January 18, 2016
Brent Cooper
Ripley Design, Inc.
419 Canyon Ave., Suite 200
Fort Collins, CO 80521
RE: Affinity at Fort Collins, FDP150044, Round Number
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clark Mapes, at 970-221-6225 or cmages0ftgov.com.
RESPONSES 1/27/16
Civil- JR Engineering
Planning- Ripley Design
Architecture- N+0 Architects
Lighting- MEP Engineering
Comment Summary:
Department: Planning Services
Contact: Clark Mapes, 970.221.6225, cmapes6fc90v.com
Topic: General
Comment Number: 1
Comment Originated: 01/13/2016
From GIS re Addressing:
1. Addresses will be assigned by the GIS Department after the plans have met
final approval through Development Review and are recorded with the City.
2. Projects with three or more tenant units require the Unit Level Addressing
form to be completed and submitted to the GIS Department once plans have
met final approval through Development Review and are recorded with the City.
This can occur anytime during construction, but before any utilities or address
signs are installed. All addressing will be determined by the GIS Department
and submitted to Poudre Fire Authority, USPS, Building Services, and Fort
R
10
01/14/2016: Please make changes to the Statement Of Ownership And
Subdivision as marked. See redlines.
Response: Addressed
Comment Number: 2 Comment Originated: 01/1412016
01/14/2016: The Certificate Of Dedication is incomplete. Please make sure all
plat language is the most current City language.
Response: Addressed
Comment Number: 3 Comment Originated: 01/14/2016
01/14/2016: Are the dimension arrows(marked) in the correct location? See
redlines.
Response: Arrow tags were placed where requested. Drainage easement width varies.
Comment Number: 4 Comment Originated: 01/14/2016
01/14/2016: The new Board Rule 6.5.4 requires Surveyors to "make note" of
the reason a monument was not accepted. See redljnes.
Response: In order to not complicate the corner with a "pin cushion" affect of multiple pins the monument
as recovered has been accepted as reference. Positional error provided as reference to the comer will
allow for mathematic closure of the recovered monuments and the plat.
Topic: Site Plan
Comment Number: 5
01/14/2016: No comments.
Response: Noted.
Comment Originated: 01/14/2016
Department: Traffic Operation
Contact: Martina Wilkinson, 970.221.6887, mwilkinsonffcoov.com
Topic: General
Comment Number: 1 Comment Originated: 01/13/2016
01/13/2016: no comments
Response: Noted.
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970.416.2418, w1amaraue0fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/12/2016
01/12/2016: Please provide 10 feet of separation between the storm sewer
and the water main at the southeast corner of the site.
Response: Addressed
Comment Number: 2 Comment Originated: 01/12/2016
01/12/2016: All fire hydrant assemblies require a swivel tee and gate valve.
Please see redlines.
Response: Addressed
Comment Number: 3 Comment Originated: 01/12/2016
01/12/2016: Please provide flow demand calculations to verify the water tap
size. The plans show a 1 1/2 tap which would be too small for a building with
this many units.
is
11
Response: Tap upsized to 4"
Comment Number: 4 Comment Originated:
01/12/2016
01/12/2016: Please adjust the water main connection of the 8-inch into the
12-inch at the northeast corner of the site. Please see redlines.
Response: Addressed
Comment Number: 5 Comment Originated:
01/12/2016
01/12/2016: Please provide a casing pipe for all waterline crossings under
another pipe of 24-inches or larger. Please see redlines.
Response: Addressed
Comment Number: 6 Comment Originated:
01/12/2016
01/12/2016: On sheet 23, waterline profile 01 can be adjusted to remove the
vertical high point. Please revise and reference redlines.
Response: Water system updated for new layout
Comment Number: 7 Comment Originated:
01/12/2016
01/12/2016: On sheet 23, waterline profile 02 can be adjusted to remove the
vertical bend at sta.12+61.47. Please raise the storm sewer enough to
achieve the required clearance and avoid the lowering.
