HomeMy WebLinkAboutSOUTHEAST COMMUNITY PARK - Filed CS-COMMENT SHEETS - 2016-09-13land planning ■ landscape architecture ■
February 9, 2015
Clark Mapes
City of Fort Collins
281 N. College
Fort Collins, CO
urban design ■ entitlement
RE Southeast Fort Collins Community Park PDP140014 Round Number 3
If have any questions regarding the responses in red contact Robin Rooney with Civitas Inc.
For responses in blue please contact Mike Oberiander at Interwest Engineering
For responses in purple please contact Gopal Shrestha at RB+B Architects
Comment Summary:
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes@fcg2v.c0m
Topic: General
Comment Number: 3 Comment Originated: 05126I2015
05/26/2015: Plan components labels: Its difficult/impossible to tell what some
of the plan components are - we can clarify at the meeting. Some aren't crucial
to LUC review or the hearing, but a few more labels might be worthwhile to
make final plans a bit more understandable for long term use.
Response: Completed at 9.2.15 submittal
Topic: Site Plan
Comment Number:
Comment Originated: 09/10/2014
09/10/2014: From FC-Loveland Water District and SFC Sanitation District: The
District does not allow trees, extensive landscaping, structures, etc. within 10
feet of District facilities or within District easements. The District will require a
permanent and temporary construction easement for the installation of a 24-inch
waterline. The property will need to petition into the sanitation District with a
$50 per acre fee. There is a reimbursement for connection to the water
infrastructure of approximately $62,566.76 as of September 3, 2014. There is
an interest rate factor that will increase over time. The District will require
another review of plans to resolve these comments.
Response: Tree locations have been revised.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 10 Comment Originated: 09I0912014
09/15/2015: All lanes shall be in alignment through each intersection. Please
show that the driveway lines up with Sage Creek Road accordingly.
Response: See sheet PP-1.
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 10 of 13
Response: This is a grass area that will not generate significant runoff during a 2-yr storm event (what the pavers are designed to
treat). It is our understanding that the 3:1 run on ratio applies only to impervious area, not pervious area.
Comment Number: 33 Comment Originated: 09/22/2015
09/22/2015: Sheet GR-1 - Per a previous redline, provide BMP's to protect the
creek bed. This can be addressed at final.
Response: The channel plans address the BMPs to protect the creek bed (drop structures, rock check dams, etc.)
Comment Number: 34
Comment Originated: 09/22/2015
09/22/2015: Sheet GR-2 - A portion of the Community Garden area is located
within the floodway. It is our understanding that these areas are "at -grade only"
and do not propose structures or raised planters of any sort. A note on the plans
should be added to indicate that these garden areas will be at -grade planting
beds only and that raised planter beds will not be constructed within the
floodway. This comment needs to be addressed before hearing.
Response: A note has been added to the plans.
Comment Number: 35
Comment Originated: 09/22/2015
09/2212015: Sheet GR-3 through GR-7 - See redlines for minor comments.
These can be addressed at final.
Response: The majority of these redlines were focused on the channel design which is part of a separate plan set.
Topic: Landscape Plans
Comment Number: 38
Comment Originated: 09/22/2015
09/22/2015: Landscape Plans - Under Floodplain and Floodway Notes, please
indicate the name of the floodway in the first note. This can be addressed at
final.
Response: This has been revised.
Topic: Plat
Comment Number: 36
Comment Originated: 09/22/2015
09/22/2015: Sheet FP-1 - The existing floodplain, proposed floodplain and
natural resources buffer are hard to distinguish from one another. Please revise
some of the linetypes or thicknesses or change some to grey scale. This can be
addressed at final. This can be addressed at final.
Response: The linetypes have been adjusted.
Topic: Site Plan
Comment Number: 37
Comment Originated: 09/22/2015
09/22/2015: Site Plan
- A portion of the Community Garden area is located within the floodway. It is
our understanding that these areas are "at -grade only" and do not propose
structures or raised planters of any sort. A note on the plans should be added to
indicate that these garden areas will be at -grade planting beds only and that
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 11 of 13
raised planter beds will not be constructed within the floodway. This comment
needs to be addressed before hearing.
- Please provide a legend on the site plan that shows floodway lines, buffer
lines, different hatch patterns etc.
These can be addressed at final
Response: A note has been added as described above. There are not raised planters anywhere in the community garden.
Contact: Jesse Schlam, 970.218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 28 Comment Originated:
09/09/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; Erosion Control Plan
(New redlines please research slope protection and biotic slope protection to
find better BMPs for the stream since SF will not work for that type of project),
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ ischlam _fcgov.com
Response: An erosion control report has been prepared. New slope protection for the creek is proposed.
05/19/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted does not meet requirements. Please submit; Erosion Control Plan
with corrected redlines, Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email @
9schlam(cDfcgov.com
Response: Addressed at 9.2.15 submittal.
05/19/2015
Contact: Shane Boyle, 970.221-6339, sboylec&fcgov.com
Topic: General
Comment Number: 29 Comment Originated: 05/26/2015
05/26/2015: Please see redlines for additional minor comments.
Response: Addressed at 9.2.15 submittal.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 09/08/2014
09/22/2015: There is still a problem with one of the elevations. See redlines.
Response:
05/26/2015: There is a problem with one of the elevations. See redlines.
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 12 of 13
Response: Addressed at 9.2.15 submittal.
09/08/2014: The City has moved to the NAVD88 vertical datum. Please
provide elevations for both the NAVD88 & NGVD29 (Unadjusted) datums, state
the project datum, and provide an equation to get from NAVD88 to NGVD29
Unadjusted, i.e. NAVD88 = NGVD29 Unadjusted +
Response: Addressed at 9.2.15 submittal.
Response: Corrected
Response: Corrected
Response: Corrected
Response: Corrected
Comment Number: 15
09/22/2015: This has not been corrected.
Comment Originated: 05/26/2015
05/26/2015: Please correct the matchline sheet numbers. See redlines.
Comment Number: 16 Comment Originated: 05/26/2015
09/22/2015: There are still cut off text issues. See redlines.
Comment Number: 22 Comment Originated: 09/22/2015
09/22/2015: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 23 Comment Originated: 09/22/2015
09/22/2015: There are text over text issues. See redlines.
Topic: Landscape Plans
Comment Number: 18 Comment Originated: 05/27/2015
09/16/2015: There is still text that needs to be masked. Mask all text in hatched
areas. See redlines.
Response: Corrected
Topic: Lighting Plan
Comment Number: 19 Comment Originated: 05/27/2015
09/22/2015: No plans were provided for review, so we cannot verify this was
addressed.
Response: Plans are included.
Topic: Site Plan
Comment Number: 21 Comment Originated: 09/09/2015
09/09/2015: There are line over text issues. See redlines.
Response: These have been addressed.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinsonVcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/22/2015
09/22/2015: Please remove the shown pedestrian crossing of Lady Moon at
Saber Car. The ramps can go in, but we would not stripe the crossing at this
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 13 of 13
time.
Response: This crossing has been removed.
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
Topic: lighting Plan
Comment Number: 1
Comment Originated: 09/15/2015
09/15/2015: It would be really helpful if the luminaire schedule included an
image of the actual fixture. Are all of these fully shielded and down directional?
Response: Cut sheets can be provided in future submittals.
land planning ■ landscape architecture ■ urban design ■ entitlement
March 23, 2016
Clark Mapes
City of Fort Collins
281 N. College
Fort Collins, CO
RE: Southeast Fort Collins Community Park, FDP160009, Round Number 1 Responses
If have any questions regarding the responses in red contact Robin Rooney with Civitas Inc.
