximately 2 feet below ground surface were inundated with water at a 150 psf confining pressure while samples obtained at a depth of approximately 4 feet below ground surface were inundated at a 500 psf confining pressure. One representative sample of the subgrade soils obtained during drilling of the Phase 1A pavements was submitted to a local laboratory for resistance value (R-value) testing for use in pavement design. The results of the completed laboratory tests are outlined on the attached boring logs, swell/consolidation and R-value test summary sheets. SUBSURFACE CONDITIONS The subsurface materials encountered in the completed site borings can be summarized as follows. Brown/olive/rust clayey sand with varying amounts of silt and gravel was encountered at the surface at the boring locations. A portion of the near-surface clayey sand appeared to be placed fill and/or utility backfill. The clayey sand varied from loose to medium dense in terms of relative density, exhibited no to low swell potential at in-situ moisture and density conditions and extended to the bottom of all borings at depths ranging from approximately 5 to 10 feet below present site grade. The stratigraphy indicated on the included boring logs represents the approximate location of changes in soil types. Actual changes may be more gradual than those indicated. Geotechnical Subsurface Exploration and Pavement Design Report East Ridge Phase 3 Pavements Fort Collins, Colorado Soilogic # 16-2046P 4 Groundwater was not encountered in any of the completed site borings at the time of drilling. Groundwater levels will vary seasonally and over time based on weather conditions, site development, irrigation practices and other hydrologic conditions. Perched and/or trapped groundwater conditions may also be encountered at times throughout the year. Perched water is commonly encountered in soils overlying less permeable soil layers and/or bedrock. Trapped water is typically encountered within more permeable zones of layered soil and bedrock systems. The location and amount of perched/trapped water can also vary over time. ANALYSIS AND RECOMMENDATIONS Roadway Subgrade Development The clayey sand subgrade soils encountered in the completed site borings exhibited no to low swell potential at in-situ moisture and density conditions, and in our opinion, could be used for direct support of the roadway pavements. Immediately prior to paving, we recommend the exposed subgrade soils be scarified to a depth of 9 inches, adjusted in moisture content and compacted to at least 95% of the materials standard Proctor maximum dry density. The moisture content of the scarified subgrade soils should be adjusted to be within the range of ±2% of standard Proctor optimum moisture content at the time of compaction. If fly ash stabilization of the pavement subgrade soils will be completed, reconditioning of the subgrade soils prior to fly ash treatment would not be required. Care should be taken to avoid disturbing the developed subgrade soils prior to paving. In addition, efforts to maintain the proper moisture content in the subgrade soils should be made. If subgrade soils are disturbed by the construction activities or allowed to dry out or become elevated in moisture content, those materials should be reworked in place or removed and replaced prior to surfacing. Proof-rolling of the roadway subgrade soils should be completed prior to paving to help identify any areas of soft/unstable soils. Those areas identified as unstable would need to be mended prior to paving. Isolated areas of instability can be mended on a case by case basis. If more extensive areas of subgrade instability are encountered and depending on Geotechnical Subsurface Exploration and Pavement Design Report East Ridge Phase 3 Pavements Fort Collins, Colorado Soilogic # 16-2046P 5 the time of year when construction occurs and other hydrologic conditions, stabilization of the subgrade soils may become necessary to develop a suitable paving platform. Based on the materials encountered in the completed site borings and results of laboratory testing, it is our opinion fly ash stabilization of the pavement subgrades could be completed to develop a suitable paving platform. Typically, with the increase in