Response: Water system updated for new layout
Comment Number: 8 Comment Originated:
01/12/2016
01/12/2016: On sheet 24, waterline 02 profile (3) can be adjusted to remove
the vertical bend at sta. 27+01,11. Please raise the storm sewer enough to
achieve the required clearance and avoid the lowering.
Response: Water system updated for new layout
Comment Number: 9 Comment Originated:
01/12/2016
01/12/2016: Please revise all water and sewer details to the City of Fort Collins
details. The District's details were used.
Response: Addressed
Comment Number: 10 Comment Originated:
01/12/2016
01/12/2016: Please add an encasement detail for the waterlines that require an
encasement pipe.
Response:Added
Comment Number: 11 Comment Originated: 01/12/2016
01/12/2016: Please provide 10 feet separation between any trees and fire
hydrants.
Response: Separation now provided.
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbealsb-fcoov.com
Topic: General
Comment Number: 1 Comment Originated: 01/13/2016
01/13/2016: The Planning Signature block needs to be changed tot he The
Director of Community Development and Neighborhood Services
Response: Changed.
Comment Number: 2 Comment Originated: 01/13/2016
01/13/2016: Add some street trees along both the east and west sides of the
corbett drive.
M.
12
Response: Trees have been added.
Comment Originated: 01113/2016
Comment Number: 3
01/13/2016: Where is the trash and recycling enclosures?
Response: Trash and recycling enclosures are located within the building in two locations, west and east.
There are two outdoor trash staging pads where bins are moved to on the day of pickup. A note has been
added (note 13, sheet 1) stating that trash bins shall be placed in the staging pads for a maximum of 24 hours
at a time.
Comment Number: 4
Comment Originated: 01/13/2016
01/13/2016: Please label which garage option is to be built at each garage
location.
Response: Garage options are now labeled on the site plan.
Comment Originated: 01113/2016
Comment Number: 5
01/13/2016: Please note Flagpoles can only display the Federal, State or local
government flags and not be used for signage.
Response: One flag pole (American flag) is now shown.
Comment Number: 6 Comment Originated: 01/13/2016
01/13/2016: Where is the mechanical equipment? Please identify equipment
and locations on the plans.
Response: Identified and shown.
M
2
Collins Utilities. Failure to contact GIS and determining addresses through
other means may result in address changes.
The Unit Level Addressing form can be obtained by contacting the GIS office at
gis@fcgov.com or (970) 416-2483.
Response: Noted
Comment Number: 2
01/13/2016: Elevations: Cultured stone, or stone? If cultured stone, what is the
pattern? Also, what is the trim at the top of the stone.
Response: Cultured stone — flat bed pattern. Trim to be 5/4" x 3'/2" painted smart trim.
Comment Number: 3 Comment Originated: 01/13/2016
01/13/2016: Elevations -related detailing: previous discussions included
fascia width, and frieze board trim underneath eaves at gables - i.e. just a bit
more substantial detail.
Response: Fascia has been enlarged per previous review to 8".
Comment Number: 4 Comment Originated: 01/13/2016
01/13/2016: Affordable housing component needs to be documented. I know
this is in process -what's the status?
Response: The developer is currently waiting on the City for the legal document.
Comment Number: 5 Comment Originated: 01/18/2016
01/18/2016: From the review meeting: incorporate meters into the architecture.
Response: Electrical equipment has been incorporated into the "Left" and "Right" elevations.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mraoasadMcoov.com
Topic: General
Comment Originated: U1MIZU11i
Comment Number: 1 Comment Originated: 01/13/2016
01/13/2016: City of Fort Collins signature block should say "Utility Plan
Approva", not Project Development Plan Approval
Response: Addressed
Comment Number: 2 Comment Originated: 01/13/2016
01/13/2016: Please update the City of Fort Collins General Note 19 and Strom
Drainage Note 2 to include the correct Drainage and Erosion Control Study title
Response: Addressed
Comment Number:
Comment Originated: 01/13/2016
01/13/2016: Are notes on Sheet 3 Contractor notes? Seems like a lot of the
notes repeat what are on Sheet 2. Please verify that notes don't conflict with City
notes on Sheet 2.