For responses in blue please contact Mike Oberlander at Interwest Engineering
Comment Summary:
Department: Planning Services
Contact: Clark Mapes, 970.221.6225, cma es fc ov.com
Topic: General
My understanding from the meeting is that another submittal is needed for Engineering, Stormwater, Technical
Services and Environmental Planning. To save paper, I don't think landscape plans are needed for that. Let's
coordinate a routing.
I am assuming FC-Loveland Water District and SFC Sanitation District are resolved: The District does not allow trees,
extensive landscaping, structures, etc. within 10 feet of District facilities or within District easements. The District will
require a permanent and temporary construction easement for the installation of a 24-inch waterline. The property will
need to petition into the sanitation District with a $50 per acre fee. There is a reimbursement for connection to the
water infrastructure of approximately $62,566.76 as of September 3, 2014. There is an interest rate factor that will
increase over time. The District will require another review of plans to resolve these comments.
Comment Number: 1
Comment Originated: 03/13/2016
03/13/2016: Street Trees: Standards call for street trees in groups of 3, 5, or
more of each species. The idea is to be more definite and legible in defining
the street as a space, and get more effect out of each species.
For the benefit of people walking on the sidewalks, any chance to stagger
groupings on the outside of the sidewalk to create stretches of allee, should be
taken advantage of. The point is to more strongly establish the street and
sidewalk as positive public spaces. There is no stronger spatial effect in
landscaping than an allee.
Is there a reason for the more random groupings -if so let's discuss.
Response: This was a design strategy that was approved in schematic design with the City team as well as forestry. The idea
behind this is to embrace the farm vernacular, and enhance the native appeal where one would not find trees planted in allees to
the extents of the farm property. Intentional planting, such as tree allees, would generally occur adjacent with the physical
development of the farm property. This is the design intention. Also, many of the proposed street trees fall in native seed areas.
Comment Number: 2 Comment Originated: 03/13/2016
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 2 of 16
03/13/2016: Street Trees: It looks like there should be shade trees along the
parking on Saber Cat Drive, for comfort and attractiveness of the parking. Also
along Lady Moon to visually absorb and shade the parking.
n_ _ ._a_ t,. .- .. a,... ..+ a..,. ,. Cur !ayout, h.+.. h.. ,.n .. .n .. rJ h.. the n:+.. r7n.+i-n tccm nn.d the niF.r
.. .n. i. .. nn ...
(\GJfJV{IJG. VVC IIQVG Ii1Gt LIIG ICI�UU GIIIGIIW �VI JU Gt:a ll V�.rJ. V�.11 guy..... ��u� ...,... urr. v.......y ......� ......•�•. •--.••• ,-••,..• •••-• .-••,
forester.
Comment Number: 3
Comment Originated: 03/13/2016
03/13/2016: Street Trees: At the orchard on the south, if some of the flowering
trees crossed over into the parkway to create a flowering allee in spring. In that
case, the species should match the orchard rows, and so will vary along the
street.
Response: There is the true fruiting orchard area which runs north/ south and crosses the parking area. We also have a "false"
orchard to the southeast of this. The intention is to represent an orchard with the flowering trees, but not require maintenance at
the intensity of the true fruiting orchard. Visually these two will relate to one another with their variety of spring bloom.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasaCci)_fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 03/07/2016
03/07/2016: The index of sheets on the Cover Sheet needs to match the
individual sheet names. See redlines. Also, please remove Landscape naming
to the grading sheet.
Response: Index and sheet names have been revised.
Comment Number: 2 Comment Originated: 03/07/2016
03/07/2016: Update the date on the Drainage Report under Storm Drainage
Notes on the General Notes Sheet.
Response: The notes have been updated.
Comment Number: 3 Comment Originated: 03/07/2016
03/07/2016: Please add the standard sidewalk repair note to the Demolition
Plan sheets in the Utility Plan and the Site Plan:
"Any damaged curb, gutter and sidewalk existing prior to construction, as well
as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due
to construction of this project; shall be replaced or restored to City of Fort
Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of
Occupancy."
Response: Standard sidewalk repair note added to Demolition Plan Sheets.
Comment Originated: 03/07/2016
Response
Comment Number: 4
03/07/2016: ADA ramps will be needed at the northwest corner of Kechter
Road and Lady Moon Dirve as well as the northwest comer of Saber Cat Drive
and Lady Moon Drive.
There are existing ADA ramps in these locations.
Comment Number: 5
Comment Originated: 03/07/2016
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 3of16
been added.
03/07/2016: Please work with Traffic Operations to determine the location of
the pedestrian crossing. should be located on Ziegler Road. If the crossing will
be at the park driveway, please verify that the ramps line up with Sage Creek
Road. Response: At this time there will be no striped or signalized pedestrian crossing at Ziegler.
Comment Number: 6
Comment Originated: 03/07/2016
03/07/2016: Please provide an overall Demolition Plan Sheet. Response: An overall Demo sheet has
Comment Number: 7 Comment Originated: 03/07/2016
03/07/2016: The sidewalk connection from Saber Cat Drive to Ziegler Road
looks like it will interfere with the proposed sidewalk ramp. Please revise. Response: There is a minimum of
36" clear from the top of the ramp and the back of the walk.
has been revised.
requirements.
Comment Number: 8
Comment Originated: 03/07/2016
03/07/2016: Sheet UT-8 is not shown on the Utility Plan Key Map. Please
provide. Response: Sheet UT-8 has been added to the Key Map.
Comment Number: 9
Comment Originated: 03/07/2016
03/07/2016: Move the key map for the grading plan to the same comer on each
grading plan sheet. Keep it consistent on each page to prevent any confusion. Response: The grading plan
Comment Number: 10
Comment Originated: 03/07/2016
03/07/2016: The grading Sheets (IG-01- LG-10) do not have the correct
overall sheet numbers. Please adjust. Response: The grading plan has been revised.
Comment Number: 11
Comment Originated: 03/07/2016
03/07/2016: Some of the callouts, references, cross sections within the
Grading Plan need adjustment. See redlines. Response: The grading plan has been revised.
Comment Number: 12
Comment Originated: 03/07/2016
03/07/2016: Please look at the plan and profile sheets for Ziegler Road and
Lady Moon Drive. There are areas that exceed to 0.4% grade breaks. The curb
returns at the driveways show slopes greater than 2%. These grades would not
meet ADA across the ramps. The vertical curve for an arterial street has k
values >= 90 and minimum lengths of 150'. These can be looked at further since
it is in a deceleration right turn lane. Response: The profiles have been revised to meet the code
Comment Number: 13
Comment Originated: 03/07/2016
03/07/2016: There is across section on south Ziegler Road that exceeds the
4% cross section for reconstruction. The saw cut may need to move further west
to meet the maximum slope. The cross sections on Lady Moon Drive needs to
be looked at further. All portions exceed the 4% cross slope, while one cross
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 4 of 16
section doesn't meet the 1.5% minimum. As proposed, engineering would not
support this design. Response: The flowline profile has been revised to reduce the cross slope.
Comment Number: 14
Comment Originated: 03/08/2016
03/07/2016: Label Pedestrian Ramp Detail and the 1' Rollover Curb details on
Sheet DT-6 as "On -Site Only" Response: Ramp detail and Rollover Curb detail labeled as "On -Site Only".
Comment Number: 15 Comment Originated: 03/08/2016
03/07/2016: Use Detail D-106 for a culvert with a detached walk instead of an
attached walk. Response: The project now has both types of sidewalk culverts, both details are included.