support strength developed by the stabilization procedures, the zone of stabilized subgrade can be included in the pavement section design, reducing the required thickness of overlying asphaltic concrete and/or aggregate base course. However, the pavement sections outlined below in Table 1 are minimums, such that a reduction in the overlying pavement thickness would not be allowed. Fly ash stabilization can eliminate some of the uncertainty associated with attempting to pave during periods of inclement weather. If fly ash stabilization will be completed, we recommend the addition of 12% class ‘C’ fly ash based on component dry unit weights. A 12-inch thick stabilized zone should be constructed by thoroughly blending the fly ash with the in-place subgrade soils. Some “fluffing” of the finish subgrade level should be expected with the stabilization procedures. The blended materials should be adjusted to within ±2% of standard Proctor optimum moisture content and compacted to at least 95% of the material’s standard Proctor maximum dry density within two (2) hours of fly ash addition. Pavement Design Site pavement could be supported directly on stable reconditioned subgrade soils or fly ash treated subgrade soils developed as outlined above. The pavement subgrade soils are expected to consist of reconditioned clayey sand. These soils classify as A-6 soils in accordance with The American Association of State Highway and Transportation Officials (AASHTO) classification system and would be expected to exhibit low to moderate remolded shear strength. An R-value of 17 was determined on a representative subgrade sample obtained from the Phase 1A on-site borings. Based on the similar soils encountered in the Phase 3 borings, an R-value of 17 was used in the pavement section design. Design ESAL’s were provided by City of Fort Collins personnel. Serviceability loss and reliability were obtained from the current LCUASS. Geotechnical Subsurface Exploration and Pavement Design Report East Ridge Phase 3 Pavements Fort Collins, Colorado Soilogic # 16-2046P 6 Outlined below in Table I. are proposed pavement section designs for the subject roadways. Alternative pavement sections could be considered and we would be happy to discuss any design alternatives at your request. TABLE 1 – PAVEMENT SECTION DESIGN Roadway Classification ESAL’s Reliability % Loss Resilient Modulus (Mr) Design Structural Number Option A – Composite Asphalt (Grading S or SX) Aggregate Base (Class 6) (Structural Number) Option B – Composite on Fly Ash Asphalt (Grading S or SX) Aggregate Base (Class 6) Fly Ash Treated Subgrade (Structural Number) Conquest Street and Marquise Street Local Residential 36,500 75% 2.5 4478 (2.16) *4” (0.44/inch) *6” (0.11/inch) (2.42) *4” (0.44/inch) *6” (0.11/inch) 12” (10 @ .05/inch) (2.70) * - Minimum section required by the City of Fort Collins Asphaltic concrete should consist of a bituminous plant mix composed of a mixture of aggregate, filler, binders and additives if required meeting the design requirements of the City of Fort Collins. Aggregate used in the asphaltic concrete should meet specific gradation requirements such as Colorado Department of Transportation (CDOT) grading S (3/4 inch minus) or SX (1/2 inch minus) specifications. Asphalt used in the hot mix should consist of performance graded PG (58-28) for local residential roadways. Hot mix asphalt designed using “Superpave” criteria should be compacted to within 92 to 96% of the materials Maximum Theoretical Density. Aggregate base should be consistent with CDOT requirements for Class 5 or 6 aggregate base, placed in loose lifts not to exceed 9 inches thick, adjusted to within ±2% of the material’s standard Proctor optimum moisture content and compacted to at least 95% of the materials standard Proctor maximum dry density. Geotechnical Subsurface Exploration and Pavement Design Report East Ridge Phase 3 Pavements Fort Collins, Colorado Soilogic # 16-2046P 7 The proposed pavement section designs do not include an allowance for excessive loading conditions imposed by heavy construction vehicles or equipment. Heavily loaded concrete or other building material trucks and construction equipment can cause some localized distress to the roadway pavements. Drainage