Response: Addressed
Comment Number: 4 Comment Originated:
01/13/2016: A legend is required on each sheet identifying the symbols used
on each particular sheet. When looking at the Utility Plans, it is helpful to have a
legend on the individual sheet. Notes that reference the Legend reference
Sheet 3 for the legend, but the legend sheet is on Sheet 4.
Response: Addressed
Comment Originated: 01/13/2016
Comment Number: 5
01/13/2016
M
01/13/2016: An offsite access easement is needed for the pedestrian
connection east of the property to the English Ranch subdivision. Currently
offsite easements call for Drainage and Temporary Construction easement. Will
the new multi -use path be open prior to the removal of the temporary asphalt
path? How will this be coordinated with the construction of the detention ponds
on the Sollenberger property? An easement is also needed for the HOA
property in English Ranch off of Kingsley Court for this sidewalk connection.
Response: easements established per separate document
Comment Number:
Comment Originated% 01/13/2016
01/13/2016: Sheet 6 calls out for a drain pan detail on that sheet. There is no
detail to reference.
Response: Addressed
Comment Number: 7
Comment Originated: 01/13/2016
01/13/2016: Please label the 10' sidewalk connection to the east as a Multi -use
path on the Utility Plans.
Response: Addressed
Comment Number: 8 Comment Originated: 01/13/2016
01/13/2016: The 5' ADA accessible route to the north to English Ranch needs
to also be within the access easement.
Response: Addressed
Comment Number: 9
Comment Originated: 01/13/2016
01/13/2016: Please provide more details on what is happening with with the
connection to Kingsley Ct. How will the ramp look? Provide dimensions? Show
Kingsley Court on all sheets on the Utility Plan. Do we have any gate details?
Will the gate swing into the public ROW? Will a portion of sidewalk be
replaced? If so, LCUASS sidewalk detail will be needed.
Response: See updated utility plans for grading detail at both points of access.
Comment Number: 10 Comment Originated: 01/13/2016
01/13/2016: Will the swale to the north be a bio-swale or just a grass swale?
There are a couple locations within the Plans that call out for both. Please
clarify.
Response: bio-swale, see updated set
Comment Number: 11
Comment Originated: 01/13/2016
01/13/2016: The Grading Plan (Sheet 8) shows lows spots, but is unclear how
they are draining. Please show inlet locations as shown on the Utility Plan sheet.
Response: Inlet locations have been called out with Grate elevations rather than LP for clarification
Comment Number: 12 Comment Originated: 01/13/2016
01/13/2016: Will the ramps on the 10' multi -use path affect the proposed weir
and drainage patterns?
Response: No, there is a curb at the back of the ramp which maintains grade along multi -use path.
Comment Number: 13 Comment Originated: 01/1312016
01/13/2016: The north arrow on Sheet 10 is incorrect. Please adjust
Response: Addressed
Comment Number: 14
Comment Originated: 01/13/2016
01/13/2016: Provide minimum dimensions for the tree lawn typical street cross
section of corbett drive. The ROW in A -A cross section is 68'.
4
Response: Addressed
Comment Number: 15
Comment Originated: 01/13/2016
01/13/2016: Sheet 17 calls out a concrete pan detail on Sheet 18, however,
this detail is not there.
Response: Addressed
Comment Number: 16 Comment Originated:
0111312016
01/13/2016: The detail for the ADA ramp to the northeast next to Kingsley
Court refers to LCUASS driveway approach. Please adjust the callout. See
redlines.
Response: Addressed
Comment Number: 17 Comment Originated:
01/13/2016
01/13/2016: Detail D on Sheet 18 is unclear where the ramp is being used. I
can't find the callout to this detail.
Response: 3 separate ada ramps located on the est side of the site are using detail D.
Comment Number: 18 Comment Originated:
01/13/2016
01/13/2016: The Overall Utility Plan sheet (Sheet 19) needs to label the width of
the Access, Drainage, Emergency Access, Pedestrian & Utility Easement.
Response: Addressed
Comment Number: 19 Comment Originated:
01/13/2016
01/13/2016: Please provide a key map for the Offsite Storm Sewer Plan &
Profile sheets. Key maps are required for plans with 3 or more sheets.