Comment Number: 16
Comment Originated: 03/08/2016
03/07/2016: Please show the access easements associated with the Poudre
School District property (Sabre Cat Drive) on the Utility Plans. Response: The access easement is shown.
Comment Number: 17
Comment Originated: 03/08/2016
03/07/2016: All ROW and alignment dedications need to be finalized prior to
the approval of the utility plans. Please work with Real Estate Services to
finalize the documents. Response: Acknowledged.
Comment Number: 18 Comment Originated: 03/08/2016
03/08/2016: Label new ROW lines that is being dedicated with this project.
Response: Proposed ROW is labeled and a detail is provided on sheet DT-9
Department: Environmental Planning
Contact: Kelly Kimple, 970.416.2401, kkimple(atfcaov.com
Topic: General
Comment Number: 1
Comment Originated: 03/08/2016
03/08/2016: Is this a 100' buffer from McClelland Creek and 50' for the ditch?
The buffer will be referred to in your Development Agreement as the Natural
Habitat Buffer Zone (NHBZ). For the purposes of the DA, future inspections, and
evaluating the overall establishment and success of the resource restoration
and buffer, please label consistently as the Natural Habitat Buffer Zone (NHBZ)
on all sheets that show the buffer.
Response: The NHBZ has been revised on all SP-XX sheets, as well as all LL-XX sheets. A.revised legend has been included,
as well as additional labels on all plans. There is not a ditch within this property. The required SF for the NHBZ is determined as
100' buffer from the top of bank. We have then taken this SF, and modified the boundary to adhere to the design constraints.
The revised NHBZ falls only in native seed areas within the park.
Comment Number: 2
Comment Originated: 03/08/2016
03/08/2016: On sheet SP-01 it is hard to differentiate the NHBZ from the
100-year floodplain and other dashed lines. Please use different symbology for
the buffer, perhaps a dotted line, to better distinguish it. Also, please label the
buffer on all sheets, such as SP-02 that shows the boundary but does not have a
label
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 5 of 16
Response: This has been revised on all SP-XX sheets, as well as all LL-XX sheets. A revised legend has been included.
Comment Number: 3 Comment Originated: 03/08/2016
03/08/2016: The determination of the buffer line is unclear. If this is a 100'
buffer it has been averaged with what appears to be 0' setback from top of bank
in some areas and more than 100' in other areas. We recommend moving the
buffer boundary to the edge of trails and borders the encompass native
landscaping around the stream. Using these more clearly defined breaks in the
landscaping will make it easier to review and monitor the success of the NHBZ
over the long term. For clarity, please also include a table that shows the total
area required for a straight 100' buffer versus the total area provided.
Response: The NHBZ has been revised on all SP-XX sheets, as well as all LL-XX sheets. It is labeled as such as well. There is
not a ditch within this property, so the NHBZ is determined as 100' buffer from the top of bank. We have then taken this SF, and
modified the boundary to adhere to the design constraints. The revised NHBZ falls only in native seed areas within the park, and
clearly follows the proposed walkways and other site design elements. A table has been included on sheet SP-01
Comment Number: 4
Comment Originated: 03/08/2016
03/08/2016: As per the Land Use Code, the buffer distance for stream
corridors is measured from top of bank. Is "toe of slope" synonymous with "top
of bank". How was this measured? Please use "toe of slope" to measure the
buffer zone distances and re -label on all plan sets.
Response: Toe of slope refers to a detail for bank reinforcement in the creek bed. This is not in any way related to top of bank
alignment. The NHBZ has been determined based on the proposed top of bank alignment.
Comment Number: 5
Comment Originated: 03/08/2016
03/08/2016: Turf grass is shown within some areas of the NHBZ, such as on
sheet LL-02. Turf grass is not compatible with the intent of the NHBZ. Please
see comment #3 regarding the delineation of the NHBZ and update
accordingly.
Response: The NHBZ has been revised. All turf grass is outside of this boundary. Native seed areas are within the boundary.
Comment Number: 6
Comment Originated: 03/08/2016
03/08/2016: Is the area in the center of McClelland Creek on sheet LL-02 the
nature play space? Please label as such and will you be providing a detail of
this area?
Response: This has been labeled.
Comment Number: 7
Comment Originated: 03/08/2016
03/08/2016: A note should be added to the landscape plan regarding the seed
mixes proposed in the buffer may change based on what species
respond best. All seed mix changes shall be approved by the City's
Environmental
Planner.
Response: The proposed seed mixes are from the recommendation of the City's park Planning department and Natural Areas
Department. They have been approved by the Storm Water Department.
Comment Number: 8 Comment Originated: 03/08/2016
03/08/2016: Thank you for providing a photometric plan with this FDP
submittal. With respect to lighting, the City of Fort Collins Land Use Code, in
Article 3.2.4(D)(6) requires that "natural areas and natural features shall be
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 6 of 16
protected from light spillage from off -site sources." Thus, lighting from the
parking areas or other site amenities shall not spill over to the buffer areas.
Please update the lighting fixtures and photometric plan to remove any light
spillage and clearly label the NHBZ on all sheets.
Response: The NHBZ has been revised. There is minimal light spillage into the NHBZ, but after additional review with Kelly K
through email, the revised NHBZ has been approved. The .proposed boundary is a simple boundary defined by site design.
Comment Number: 9
Comment Originated: 03/08/2016
03/08/2016: Once updated, the Natural Habitat Buffer Zone (NHBZ) needs to
be labeled on the site, grading, utility, and landscape plans. A note should be
added to the site, landscape, utility, grading, and storm sewer plan that the
natural habitat area is meant to be maintained in a native landscape. This will
help preserve the intention behind the buffer zones and the natural features into
the future.
Response: This note has been added to SP-01, and all LL-XX sheest.
Comment Number: 10 Comment Originated: 03/08/2016
03/08/2016: Please add the following statement to the notes on any sheets that
show the NHBZ: Please see Section 3.4.1 of the Land Use Code for allowable
uses within the buffer zone.
Response: This note has been added to SP-01, and all LL-XX sheest.
Comment Number: 11 Comment Originated: 03/08/2016
03/08/2016: Please add an Environmental Planner signature to all utility plans
that show the NHBZ.
Response: The NHBZ has been added to the utility plans.
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tuchanan(&-fcgov.com
Topic: Landscape Plans
Comment Number: 21
Comment Originated: 03/07/2016
03/07/2016:
Continued:
The tree inventory information needs some editing. All existing trees are
numbered in the table on sheet SP03 but these same trees are not numbered
on the direct label on sheet SP02. All existing trees need to be numbered in
both the table an on the plan. Also in the direct label information should be
marked with the word remove or remain. At the east end of the site there is a
group of what appears to be 5 spruce to retain but the label only indicates 3.
Evaluate with Ralph Zentz further if any of the Austrian pines in the large grove
on the south edge of the project can be transplanted. This should be reviewed in
an onsite meeting.
Response: Existing tree inventory has been revised to include numbering on both sheets as well as "remove" and "remain".
There are (5) existing spruce labeled at the east side of the park. There are (2) to remove and (3) to remain; #71, 72 are
removed, #76, 77, 78 are to remain. On further review with Ralph, the (12) Austrian along the north edge of the park near the
existing BMX were not suitable for transplant.
12/15/2015: Continued: Tree inventory plan has not been provided in the plans
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 2 of 13
05/27/2015: Please verify that the directional ramps that cross Ziegler Road
lines up with the existing ramps on Sage Creek Road.
