City of Fort Collins, Minor Amendment Response
Ta Noah Beals
From: James Ohlson
CC: Matt Rankin, Jeff Jensen, Sunil Cherian, Matt Lerner
Date: 5/16/2013
Re: City of Fort Collins, Minor Amendment Response, Round #1
Noah,
Below you find our responses to the comments where emailed to us on May,1 St 2013.Our
comments are in Red type. All referenced attachments can be found at the end of this letter. If you
have any additional comments or questions please feel free to contact me by phone or email.
Comment Response Summary:
Department: Advance Planning: Contact: Timothy Wilder
Topic: Building Elevations
Comment Number: I Comment Originated: 04/24/2013
04/24/2013: Consider replacing the Hard Coat Stucco - W1 below the windows with a more
durable material. This is an area of the facade that could be exposed to ongoing wear and
tear, and a more durable material would provide a better, longer lasting appearance and
reduce the need for maintenance. Noted
Topic: Site Plan
Comment Number: 2 Comment Originated: 04/24/2013
04/24/2013: Please more clearly identify the dimensions and square footage of the building
and parcel on the site plan. Attached is an updated Site Plan with the information requested.
Comment Number: 3 Comment Originated: 04/24/2013
04/24/2013: The amount of parking on the site plan (34 spaces) appears to slightly exceed
the maximum parking ratio (3/1000 s.f., or .75/employees), which for a 10,000 s.f. building
rM
! I1 of 4
R4 Architects-117 E. Mountain Ave., Ste. 205, Fort Collins, CO 80524 P 970-224-0630
equals 30 spaces. Please indicate the estimated number of employees on the site plan so
that the amount of parking can be justified. Current employment provided is at 28
employees with plans to hire upon completion of the project. Four (4) spaces have been
deleted from the plan for a total of 30 spaces. See the attached updated Site Plan.
Department: Engineering Development Review: Contact: Tyler Siegmund
Topic: General
Comment Number:1 Comment Originated: 04/26/2013
04/26/2013: Please add the following note to the site plan:
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy. See the attached updated Site Plan.
Comment Number: 2 Comment Originated: 04/26/2013
04/26/2013: College Ave is governed by CDOT and this project will need to meet all CDOT
development requirements. CDOT is currently requesting traffic analysis from the existing
car wash use to the proposed office use. Please see attached memo from Matt Delich.
Comment Number: 3 Comment Originated: 04/26/2013
04/26/2013: Repairs to substandard/hazardous infrastructure along the frontage of the
property will be required prior to the issuance of building permit. The current chase drain in
the public sidewalk is a hazard and will need to be repaired to alleviate the trip hazard that
currently exists. Further evaluation of the existing drive approach off of College Ave is
necessary and may need to be repaired as part of this project. A sidewalk repair permit will
need to be obtained prior to any improvements. The chases will be leveled in a new
concrete bed and steel plates will be covered with a coating to help with slip resistance. We
ask that this comment be completed prior to the issuance of a'Certificate of Occupancy' and
NOT the building permit.
Department: Stormwater Engineering: Contact: Wes Lamarque
Topic: General
Comment Number:1 Comment Originated: 04/29/2013
04/29/2013: The existing site has storm water quantity detention in the existing parking lot.
This detention needs to stay and all drainage elements maintained. Noted
Comment Number: 2 Comment Originated: 04/29/2013
04/29/2013: If no site improvements are proposed, Stormwater has no more comments.
Department: Technical Services: Contact: Jeff County
Topic: Building Elevations
Comment Number:1 Comment Originated: 04/29/2013, 04/29/2013: No comments.
0 Page 2
Topic: Site Plan
Comment Number: 2 Comment Originated: 04/29/2013
04/29/2013: Please add a legal description of the project property. See updated Site Plan.
Comment Number: 3 Comment Originated: 04/29/2013
04/29/2013: There are misspelled words on sheet AS.1. See redlines. See updated Site
Plan.
Department: Traffic Operation, Contact: Ward Stanford
Topic: Traffic Impact Study
Comment Number:1 Comment Originated: 04/29/2013
04/29/2013: There hasn't been any contact between the applicant and Traffic Operations
regarding the need for a traffic study for this redevelopment/repurpose project. The
applicant needs to contact Ward Stanford @ 970-221-6630 to determine whether a traffic
study is required. Please see attached memo from Matt Delich.
Department: Water -Wastewater Engineering, Contact: Roger Buffington
Topic: General
Comment Number:1 Comment Originated: 04/25/2013, 04/25/2013: No comments.
Department: Zoning, Contact: Noah Beals,
See attached letter from Sherry Albertson -Clark with regards to landscaping and other information
on the Minor Amendment for this project.
Topic: General
Comment Number: I Comment Originated: 04/23/2013
04/23/2013: LUC 3.2.2(J) Along College Ave ROW there is required a 15 ft landscape
setback for vehicle use areas. On the plan there is an asphalted area that is labeled "New
site striping" this area is required to be landscaped. See updated site plan showing area for
new landscaping to comply with the 15 ft. landscape setback.
Comment Number: 2 Comment Originated: 04/23/2013
04/23/2013: LUC 3.2.2(C)(4) The new bicycle rack shall be located near the primary
entrance. The proposed location does not appear near the primary entrance and should be
moved closer. The bike rack is located next to the employees' primary entrance. This
element will be used frequently by the employees.
Comment Number: 3 Comment Originated: 04/23/2013
04/23/2013: LUC 3.2.2(K)(5) The Handicap stalls are required to be located as close as
possible to the primary entrance. The proposed handicap stall location do not comply one of
the stall spaces located next to the building will need to be a handicap stall. Please label
which stall space is the van accessible handicap stall. The handicap parking spaces have
been moved to the east of the main entry. The accessible entry that is located on the west
end of the building will be maintained as the accessible entrance. At the time of new site
improvements the handicap spaces will be relocated closer to the accessible entry.
Comment Number: 4 Comment Originated: 04/23/2013
0 Page 3
04/23/2013: LUC 3.2.1(5) Please identify how the required 6% interior landscaping for
Parking lot is being met, reminder that perimeter landscaping is not a part of this. It is our
understanding that the future work will be held in a letter of escrow. And work will completed
at a later date.
LUC 3.2.1(E)(5) When there is more than 15 parking stalls in a row they are to be evenly
broken up by a landscape island that is at least 8ft wide containing a canopy tree. A
landscape island is required along the North side of the parking lot. It is our understanding
that the future work will be held in a letter of escrow. And work will completed at a later date.
Comment Number: 5 Comment Originated: 04/23/2013
04/23/2013: LUC 3.2.2(L) The parking aisle that falls below the two-way minimum 24ft width
will need to be painted/signed as one-way. The Site Plan has be updated with dimensions
to show that all driveways are 24 ft. in width or greater.
Comment Number: 6 Comment Originated: 04/23/2013
04/23/2013: LUC 32.2(K)(1)(a) With 9882 sq ft of general office the maximum number off
street parking stalls is 30. Current employment provided is at 28 employees with plans to
hire upon completion of the project. Four (4) spaces have been deleted from the plan for a
total of 30 spaces. See the attached updated Site Plan.