Response: Addressed
Comment Number: 20 Comment Originated:
01/13/2016
01/13/2016: Label details that are on site as "On -Site Only". See redlines.
Response: All details provided are for onsite use
Comment Number: 21 Comment Originated: 01/13/2016
01/13/2016: Is there a reason the South Fort Collins Sanitation District Details
are being used? Sanitary is provided by the City of Fort Collins.
Response: Details replaced
Comment Number: 22
Comment Originated: 01/13/2016
01/13/2016: The City of Fort Collins uses a modified version of Detail D-10
shown on Sheet 35. The modified version has flares behind the walk as shown
on Detail D-10B. See redlines.
Response: Detail 10B is for use with detached walks. We are using the city of Fort Collins detail for attached
walks, Detail D-10.
Comment Number: 23 Comment Originated: 01/13/2016
01/13/2016: It is understood that there is a future connection along the south of
the property to the west. Please be aware that this could see some heavy traffic.
24' should be adequate, but you may want to look at how this affects the parking
spaces to the south.
Response: Noted.
Comment Number: 24 Comment Originated: 01/13/2016
01/13/2016: Please label all surrounding properties by their legal description.
Current owners can be listed in parenthesis.
Response: Addressed
Comment Number: 25
Comment Originated: 01/13/2016
M
01/13/2016: A development agreement will be required prior to the approval of
this project. Some language that will be included involves offsite work,
maintenance of driveways/mutli-use path and any LID requirements.
Response: Noted
Topic: Plat
Comment Number: 26 Comment Originated: 01/13/2016
01/13/2016: Is Uswest okay with a drainage easement going over their telcom
easement? Please verify that it is okay.
FCP response to US West easement:
The Easement granted to US West Communications in 1992 (#92042010) is a non-exclusive easement for
underground telecommunications facilities. The Easement specifically provides: "The Grantor reserves the
right to occupy, use and cultivate said easement for all purposes not inconsistent with the rights herein
granted." The drainage easement is a surface use of the property that will not interfere with US West's
underground telecommunications facilities.
Comment Number: 27 Comment Originated: 01/14/2016
01/13/2016: Access easements typically cover Pedestrian Easements as well.
You can remove that reference if desired.
Response: Addressed
Comment Number: 28 Comment Originated: 01/14/2016
01/13/2016: Please show the weir in a draingae easement. Consider moving
the blanket easement boundary 5' east to the property line.
Response: Addressed
Department: Environmental Planning
Contact: Rebecca Everette, 970.416.2625, reveretteM- cgov.com
Topic: Landscape Plans
Comment Number: 3
Comment Originated: 01/12/2016
01/12/2016: Please provide the Latin names for the species in the native seed
mix so I can confirm that they are on the City's native plant list.
Response: Latin names have been provided on the native seed chart.
Comment Number: 4 Comment Originated: 01/12/2016
01/12/2016: The updated grading plan for the detention areas and the mix of
tree and shrub plantings will provide nice habitat for birds on the site. To provide
additional habitat for butterflies and other pollinators, more flowering perennials
should be included in the planting plan. For example, in place of the native grass
mix in the eastern detention pond, a mix that includes flowering perennials
should be considered instead.
I will provide an example seed mix created by our Natural Areas department at
the staff review meeting.
Response: A flowering native seed mix is now shown in the eastern detention pond. The seed mix that was
provided by Rebecca Everette is now included on sheet 10.
Topic: Lighting Plan
Comment Number: 1
Comment Originated: 01/12/2016
C.
A
01/12/2016: It's not clear if the North Coast (S4) and Lightolier (S5) light fixtures
are full cutoff - please confirm. If either of these fixtures will be recessed under
roofs/overhangs, please note this on the lighting plan.
Response: Fixture Type "S4" is not full cut-off, Fixture Type "SY is mounted under carport canopy and
Mounting is now called out with a drawing note number 1. Both fixtures will be changed to full cut-off fixtures.
Comment Number: 2 Comment Originated: 01/12/2016
01/12/2016: All of the light fixtures are proposed at a 3500K color temperature.