Response: Completed with 9.2.15 submittal
09/09/2014: The proposed driveway to the parking lot on Ziegler road appears
too close to the existing ADA ramp connecting to Sage Creek Road. This may
need to be rebuilt with the construction of the proposed driveway. Please see
LCUASS Drawing 707 for driveway details. This detail will be required for final
plans.
Response: There are directional ramps at the new driveway entrance that eliminate the need for this existing ramp that will be
removed with the driveway.
Comment Number: 14 Comment Originated: 0910912014
09/15/2015: A letter of intent for an access easement along Saber Cat Drive
on PSD property will be required prior to hearing. This will also be needed for
the proposed diagonal parking.
Response: Letter has been submitted
05/27/2015: The proposed diagonal parking along Saber Cat Drive appears to
be on Poudre School District Property. An offsite easement will be required to
complete this work. If half of the drive is owned by the applicant, please show
the correct property line boundaries.
Response: Letter of intent has been submitted
09/09/2014: Plans call for work outside the property limits. There is a section
on the southeast corner of the property where the pond, walk and boardwalk are
proposed that lie outside the limits that belong to the Poudre School District. A
letter or an agreement will be required to develop on their property.
Response: Letter of intent has been submitted
Comment Number: 19
Comment Originated: 09/10/2014
09/10/2014: Please show the location of the subdrain, cleanouts and point of
subdrain discharge from the Harvest Park Subdivision to the east on the Utility
Plans. The subdrain location can be found on the Utility Plans for Harvest Park,
sheets 124-126.
Response: Completed with 9.2.15 submittal
Comment Number: 20 Comment Originated: 05127/2015
09/15/2015: Labels needed on Sheets PP-2, PP-3 and FP-1.
Response: Labels have been added.
05/27/2015: Please label Saber Cat Drive as a "Private Drive" on all sheets in
the Utility, Landscape & Site Plan.
Response: Completed with 9.2.15 submittal
Comment Number: 22
Comment Originated: 05/27/2015
09/15/2015: Show ROW alignments needed along Kechter Road and Ziegler
Road. ROW alignments will also be needed for Lady Moon Drive. Alignments
will be needed for all areas of detention and stormwater conveyance. The
drainage area to the southwest of the property along Ziegler Road as well as
the creek boundaries will need to be in drainage alignments.
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 7 of 16
that were provided by Park Planning for review. This information must be
provided to Forestry for review and included in the plan set before bidding.
09/18/2015: '
Provide inventory information on sheet SP 02 for street trees along Saber Cat
and other exiting trees near the street that are not identified on the tree
evaluation plan. Forestry has provided this information. These existing trees
need to be identified by species, size condition and mitigation as others have
been. Trees identified for transplanting by Forestry need to be recorded for
transplanting. The locations where transplanted tree will be transplanted needs
to be shown on the plan. Provide notes that describe the tree transplanting
process such as time of year, size of root ball and after care. Clearly show
which trees will be transplanted.
Response: Tree inventory information was provided for street trees along the south edge of Sabercat, however this did not include
the existing diameter of some of the trees. This has been revised. There are not any trees proposed for transplant.
Comment Number: 23
03/07/2016:
Comment Originated: 03/07/2016
Continued:
The Forestry Division tree protection specifications have not been added to the
plan. There are 19 specification items that need to be placed on the plan.
Response: These are now included as sheet SP-05
12/15/2015: Forestry tree protection specifications have not been included at
this time. The Forestry specification should replace those currently on the plan.
09/18/2015:
Use the Forestry Division tree protection specification on the plan in place of
those being used. Place these specifications on the plan. Forestry Division tree
specification are available from the City Forester.
Comment Number: 29 Comment Originated: 03/07/2016
03/07/2016:
Continued:
A on -site meeting needs to be schedule with Ralph Zentz to review the
proposed prop design.
Response: A meeting has taken place between Craig K. and Ralph
12/25/15: Continued: A design and notes will need to be provided for the prop
to supper the limb. Work with Ralph Zentz for information on placement. An
on -site meeting appears necessary and is recommended before the design is
finalized.
09/18/2015:
Existing tree number 25 has been identified as needing a prop to reduce risk.
Provide appropriate notes and a design of the prop for this tree. It is suggested
that this be defined in a detail.
Comment Number: 32
03/07/2016:
Comment Originated: 03/07/2016
Continued:
Planting details still need to be reviewed with Ralph Zentz to obtain comments.
Revised detail will need to be approved by Forestry and included on the plans.
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 8 of 16
Response: A meeting has taken place between Craig K. and Ralph
12/15/2015: Continued: There a number of items related to the tree planting
details on sheets LP-13 and LP-14 that Forestry has comments on. Contact
Ralph Zentz, Senior Urban Forester to receive Forestry comments on the edits
requested to these details. Revised details will need to be approved by Forestry
and included on the plans.
09/18/2015:
Revise the planting detail to say set root ball 1 inch higher than the finish grade.
Comment Number: 34
Comment Originated: 03/0112016
03/07/2016:
Continued:
Please confirm if all references to City Forestry providing the mulch has been
removed.
Response: All references have been removed.
12/15/2015:
On sheet POC-00 a landscape note states that mulch is to be provided by the
Forestry Division. This note should be removed. The project manager can
check with Forestry when landscape work begins to determine if Forestry mulch
can be provided for some or the entire project.
Comment Number: 36 Comment Originated: 03/07/2016
03/07/2016:
Continued:
This detail was not provided for review with this round of submittal.
Response: This detail is not included as a part of the FDP submittal. It is included in the 95% CD set, which is not the same
submittal. References to this detail have been removed from the FDP submittal. Upon discussions with Ralph, the species in
this location has been revised.
12/15/2015:
The detail for the harvest room on sheet LP-11 does not identify the type of
trees at the north end of this area?
Comment Number: 38
03/07/2016:
Comment Originated: 03/07/2016
Continued:
For the double row of Accolade Elm generally located at the SW section of the
Park Forestry recommends adding tree diversity as follows. Incorporate some
Choice City David Elm Ulmus davidiana'Choice City' into the row of Accolade
Elm.
Response: This has been revised.
12/15/2015
Forestry is concerned with the degree that Accolade Elm is used on the plans
where even -aged monocultures in a long row of the same species of tree occur.
Forestry is asking that one or two additional shade tree species be strongly
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 9 of 16
considered for incorporating into these rows. This could reduce the risk of the
impact of uniform decline when only a single species is used.
Comment Originated: 03/07/2016
Comment Number: 40
03/07/2016:
Continued:
Response: This has been revised.
Upon further discussions with Ralph, these trees will be reviewed on site for exact placement.
Try to provide some better separation in these areas.
12/15/2015
Some of the shade trees are around 20 feet from orchard trees. Forestry
recommends keeping shade trees at least 30 feet from orchard trees to help
reduce the competition for light and over topping by the bigger trees.
Comment Number: 42
03/07/2016:
Comment Originated: 03/07/2016
Continued:
Forestry is very concerned with this detail. These raised planters will not provide
adequate soil volume for these trees to grow and thrive long term. Why are they
being recommended in the dog park? Is it feasible to just plan the trees at
grade? This item needs more discussion and review.
Response: These are removed from the project.
12/15/2015
Trees are shown in the proposed Dog Park area. The groups of trees shown in
this area are noted to be in a RCP raised planting ring, but there does not
appear to be a detail or description of what that is. Please provide an answer to
these Forestry questions and provide a detail of what the RCP raised planting
ring is so Forestry can review this item.