Positive drainage is imperative for satisfactory long term performance of the roadway pavements. Water which is allowed to pond adjacent to site pavements can result in a loss of subgrade support and premature failure of the overlying pavement section. LIMITATIONS This report was prepared based upon the data obtained from the completed site exploration, laboratory testing, engineering analysis and any other information discussed. The completed borings provide an indication of subsurface conditions at the boring locations only. Variations in subsurface conditions can occur in relatively short distances away from the borings. This report does not reflect any variations which may occur across the site or away from the borings. If variations in the subsurface conditions anticipated become evident, the geotechnical engineer should be notified immediately so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any biological or environmental assessment of the site or identification or prevention of pollutants or hazardous materials or conditions. Other studies should be completed if concerns over the potential of such contamination or pollution exist. The geotechnical engineer should be retained to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. The geotechnical engineer should also be retained to provide testing and observation services during construction to help determine that the design requirements are fulfilled. Geotechnical Subsurface Exploration and Pavement Design Report East Ridge Phase 3 Pavements Fort Collins, Colorado Soilogic # 16-2046P 8 This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with the generally accepted standard of care for the profession. No warranties express or implied, are made. The conclusions and recommendations contained in this report should not be considered valid in the event that any changes in the nature, design or location of the project as outlined in this report are planned, unless those changes are reviewed and the conclusions of this report modified and verified in writing by the geotechnical engineer. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the enclosed information or if we can be of further assistance to you in any way, please do not hesitate to contact us. Very Truly Yours, Soilogic, Inc. Reviewed by: Wolf von Carlowitz, P.E. Darrel DiCarlo, P.E. Principal Engineer Senior Project Engineer 36746 44271 LOG OF BORING B-1A 1/1 CME 45 4" CFA Automatic ZG/BM Estimated Swell % Passing SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve (ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%) - 1 CL FILL - CLAYEY SAND - brown/olive/rust 2 loose - 3 CS 13 11.3 120.5 9000+ - - - - - - 4 - 5 CS 9 12.8 118.7 9000+ None <500 - - - BOTTOM OF BORING 5.0' - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 Surface Elev. - Field Personnel: 24 Hours After Drilling - USCS LOG OF BORING B-1B 1/1 CME 45 4" CFA Automatic ZG/BM Estimated Swell % Passing SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve (ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%) - 1 - SC-CL CLAYEY SAND 2 brown/olive - loose to medium dense 3 CS 16 6.9 102.7 9000+ 1.3% @ 0.15K 550 - - - - 4 - 5 CS 10 8.9 114.3 9000+ - - - - - - 6 - 7 - 8 - 9 - 10 CS 6 22.3 100.9 2000 - - - - - BOTTOM OF BORING 10.0' - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 Surface Elev. - Field Personnel: 24 Hours After Drilling - USCS LOG OF BORING B-2A 1/1 CME 45 4" CFA Automatic ZG/BM Estimated Swell % Passing SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve (ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%) - 1 CL FILL - CLAYEY SAND - brown/olive/rust 2 loose to medium dense - 3 CS 13 11.9 118.8 9000+ None @ 0.15K <150 - - - With Gravel - 4 - 5 CS 16 11.8 118.5 9000+ - - 25 11 44.7% BOTTOM OF BORING 5.0' - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 Sheet Drilling Rig: Water Depth Information EAST RIDGE PHASE 3 PAVEMENTS LOG OF BORING B-2B 1/1 CME 45 4" CFA Automatic ZG/BM Estimated Swell % Passing SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve (ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%) - 1 - SC CLAYEY SAND with GRAVEL 2 brown/olive - loose 3 CS 10 15.3 118.5 9000+ - - - - - - 4 - 5 CS 11 11.9 114.9 8000 None <500 - - - - 6 - 7 - 8 - 9 - 10 CS 9 