Lower (3000K or less) color temperatures are recommended by the
International Dark Sky Association to reduce impacts to human health and
wildlife. Please consider a warmer color temperature for these fixtures.
Response: Fixtures will be changed to 3000K color temperature lamps.
Department: Light And Power
Contact: Rob Irish, 970.224.6167, ridsh@fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 01/12/2016
01/12/2016: Electric Capacity Fee and Building Site charges will apply to this
development. Please click on the following link for Estimated Light & Power
charges and the Light & Power Fee calculator.
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Response: Noted
Comment Number: 2 Comment Originated: 01/12/2016
01/12/2016: Any existing electric infrastructure that is located within the limits
of the project that needs to be relocated will be at the expense of the developer.
If the City's existing electric facilities are to remain then they must be located
within a utility easement.
Response: Noted
Comment Number: 3 Comment Originated: 01/12/2016
01/12/2016: Transformer and meter locations will need to be coordinated with
Light & Power Engineering. Transformer location needs to be within 10' of an
asphalt surface accessible by aline truck. A minimum clearance of 8' must be
maintained in front of the transformer doors and a minimum of 3' on the sides
and back. Certain building materials and or building design may require more
clearance. Please click on the following link for Electric Construction, Policies,
Practices and Procedures.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Response: Locations have been revised and will be coordinated with Light & Power Engineering
and criteria will be met.
Comment Number: 4 Comment Originated: 01/12/2016
01/12/2016: The proposed transformer location shown on the Utility plan is out
of access for Light & Power. Please refer to the previous comment with regard
to transformer placement. Also, this transformer location is not in a Utility
easement.
Response: Locations have been revised and will be coordinated with Light & Power Engineering
and criteria will be met.
T
Comment Number: 5 Comment Originated: 01/12/2016
01/12/2016: Only one transformer is shown on the Utility plan. There were
earlier discussions of multiple transformers feeding this site. Will there only be
one transformer for this site? Please coordinate with Light & Power
Engineering asap to make sure Utility easements are in place.
Response: There are actually three transformers on the site, drawings are updated.
Comment Number: 6 Comment Originated: 01/12/2016
01/12/2016: A C-1 Form and a One -line diagram will need to be submitted to
Light & Power Engineering for review. Please click on the following link for the
C-1 Form.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Response: C-1 Form and One -line diagram will be submitted.
Comment Number: 7 Comment Originated: 01/12/2016
01/12/2016: Please contact Light & Power Engineering at 970-221-6700 with
any questions or concerns.
Response: Rob Irish at Light & Power Engineering has been contacted (1-19-2016)
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, jschlarriMcgov.com
Topic: Erosion Control
Comment Number:
Comment Originated: 12/28/2015
12/28/2015: Erosion Control Plan, no plan was submitted for review so review
of digital material was done in lieu, BMPs on Utilities Plan set seems
accepteable minus there was no detail was found for Check Dams materials
(Please submit a detail for check dams ensuring that they are not straw bale
check dams as those are not acceptable in the City of Fort Collins as a BMPs).
Erosion Control Report was acceptable except page 33 (Erosion Control
Escrow Calc). Erosion Control Calculation was incorrectly calculated. Please
ensure you are calculating the Escrow Calc correctly visit
www.fcgov.com/erosion to see example escrow calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ 1schlam(ftgov.com
Response: Addressed
Contact: Wes Lamarque, 970.416.2418, wiamargueMcoov.com
Topic: General
Comment Number: 2
Comment Originated: 01/12/2016
01/12/2016: Please update the utiltiy plans and the drainage report with the
new outfall configuration.
Response: Addressed
Comment Number: 3 Comment Originated: 01/1212016
01/12/2016: Please provide clarification on the purpose of the SWMM model in
the drainage report. It appears that the City does not need the model to
document any of the Stormwater requirements.
Also, CUHP is not software that the City supports in using SWMM.
0
8
Response: SWMM was used for detention pond sizing and offsite flow routing from Mobile Home Park.
SWMM was calibrated with subbasin flows calculated using the rational method. See drainage report for
additional clarification.