Comment Number: 43 Comment Originated: 03/07/2016
03/07/2016:
Continued:
Utility plans were not provided to Forestry for this round of review. It was noted
at the last review that a sewer main crosses the site and that there are
proposed trees near it that do not meet the separation standard. Show the
location of utility lines on the landscape plan that require a tree separation
distance and make adjustments as needed to tree positions to meet the LUC
separation standard.
Response: The sewer main and easement have been labeled on all sheets, included dimensions. All trees on either side of this
easement are in compliance with the below minimum distances. We have included a table on SP-XX sheets and LL-XX sheets
with minimum distances required.
12/15/2015
Provide tree separations from utilities to the Land Use Code 3.2.1 K. It
appears some trees may be too close to the existing sewer main running
across the park and possibly to other utilities. Review tree spacing from utilizes
and make adjustments where needed. Show utility locations on the landscape
sheets so trees can be correctly located in relation to these lines.
Forty feet between shade trees and streetlights
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 10 of 16
Twenty feet between shade and/or ornamental trees and traffic control signs
and devices.
Ten feet between trees and water or sewer mains
Six feet between trees and water or sewer service lines
Four feet between trees and gas lines
Contact the City Storm Water Department to get their separation standard from
storm drains.
Response: We have confirmed we are in compliance with Storm Water as well. We have included a table on SP-XX sheets and
LL-XX sheets with minimum distances required.
Comment Number: 44
03/07/2016:
Comment Originated: 03/07/2016
Continued:
This item still needs to be reviewed with Ralph Zentz to get Forestry input.
Response: This detail has been reviewed by Ralph and revised.
12/15/2015
Review the detail for the Inline drip pipe assembly for trees in native grass on
sheet LI-10 with Ralph Zentz to obtain Forestry input.
Comment Originated: 03/07/2016
Comment Number: 47
03/07/2016:
There are number errors in the summary tables for trees on sheet LL-00. Totals
for Italian Plum, Stanley Plum and Montmorency Cherry are not recorded. Just
one random check of coffeetrees was performed by Forestry and this check
indicated there is a large error in the total coffeetrees recorded. Eleven
coffeetrees are recorded on sheet LL-00 but there are many more than 11
shown on the plans. The Project needs to carefully verify all tree totals and
correct errors in the tree list schedules.
Response: This has been revised on LL-00. This same scheduled is duplicated on all LL-XX sheets — so the quantities showing
are total for the project, not per sheet.
Comment Number: 48
Comment Originated: 03/07/2016
03/07/2016:
Contact the City Forester to discuss cultivars of apples and plum for use in the
orchard.
Response: The Italian plums will be revised to Mount Royal per forestry's suggestion.
Department: Light And Power
Contact: Rob Irish, 970.224.6167, ririshAftgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/09/2016
03/09/2016: The streetlight shown to be relocated along Lady Moon may need
to be placed across the street to the East. This would involve trenching
approximately 200' down from an existing streetlight for a feed.
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 11 of 16
Response: Acknowledged.
Comment Number: 2 Comment Originated: 03/09/2016
03/09/2016: System modification charges will apply for all streetlight and vault
Response: Acknowledged.
relocations.
Comment Number: 3
Comment Originated: 03/09/2016
03/09/2016: Please send electronic (CAD) versions of the Approved Site and
Utility plan to CJHousley@fcgov.com to be placed on our basemaps.
Response: Acknowledged.
Comment Number: 4 Comment Originated: 03/09/2016
03/09/2016: Please contact Light & Power Engineering if you have any
questions at 221-6700. Please reference our policies, development charge
processes, and use our fee estimator at
http:/twww.fc-gov.com/ublibes/business/builders-and-developers.
Response: Acknowledged.
Comment Number: 5 Comment Originated: 03/09/2016
03/09/2016: Electric Capacity Fee and Building Site charges will apply to this
development. Please click on the following link for Estimated Light & Power
charges and the Light & Power Fee calculator.
http://www.fcgov,com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Response: Acknowledged.
outfall
Department: Stormwater Engineering
Contact: Heather McDowell, 970.224.6065, hmcdowelpgov.com
Topic: Construction Drawings
Comment Number: 8
Comment Originated: 03/08/2016
03/08/2016: Sheet UT-2 and UT-5 — Please verify that the 2-30-inch culvert
design information shown on the utility plans is consistent with what is analyzed
in the drainage report. Response: The plans and the report are consistent.
Comment Number: 9 Comment Originated: 03/08/2016
03/08/2016: Sheet UT-2 — fill in some missing french drain design info. Response: Complete
Comment Number: 10
Comment Originated: 03/08/2016
03/08/2016: Sheet UT-3 — please include a hydraflow analysis in the drainage
report for the 18" RCP located south of the ball fields Response: Hydraflow analysis is now included for this
Comment Number: 11 Comment Originated: 03/08/2016
03/08/2016: Sheet UT-8 — Please clarify what sort of surface material is
planned for the two circle areas with the area drains in them. If this area is also
wood fiber mulch it seems like the drains are going to quickly clog up. Also, fill
in some missing design information for the underdrains shown on this page. Response: A surface material
legend has been added. There are area drains in the silos, the surface material in the bottom of the silos will be rubber play tiles.
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 12 of 16
plan.
Comment Number: 12 Comment Originated: 03/08/2016
03/08/2016: Landscape Grading Plans
— the floodway lines need to be included on these plans.
- please provide a legend on these plans that clarifies what the abbreviations
stand for. (i.e. FS, TLF, TC, BC, etc) as some are difficult to determine.
— add contour labels along stream area. Response: The grading plan has been revised.
Comment Number: 13
Comment Originated: 03/08/2016
03/08/2016: Sheet LG-03 — There are several notes throughout the
"Landscape Grading Plans" that say "RE:CIVIL". Please be specific with this
note and callout the specific details so that the contractor doesn't
mis-understand or completely miss something. Also, its unclear what happened
to the Civil Grading Plans. Were these replaced with the Landscape Grading
Plans? Response: The grading plan has been revised.
Comment Number: 14 Comment Originated: 03/08/2016
03/08/2016: Sheet LG-03 — Please include spot elevations for all the
underdrain pipe cleanout rims. Response: The underdrain clean out rims have been added to the grading
Comment Number: 15 Comment Originated: 03/08/2016
03/08/2016: Sheet LG-06 - the attached sidewalk located along the north side
of the parking lot is supposed to slope down toward the parking area. There are
some spot elevations that indicate otherwise. Please revise. Response: The grading plan has been revised.
Comment Number: 16
Comment Originated: 03/08/2016
03/08/2016: Sheet LG-06 - The low point in the driveway where the double
30-inch culverts are located needs to be more clearly labeled. There is a 2' curb
cut on the north side of the drive aisle that needs to be labeled. The ponding
depth for the overtopping flow in this area needs to studied to ensure that the
overtopping doesn't spill onto Ziegler or into the parking lot. The grading plan
may need to be revised through here to contain the overtopping. Response: Per the drainage report, the
overtopping of the roadway ponds to an elevation of 0.57'.above the spillway. Per the revised grading plan, there is a minimum of
0.7' available before the water overtops the roadway high point.
Comment Number: 17 Comment Originated: 03/08/2016
03/08/2016: Sheet DT-1— please indicate slopes into the french drain on the
detail. Response: The minimum slope has been labeled.
Comment Number: 18
Comment Originated: 03/08/2016
03/08/2016: Sheet DT-4 — replace the Type R inlet details with the City of Fort
Collins detail D-43 or 44. Response: The Type R inlet has been replaced with two sidewalk chases and a
Type C inlet behind the sidewalk.