20.9 102.1 4000 - - - - - BOTTOM OF BORING 10.0' - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 Sheet Drilling Rig: Water Depth Information EAST RIDGE PHASE 3 PAVEMENTS LOG OF BORING B-3A 1/1 CME 45 4" CFA Automatic ZG/BM Estimated Swell % Passing SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve (ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%) - 1 CL CLAYEY SAND - brown/olive 2 loose - 3 CS 14 8.1 118.1 9000+ 2.8% @ 0.15K 2000 - - - - 4 - 5 CS 11 10.3 119.0 9000+ - - - - - BOTTOM OF BORING 5.0' - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 24 Hours After Drilling - USCS LOG OF BORING B-4A 1/1 CME 45 4" CFA Automatic ZG/BM Estimated Swell % Passing SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve (ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%) - 1 CL FILL - CLAYEY SAND with GRAVEL - brown/olive/rust 2 loose - 3 CS 12 10.9 126.2 9000+ - - - - - - 4 - 5 CS 11 9.7 123.9 9000+ 0.1% 600 - - - BOTTOM OF BORING 5.0' - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 Surface Elev. - Field Personnel: 24 Hours After Drilling - USCS LOG OF BORING B-4B 1/1 CME 45 4" CFA Automatic ZG/BM Estimated Swell % Passing SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve (ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%) - 1 - SC-CL CLAYEY SAND 2 brown/rust - loose to medium dense 3 CS 7 10.8 117.5 9000+ 0.3% @ 0.15K 350 - - - - With Scattered Gravel 4 - 5 CS 11 12.7 119.8 9000+ - - - - - - 6 - 7 - 8 - 9 - 10 CS 15 15.7 112.5 6500 - - - - - BOTTOM OF BORING 10.0' - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 Surface Elev. - Field Personnel: 24 Hours After Drilling - USCS Liquid Limit - Plasticity Index - % Passing #200 - Dry Density (pcf) 118.7 EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 SWELL/CONSOLIDATION TEST SUMMARY Sample ID: B-1A @ 4 Sample Description: Fill - Brown/Olive/Rust Clayey Sand (SC) (Swell Only) Initial Moisture 12.8% Final Moisture 14.7% % Swell @ 500 psf None Swell Pressure (psf) <500 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 10 100 1000 10000 100000 --------- Applied Load (psf) Liquid Limit - Plasticity Index - % Passing #200 - Dry Density (pcf) 102.7 SWELL/CONSOLIDATION TEST SUMMARY EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Initial Moisture 6.9% Sample ID: B-1B @ 2 Sample Description: Brown/Olive Clayey Sand (SC) Final Moisture 20.2% % Swell @ 150 psf 1.3% Swell Pressure (psf) 550 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 10 100 1000 10000 100000 --------- Applied Load (psf) Liquid Limit - Plasticity Index - % Passing #200 - Dry Density (pcf) 118.8 SWELL/CONSOLIDATION TEST SUMMARY EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Initial Moisture 11.9% Sample ID: B-2A @ 2 Sample Description: Fill - Brown/Olive/Rust Clayey Sand with Gravel (SC) (Swell Only) Final Moisture 14.2% % Swell @ 150 psf None Swell Pressure (psf) <150 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 10 100 1000 10000 100000 --------- Applied Load (psf) Liquid Limit - Plasticity Index - % Passing #200 - Dry Density (pcf) 114.9 SWELL/CONSOLIDATION TEST SUMMARY EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Initial Moisture 11.9% Sample ID: B-2B @ 4 Sample Description: Brown/Olive Sand and Gravel (SP-GP) (Swell Only) Final Moisture 15.8% % Swell @ 500 psf None Swell Pressure (psf) <500 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 10 100 1000 10000 100000 --------- Applied Load (psf) Liquid Limit - Plasticity Index - % Passing #200 - Dry Density (pcf) 118.1 SWELL/CONSOLIDATION TEST SUMMARY EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Initial Moisture 8.1% Sample ID: B-3A @ 2 Sample Description: Brown/Olive Clayey Sand (SC) Final Moisture 15.6% % Swell @ 150 psf 2.8% Swell Pressure (psf) 2,000 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 10 100 1000 10000 100000 --------- Applied Load (psf) Liquid Limit - Plasticity Index - % Passing #200 - Dry Density (pcf) 123.9 SWELL/CONSOLIDATION TEST SUMMARY EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Initial Moisture 9.7% Sample ID: B-4A @ 4 Sample Description: Fill - Brown/Olive/Rust Clayey Sand with Gravel (SC) Final Moisture 13.6% % Swell @ 500 psf 0.1% Swell Pressure (psf) 600 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 