Comment Number: 4
Comment Originated: 01/12/2016
01/12/2016: Please document the LID design in the drainage report and
provide the LID table on the drainage plan. The discussion in the report is also
very minimal and should explain the design features and illustrate that the site is
meeting the 25% pervious pavement requirement as well as 50% of the site
draining through an appropriately sized LID technique.
Response: Addressed
Comment Number: 5
Comment Originated: 01/12/2016
01/12/2016: Calculations are still required to verify that the piping network is
adequate with having to ponds act in series. Modifications may be required to
the storm sewer into Pond B in order ensure that Pond B will fill to the 100-year
WSEL before Pond A spills.
Response: Storm Cad was used to calculate head loss during backflow condition. The headloss was
calculated to be 0.31 ft. The pond A spillway is 0.40 ft above the 100yr water surface elevation which means
the pond A will not overtop the spillway during the 100 yr event.
Comment Number: 6 Comment Originated: 01/12/2016
01/12/2016: Please add a Pond Summary Table to the drainage plan.
Response: Addressed
Comment Number: 7 Comment Originated:
01/12/2016
01/12/2016: Please provide a buried riprap detail with temporary erosion
protection.
Response: Addressed
Comment Number: 8 Comment Originated:
01/12/2016
01/12/2016: 1 any off -site work being performed on the detention pond to the
south for the spillway? If so, permission is required from the property owner.
Response: No
Comment Number: 9 Comment Originated:
01/12/2016
01/12/2016: Please show the HGL on the storm sewer profiles.
Response: Addressed
Comment Number: 10 Comment Originated:
01/12/2016
01/12/2016: Please label each storm sewer public or private. This site may
have all private storm sewer and can be identified as such with a note on the
storm sewer profile sheets.
Response: Addressed
Comment Number: 11 Comment Originated:
01/12/2016
01/12/2016: Please use the City's standard WQ outlet structure detail. The City
does not use the micropool detail as per Urban Drainage.
Response: Addressed
Comment Number: 12 Comment Originated:
01/12/2016
01/12/2016: Please add the porous pavement detail to the plan set.
Response: Addressed
Comment Number: 13 Comment Originated:
01/12/2016
01/12/2016: Please add the bio-retention media specs to the detail sheet.
M
E
Response: Addressed
Comment Number: 14 Comment Originated: 01/12/2016
01/12/2016: Please provide calculations in the drainage report documenting
the on -site and off -site flows have conveyance per City requirements in the
overflow condition due to inlets being clogged and off -site spill fully in place.
Also, please discuss the overflow condition in the text of the report in the
sub -basin descriptions.
Response: Addressed, cross sections added to show street capacity during 100 yr event with clogged inlets.
See emergency overflow conditions for subbasins in drainage report.
Comment Number: 15 Comment Originated: 01/12/2016
01/12/2016: Please edit the drainage report with the new outfall configuration.
Response: Addressed
Comment Number: 16 Comment Originated: 01/12/2016
01/12/2016: Please provide 10 feet of separation between all trees and storm
sewers.
Response: In general a 10' separation was provided. There area few constrained areas where the tree is
approximately 8' from a storm line. It was confirmed that this was acceptable by Wes Lamarque via email on
1 /22.
Department: Technical Services
Contact: Jeff County, 970.221.6588, jcounty .fcoov.com
Topic: Building Elevations
Comment Number: 8 Comment Originated: 01/14/2016
01/14/2016: Please change the "PDP Submittal" to "FCP Submittal" to match
the other plans.
Response: Noted
Topic: Construction Drawings
Comment Number: 9 Comment Originated: 01/14/2016
01/14/2016: No plans were provided for review. We will need to review before
plans are filed.
Response: Noted
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 01/14/2016
01/14/2016: There are line over text issues. See redlines.
Response: Revised on plans.
Topic: Lighting Plan
Comment Number: 7 Comment Originated: 01/14/2016
01/14/2016: Please change the "PDP Submittal" to "FCP Submittal" to match
the other plans.
Response: Plan has been updated
Topic: Plat
Comment Number: 1 Comment Originated: 01/14/2016
d