Comment Number: 19 Comment Originated: 03/08/2016
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 13 of 16
03/08/2016: See redlined Utility Plans for other minor comments. Response: Acknowledged.
Topic: Drainage Report
Comment Number: 2 Comment Originated: 03/08/2016
03/08/2016: For the sump manhole and SNOUT at the BMX park: The Utility
department is fine with the sump manhole and SNOUT proposed for the BMX
park as long as the Parks department understands the maintenance
requirements for this system. Response: Acknowledged.
Comment Number: 3
Comment Originated: 03/08/2016
03/08/2016: Pg 4 — Offsite Drainage section discusses the 2 30-inch culverts
passing 57 cis, but the analysis indicates that 87 cfs is passing through. Please
update the analysis or write-up. Response: 87 cfs is accurate; the report text has been updated.
Comment Number: 4
Comment Originated: 03/08/2016
03/08/2016: Appendix C — Hydraulic Calculations — The inlet located at the
vehicle turn -around has been designed as a Type R inlet. Please revise this to a
combination inlet as we have seen Type R inlets become somewhat of a safety
concern in areas of high pedestrian traffic. Response: The Type R inlet has been replaced with two
sidewalk chases and a Type C inlet behind the sidewalk.
Comment Number: 5
Comment Originated: 03/08/2016
03/08/2016: Appendix D - LID Calculations and Alternative Compliance
Application — I don't think this appendix is needed any longer as I don't think
you're seeking a variance and the LID exhibit is provided in the back pocket. Response: We are not
seeking a variance, this has been removed from appendix D.
Comment Number: 6
Comment Originated: 03/08/2016
03/08/2016: LID Exhibit— please add the impervious run-on area to the pavers
requirement section of the LID table. Response: The LID exhibit has been revised.
Comment Number: 7 Comment Originated: 03/08/2016
03/08/2016: See redlined drainage report for other minor comments. Response: Acknowledged
Contact: Jesse Schlam, 970.218.2932, 11chlam0-fcoov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 02/22/2016
02/22/2016: Per our phone conversation just a short while ago some significant
concerns I wanted to bring up and get address. The Plan will need the following:
1)Showing specific areas of slope protection along the channel on the plan set.
2)Showing more bank erosion control details to make sure the banks will have
less erosion control impact while seeding is occurring. 3) Adding erosion
control rolled product details to the plans from the Jute to any Straw blankets,
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 14 of 16
etc...
Response: Slope protection is now shown. We will advance the details after a contractor has been selected.
The Report will need the following. 4)With this being such a sensitive area. I will
need a little more specific and detailed process and means of construction in
this channel which will minimize the impact and pollutant discharge while
working in the water way (i.e. the rock check dams and pump bypass labeled on
the plans) I understand this is generally out of an engineer's scope and so the
contractor may need to be the ones who supply this information after the project
bid has been awarded.
Response: Additional details will be added to the report once a contractor has been selected and a dewatering plan has been
established.
Two minor things not mentioned per the phone conversation 5)The report will
need to have the current vegetative cover or percent density, currently not found
in the Erosion Control Report. 6)The escrow may need to be recalculated with
Plan Revisions. If you need clarification concerning the erosion control section,
or if there are any questions please contact Jesse Schiam 970-218-2932 or
email @ jschlam@fcgov.com Response: Acknowledged.
Contact: Mark Taylor, 970.416.2494, mtaylo ),fcgov.com
Topic: Construction Drawings
Comment Number: 24
Comment Originated: 03/08/2016
03/08/2016: Please include the existing and proposed 100-year flood plain
boundaries on Sheets UT-1 through UT-8. Response: Floodplain boundaries are shown.
Comment Number: 25
Comment Originated: 03/08/2016
03/08/2016: On FP-1, please show the bridges, and identify them including
notes about being break -away type bridges. Reference a Detail Drawing and
Sheet No.
Response: Structural sheets have been included in this resubmittal
Comment Number: 26
Comment Originated: 03/08/2016
03/08/2016: Please include a detail drawing of the existing relocated bridge
and the two new bridges and show how they will be made to break away and
how that will work.
Response: Structural sheets have been included in this resubmittal
Comment Number: 27
Comment Originated: 03/08/2016
03/08/2016: On FP-1, when the modeling report has been updated, we will
need BFE elevations for each cross section shown. Response: Acknowledged
Comment Number: 28
Comment Originated: 03/08/2016
03/08/2016: On FP-1, it appears we will need additional cross sections at the
low flow boulder crossing, the raised viewing platform (Sta. 66 - 67), and the
play area. Response: Acknowledged
Southeast Community Park FDP - PDP Round 3 Responses
;February 9, 2016
Page 1 S of 16
Comment Number: 29
Comment Originated: 03/08/2016
03/08/2016: On FP-1, include information about the raised viewing area (e.g.
detail drawing) so we can see how it fits into the surrounding ground and how it
relates to the floodplain and the BFE. Response: Details for the raised viewing area have been added (S-4)
Topic: Floodplain
Comment Number: 20 Comment Originated: 03/08/2016
03/0812016: Please show the 100-year floodplain boundaries on Sheets 2-6,
10,12,13-16, and 19-22 of the Stream Rehabilitation Plans. Response: Floodplain boundaries are shown
Comment Number: 21 Comment Originated: 03/08/2016
03/08/2016: In the Modeling Report; the report will have to be updated with the
topography reflecting the most up to date Stream Rehabilitation plans. Response: Acknowledged.
Comment Number: 22
Comment Originated: 03/08/2016
03/08/2016: In the Modeling Report; we are not going to review the report until
the model has been updated. as per the previous comment (No. 21). Response: Acknowledged.
Comment Number: 23
Comment Originated: 03/08/2016
03/08/2016: We would like to have a meeting prior to updating the model to go
over the location and number of cross -sections, etc. Response: Acknowledged, Interwest has contacted
Shane Boyle to set up this meeting.
Topic: Site Plan
Comment Number: 30
Comment Originated: 03/08/2016
03/08/2016: On SP-1, please include the existing and proposed floodplain
boundaries, and make it easier to differentiate them from each other, and from
the natural resources buffer and the boundary lines.
Response: This has been revised, and a revised legend has been included.
Department: Technical Services
Contact: Jeff County, 970.221.6588, 11countyMcgov.corn
Topic: General
Comment Number: 1 Comment Originated: 03/11/2016
03/11/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Response: The redlines have been addressed.
Department: Traffic Operation
Contact: Martina Wilkinson, 970.221.6887, mvAlkinson0ftgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/08/2016
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 16 of 16
03/08/2016: Is there an overall site plan and a signing and striping plan? I got
the Utility plans, but didn't get anything else.
Response: Overall site plan is sheet SP-01
nespui ise: H Sir ipirly pial i i lab ueei 1 auueu iu ii is pidi is.
Department: Water Conservation
Contact: Eric Olson, 970.221-6704, eolson(&.fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 0211912016
02/19/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 oreolson anfcgov.com
Response: Acknowledged.
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 3of13
05/27/2015: Please show the ROW and property boundaries along Kechter
Road and Ziegler Road. The public sidewalk along these streets appears to be
on the property. Please show all alignment boundaries for the sidewalks as well
as all Utility Alignments throughout the project. Future alignments will be needed
for any fire lanes, drainage areas, rain gardens, etc. Please show these
boundaries on the Utility Plan.