10 100 1000 10000 100000 --------- Applied Load (psf) Liquid Limit - Plasticity Index - % Passing #200 - Dry Density (pcf) 117.5 SWELL/CONSOLIDATION TEST SUMMARY EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Initial Moisture 10.8% Sample ID: B-4B @ 2 Sample Description: Brown/Rust Clayey Sand (SC) Final Moisture 14.0% % Swell @ 150 psf 0.3% Swell Pressure (psf) 350 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 10 100 1000 10000 100000 --------- Applied Load (psf) TEST SPECIMEN 1 2 3 4 R-VALUE (300 psi) MOISTURE CONTENT (%) 26.7 19.6 16.0 DENSITY (pcf) 102.6 113.0 116.8 EXPANSION PRESSURE (psi) 0.000 0.000 0.000 EXUDATION PRESSURE (psi) 162 369 541 R-VALUE 6 21 39 17 SOIL TYPE: Sandy Clay LOCATION: East Ridge, On Site DATE SAMPLED: 10/10/2016 DATE RECEIVED: 10/10/2016 DATE TESTED: 10/17/2016 GRAVEL: SAND: SILT AND CLAY: LIQUID LIMIT: PLASTICITY INDEX: R-VALUE 16-1-148 KUMAR & ASSOCIATES These test results apply to the samples which were tested. The testing report shall not be reproduced, except in full, without the written approval of Kumar & Associates, Inc. R-value performed in accordance with ASTM D2844. Atterberg limits performed in accordance with ASTM D4318. Sieve analyses performed in accordave with ASTM D422, D1140 HVEEM STABILOMETER TEST RESULTS 6793 0 10 20 30 40 50 60 70 80 90 100 0 100 200 300 400 500 600 700 800 R-Value EXUDATION PRESSURE (psi) Design Inputs Asphalt Concrete CBR, Calculated Mr 3.0 Mr = 5161 psi K = 110 pci Sugrade Support Used Mr = 4478 psi K = 250 pci Reliability (%) = 75 75 Standard Deviation So = 0.45 0.35 Initial Serviceability = Po = 4.5 4.5 Terminal Serviceability = Pt = 2.0 2.5 Design Serviceability Loss, = DPSI = 2.5 2.0 Asphalt Layer Coefficients a1 = 0.44 AC Surface and Binder a2 = 0.30 AC Base a2 = 0.11 Aggregate Base a3 = 0.08 Subbase Concrete Compressive Strength 4000 psi Modulus of Elasticity of Concrete = 3,605 ksi Modulus of Rupture of Concrete: = 580 psi Load Transfer ("J" Factor) 3.8 See Table 1 Drainage Coefficient 1.0 See Table 2 Pavement Thickness Designs Traffic Category - Flexible Pavement Tucker Asphalt Section Traffic (18 kip ESAL) = 36,500 Calculated ESALs = 11,868 Flexible Pavement Section Drainage, m Di AC Surface + Binder 4.0 in Asphalt Base in Aggregate Base 1.0 6.0 in Subbase 1.0 0.0 in Structural Number 2.42 OK -3.01E-05 Required 2.16 Rigid Pavement Section Traffic Category - Rigid Pavement Typical Minor Road Concrete Section Traffic (18 kip ESAL) = 160,000 Calculated ESALs = 295,382 Concrete Thickness, DPCC 5.08 Equation results require 5.2041 Click button to solve for slab Thickness equality 5.3307 -3.7265 Pavement Design (AASHTO 1993 Method) Solve for DPCC UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification Group Symbol Group NameB Clean Gravels Cu ! 4 and 1 " Cc " 3E GW Well graded gravelF Less than 5% finesC Cu < 4 and/or 1 > Cc > 3E GP Poorly graded gravelF Fines classify as ML or MH GM Silty gravelF,G, H Coarse Grained Soils More than 50% retained on No. 200 sieve Gravels More than 50% of coarse fraction retained on No. 4 sieve Gravels with Fines More than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H Clean Sands Cu ! 6 and 1 " Cc " 3E SW Well graded sandI Less than 5% finesD Cu < 6 and/or 1 > Cc > 3E SP Poorly graded sandI Fines classify as ML or MH SM Silty sandG,H,I Sands 50% or more of coarse fraction passes No. 4 sieve Sands with Fines More than 12% finesD Fines classify as CL or CH SC Clayey sandG,H,I Silts and Clays PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M Liquid limit less than 50 Inorganic PI < 4 or plots below “A” lineJ ML SiltK,L,M Liquid limit - oven dried Organic clayK,L,M,N Fine-Grained Soils 50% or more passes the No. 200 sieve Organic Liquid limit - not dried < 0.75 OL Organic siltK,L,M,O Inorganic PI plots on or above “A” line CH Fat clayK,L,M Silts and Clays Liquid limit 50 or more PI plots below “A” line MH Elastic siltK,L,M Organic Liquid limit - oven dried Organic clayK,L,M,P Liquid limit - not dried < 0.75 OH Organic siltK,L,M,Q Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-in. (75-mm) sieve B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. C Gravels with 5 to 12% fines require dual symbols: GW-GM well graded gravel with silt, GW-GC well graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW-SM well graded sand with silt, SW-SC well graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay E Cu = D60/D10 Cc = GENERAL NOTES DRILLING & SAMPLING SYMBOLS: SS: Split Spoon - 1⅜" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger ST: Thin-Walled Tube – 2.5" O.D., unless otherwise noted PA: Power Auger RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger CS: California Barrel - 1.92" I.D., 2.5" O.D., unless otherwise noted RB: Rock Bit BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 2.5” O.D. California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12 inches using a 140-pound hammer falling 30 inches, reported as “blows per inch,” and is not considered equivalent to the “Standard Penetration” or “N-value”. WATER LEVEL MEASUREMENT SYMBOLS: WL: Water Level WS: While Sampling WCI: Wet Cave in WD: While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB: After Boring ACR: After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK (CB) Blows/Ft. (SS) Blows/Ft. Consistency (CB) Blows/Ft. (SS) Blows/Ft. Relative Density (CB) Blows/Ft. (SS) Blows/Ft. Consistency < 3 0-2 Very Soft 0-5 < 3 Very Loose < 24 < 20 Weathered 3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm 6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard 11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard 19-36 16-30 Very Stiff > 79 > 50 Very Dense > 96 > 79 Very Hard > 36 > 30 Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Descriptive Terms of Other Constituents Percent of Dry Weight Major Component of Sample Particle Size Trace < 15 Boulders Over 12 in. (300mm) With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm) Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm) Sand Silt or Clay #4 to #200 sieve (4.75mm to 0.075mm) Passing #200 Sieve (0.075mm) RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION Descriptive Terms of Other Constituents Percent of Dry Weight Term Plasticity Index Trace With Modifiers < 5 5 – 12 > 12 Non-plastic Low Medium High 0 1-10 11-30 30+ F If soil contains ! 15% sand, add “with sand” to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. HIf fines are organic, add “with organic fines” to group name. I If soil contains ! 15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains ! 30% plus No. 200 predominantly sand, add “sandy” to group name. M If soil contains ! 30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI ! 4 and plots on or above “A” line. O PI < 4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line. Sampler Atterberg Limits Start Date 7/31/2018 Auger Type: During Drilling None Finish Date 7/31/2018 Hammer Type: After Drilling None EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Sheet Drilling Rig: Water Depth Information Sampler Atterberg Limits Start Date 8/2/2018 Auger Type: During Drilling None Finish Date 8/2/2018 Hammer Type: After Drilling None EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Sheet Drilling Rig: Water Depth Information Sampler Atterberg Limits Surface Elev. - Field Personnel: Start Date 7/31/2018 Auger Type: During Drilling None Finish Date 7/31/2018 Hammer Type: After Drilling None Sheet Drilling Rig: Water Depth Information EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 FORT COLLINS, COLORADO Project # 16-2046P August 2018 Finish Date 8/2/2018 Hammer Type: After Drilling None Start Date 8/2/2018 Auger Type: During Drilling None 24 Hours After Drilling - USCS Sampler Atterberg Limits Surface Elev. - Field Personnel: FORT COLLINS, COLORADO Project # 16-2046P August 2018 Finish Date 7/31/2018 Hammer Type: After Drilling None Start Date 7/31/2018 Auger Type: During Drilling None 24 Hours After Drilling - USCS Sampler Atterberg Limits Surface Elev. - Field Personnel: Sampler Atterberg Limits Start Date 7/31/2018 Auger Type: During Drilling None Finish Date 7/31/2018 Hammer Type: After Drilling None EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Sheet Drilling Rig: Water Depth Information Sampler Atterberg Limits Start Date 8/2/2018 Auger Type: During Drilling None Finish Date 8/2/2018 Hammer Type: After Drilling None EAST RIDGE PHASE 3 PAVEMENTS FORT COLLINS, COLORADO Project # 16-2046P August 2018 Sheet Drilling Rig: Water Depth Information