Response: (9.2.15) The existing ROW shown is accurate. When the improvements on the north side of Kechter -
including the roundabout - were constructed, no additional right of way was dedicated because the city owned the
property. City Survey (John Von Nieda) has confirmed that we are showing the existing ROW and property lines
correctly. Additional ROW along Ziegler will be required for the right turn lanes as well. This is being coordinated
through the City Surveying department. An emergency access easement has been shown for the fire
access. Drainage easements have not been requested from stormwater.
Comment Number: 23
Comment Originated: 05/27/2015
09/15/2015: Please move the concrete pan to line up with the flow lines from
the bump outs. The east bump out needs to match the west bump out to allow
for bicycles to continue biking along Lady Moon Drive. Concrete is needed for
the full length of the parkings stalls.
Response: The parking along Lady Moon has been updated.
05/27/2015: The exact layout for the angled parking will be discussed internally.
If allowed, outflow curb will be required in these areas. Spot elevations in these
areas will be needed to ensure that there is proper drainage.
Response: Completed with 9.2.15 submittal
Comment Number: 27
Comment Originated: 09/15/2015
09/15/2015: The driveway into the site and at Saber Cat Drive must meet
LCUASS detail 707.1. This shows concrete to behind the sidewalk. Detectable
warnings will need to be angled so they line up correctly across the driveway.
Please verify that this section meets ADA standars with a 1 /4"/LF cros slope for
the walk area. See redlines.
Response: The driveways have been modified to meet detail 707.1
Department: Environmental Planning
Contact: Lindsay Ex, 970-224.6143, lex@fcgov.com
Topic: General
Comment Number:
Comment Originated: 09/09/2014
09/09/2014: 1 have received and reviewed the ECS and preliminary plans - this
project is ready for hearing from an Environmental Planning perspective. I will
review the proposed landscape materials, e.g., seed mixes, at time of final.
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 14 Comment Originated: 09/11/2014
09/18/2015: Continued see note number 21
05/29/2015: Comment continued from 09/11/2014
09/11/2014:
There appear to be some inaccuracies in the tree inventory information on
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 4 of 13
SP-02 particularly at the west end of the site in reference to some tree
locations, species and intent to remove or retain. Also there are existing street
trees along Saber Cat and some other existing landscape trees along the north
boundary and the east area by the pond that are not shown on Tree Evaluation
Sheet SP-02 that will need to be inventoried.
Please contact the City Forester for an on -site meeting to review and refine the
tree inventory information. All existing trees will need to be accurately shown by
location with the species, size, condition, intent to protect or remove and
mitigation recorded. This also includes all landscape and street trees that are
located on the site.
Response: This has been revised on sheets SP-02/03
Comment Number: 16 Comment Originated: 05/29/2015
09/18/2015: Continued: City Forester was not included in the meeting.
05/29/2015:
Set up a meeting with the City Forester and Assistant City Forester to discuss
and receive some additional detail comments on the recent plans.
Response: Received additional comments from forestry, and have addressed them.
Comment Number: 18
Comment Originated: 05/29/2015
09/18/2015: CONTINUED see note number 23
05/29/2015:
The Forestry Division has revised tree protection specifications for City
projects. These tree protection specifications will be provided to Park Planning
staff either by email or at the meeting requested in comment number 16. Please
place the tree protection specifications on the tree inventory sheet SP 02 in
place of those on sheet LL 00 if possible.
Response: These notes have been included on new sheet SP-04
Comment Number: 20
Comment Originated: 09/18/2015
09/18/2015:
Provide note on plan SP 02 that says all existing trees east of Lady Moon will
be retained.
Response: This has been added.
Comment Number:
Comment Number: 21
Comment Originated: 09/18/2015
Comment Originated: 09/18/2015
09/18/2015:
Provide inventory information on sheet SP 02 for street trees along Saber Cat
and other exiting trees near the street that are not identified on the tree
evaluation plan. Forestry has provided this information. These existing trees
need to be identified by species, size condition and mitigation as others have
been. Trees identified for transplanting by Forestry need to be recorded for
transplanting. The locations where transplanted tree will be transplanted to
needs to be shown on the plan. Provide notes that describe the tree
transplanting process such as time of year, size of root ball and after care.
Clearly show which trees will be transplanted.
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 5of13
Response: This has been added, now sheets SP-02/03. No trees are to be transplanted.
Comment Number: 22
Comment Originated: 09/18/2015
09/18/2015:
The tree mitigation table on SP02 has the incorrect total for required upsized
mitigation trees. Refer to the tree inventory to get the total for upsized mitigation
trees.
Response: This has been revised, now located on SP-03
Comment Number: 23
Comment Originated: 09/18/2015
09/18/2015:
Use the Forestry Division tree protection specification on the plan in place of
those being used. Place these specifications on the plan. Forestry Division tree
specification are available from the City Forester.
Response: This has been revised, and is on sheet SP-04.
Comment Number: 24
Comment Originated: 09/18/2015
09/18/2015:
Thin Leaf Alder is a mesic plant that is not suitable for dryer locations. Submit
some alternate species for Thin Leaf Alder to the City Forester for review.
Response: These have been removed from the plan.
Comment Number: 25
Comment Originated: 09/18/2015
09/18/2015:
Species Changes:
Ussurian pear has thorns and because of this quality the straight species it is
not suitable in public use areas particularly where there will be Children. The
cultivar of Ussurian Pear (Prairie Gem) does not have thorns and could be use
at the proposed locations. The LA should review the shape and form of Prairie
Gem to confirm its suitability for use at this location.
Forestry has some concerns with the long term growth and survival of Regal
Prince Oak. Explore the use of Prairie Sentinel Hackberry in its place. Review
shape and form of Prairie Sentinel for appropriateness at the proposed
location.
The use of Canyon Maple (Acer grandidentatum) at locations where Hotwings
Tatarian Maple is used along the channel would provide a better native and
xeric maple in these natural zone areas.
Response: Ussurian Pear has been revised to Prairie Gem Pear. Regal Prince Oak has been revised to Prairie Sentinel
Hackberry. Tatarian Maple has been revised to Canyon Maple.
Comment Number: 26
Comment Originated: 09/18/2015
09/18/2015:
Gambel oak is typically specified as clump by height. Specifying it as 8 foot
clump would be appropriate.
Response: This has been revised.
Comment Number: 27 Comment Originated: 09/18/2015
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 6 of 13
09/18/2015:
Change the street trees shown as Lindens long Ziegler and Lady Moon to
Kentucky Coffeetree. Forestry has identified problems in using Lindens on main
streets from heat and salts.
Response: These have been revisied
Comment Number: 28 Comment Originated: 09/18/2015
09/18/2015:
Two conifers on sheet LL 08 are not identified as to species.
Response:This has been revised.
Comment Number: 29 Comment Originated: 09/18/2015
09/18/2015:
Existing tree number 25 has been identified as needing a prop to reduce risk.
Provide appropriate notes and a design of the prop for this tree. It is suggested
that this be defined in a detail.
Response:This has been added to details.
Comment Number: 30 Comment Originated: 09/18/2015
09/18/2015:
Add street trees along Saber Cat at 30-40 foot spacing to meet the code
requirement for street trees.
Response: These have been added to plans.
Comment Number: 31 Comment Originated: 09/18/2015
09/18/2015:
Provide information that establishes the quality of the water that will be used to
irrigate trees in the park is suitable for tree growth. Provide information to the
City Forester.
Response: Park planning has not seen any harmful effects on the seeds at Radiant Park. Further information has been provided
to Forestry.
Comment Number: 32
Comment Originated: 09/18/2015
09/18/2015:
Revise the planting detail to say set root ball 1 inch higher than the finish grade.
Department: Light And Power
Contact: Rob Irish, 970-224.6167, rirish@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 05/27/2015
09/15/2015:
05/27/2015: Electric Capacity Fee, Building Site charges and system
modification charges where applicable will apply.
Response: Acknowledged. Is there a missing comment above for 9/15/15?
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 7 of 13
Comment Number: 4 Comment Originated: 05/27/2015
09/15/2015:
05/27/2015: Coordinate a transformer location with Light & Power Engineering
within 10' of a paved surface. Submit a C-1 Form and One -line diagram to
Light & Power Engineering for review.
Response: C-1 Form and One -Line diagram has been submitted to Light and Power Engineering for review.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogenc&fcgov.com
Topic: General
Comment Number: 15
Comment Originated: 09/10/2014
09/22/2015: The French Drain typical section shows a 6" depression and a
downward gradient on the downstream side of the drain. The drain should be
situated in a swale so as to more effectively capture runoff and to provide a
long-term visual queue as to where the French drain is located for long-term
maintenance. This can be addressed at final.
Response: A 6" swale with 4:1 side slopes is proposed over the top of the French drain
05/26/2015: Some of the detail has been addresses but proposed grading
does not show how these trenches will capture runoff. More detail is needed on
the Grading Plan and Trench Detail,
Response: Addressed with 9.2.15 submittal
09/10/2014: More info in required on the WQ trench. Plans state "filtration of
sediment will occur." Is there media that is to be used to filtrate? The method
will need to be considered a LID design. It does not appear that the trench will
intercept most flows.
Response: Addressed with 5.6.15 submittal
Comment Number: 16 Comment Originated: 09/10/2014
09/22/2015: In the drainage report, the SNOUT is still proposed for water quality
treatment at the BMX area. The comment response to this previous comment
was that the SNOUT would still help with maintenance but that the primary water
quality treatment for this area is the irrigation pond east of Lady Moon. A
manhole with a SNOUT usually includes a sump for debris settlement, so there
is still concern that a dirt BMX track will convey a large amount of sediment into
this sump area and require frequent maintenance of the manhole. Per a
previous comment, we need to see calculations or manufacturers specs. This
can be addressed at final.
Response: Manufacturers specs have been included in the drainage report. If the City is comfortable removing the SNOUT and
sump manhole and using the irrigation pond as the primary water quality source for the BMX area we can modify the design. The
intent of the SNOUT was to allow for easier maintenance access to remove sediment as compared to the irrigation pond.
05/26/2015: Not resolved. Will a snout and sump be enough to adequately
handle the possible large amount of sediment that could be transported from
this site? Calculations or manufacturer's specifications may be necessary in
this area.
Response: Addressed with 9.2.15 submittal
09/10/2014: Need to see info on the BMX WQ facility prior to approval on PDP
Southeast Community Park FDP — PDP Round 3 Responses
February 9, 2016
Page 8 of 13
plans.
Response: Addressed with 5.6.15 submittal
Comment Number: 17
Comment Originated: 09/10/2014
09/22/2015: Not resolved. Consider using pervious pavers at the turnaround at
the end of the drive aisle and/or including some bio-retention at the center area
of the turnaround. Including this area in the overall pervious pavers area may
achieve the 25% we are requiring. This can be addressed at final.
Response: Pavers have been added to the turnaround to exceed the 25% requirement.
05/26/2015: Not resolved.
Response: Addressed with 9.2.15 submittal
09/10/2014: City staff will not support a variance request to the 25% porous
pavement requirement.
Response: Addressed with 5.6.15 submittal
Comment Number: 20
Comment Originated: 09/10/2014
09/22/2015: A final modeling report will be required with the final submittal.
Response: The final McClellands Creek model has been submitted with the plans.
05/26/2015: No modeling submitted.
Response: Addressed with 9.2.15 submittal
09/10/2014: Eliminating the quantity detention requirements must be verified to
be approved with SW Master Planning by submittal of modeling supporting a
variance request.
Response: Addressed with 5.6.15 submittal
Comment Number: 24 Comment Originated: 09/12/2014
09/22/2015: Not Resolved. Please callout/label the French drain adjacent to the
dog park and verify that this French drain is allowed within the SFCSD
easement.
Response: French drain is adjacent to the dog park
05/26/2015: Appears to be proposed but needs more detail.
Response: Addressed with 9.2.15 submittal
09/12/2014: Provide WQ treatment for the dog park area.
Response: Addressed with 5.6.15 submittal
Comment Number: 25
Comment Originated: 09/12/2014
09/22/2015: Not Resolved. The drainage report text touches on addressing
stability and erosion control concerns for this area but the plans don't provide
any details. These will be required at final.
Response: A rock check dam is proposed at the end of the channel improvements upstream of the McClelland's Creek
connection. Approx. 80 LF of existing channel will be maintained in place which includes existing buried riprap. This is noted on
the erosion control plan.
05/26/2015: More detail needed.
Response: Addressed with 9.2.15 submittal
09/12/2014: Please define 100-year conveyance into the creek to address
stability and erosion control concerns. Provide detailed design for stabilized
drainageway improvements (i.e. riprap level spreader).
Response: Addressed with 9.2.15 submittal
Southeast Community Park FDP - PDP Round 3 Responses
February 9, 2016
Page 9 of 13
Comment Number: 27 Comment Originated
09/22/2015: Not Resolved.
Response: Channel plans have been completed showing the detailed channel design.
05/26/2015: Channel design is now shown. Is the intent to regrade the entire
channel or are there sections where the banks will be left undisturbed? Please
highlight areas where the thalweg will be realigned.
Response: Addressed with 9.2.15 submittal
09/12/2014: Please show channel design in utility plans.
Response: Addressed with 9.2.15 submittal
Contact: Heather McDowell, 9702246065, hmcdowell@fcgov.com
Topic: Drainage Report
Comment Number: 39
09/12/2014
Comment Originated: 09/22/2015
09/22/2015: Drainage Report - the report states that the 2-30" culverts will carry
approximately 57 cfs and that the remaining 99 cfs will overtop the drive aisle
and be conveyed to the creek without impacting any structures. The grading
plan doesn't show a low point in the drive aisle here and it looks like the road is
graded down to the northeast, thereby directing water across the parking area
toward the community gardens and shelter. Please revise this strategy. This can
be addressed at final.
Response: The entry drive grades have been revised to provide a low point that can convey the flow that overtops the culverts.
The culvert capacity has been increased as well do to additional headwater area.
Topic: General
Comment Number: 30
Comment Originated: 09/22/2015
09/22/2015: Sheet UT-1 - The legend on this sheet indicates floodplain lines,
please either remove these from the legend on this sheet or add the floodplain
lines to the sheet. In addition, a legend that included the different hatch patterns
for concrete, LID pavers and crusher fine paths would be helpful. This can be
addressed at final.
Response: Legend has been modified.
Comment Number: 31
Comment Originated: 09/22/2015
09/22/2015: Sheets UT-2 through UT-7 - See redlines for minor comments.
These can be addressed at final.
Response: The redlines have been addressed.
Comment Number: 32
Comment Originated: 09/22/2015
09/22/2015: Sheet GR-1 - The entire hillside south of the parking area appears
to drain onto the parking area and LID pavers. This is too much area for the
pavers to handle. Consider adding another French drain and swale located
along the south side of the parking area. This can be addressed at final.