HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY TWENTYTHIRD - Filed CS-COMMENT SHEETS - 2016-08-10Project Comments Sheet
Selected Departments
Department: Engineering
Date: May 27, 2005
Project: C.A.T. 23RD FILING (19TH FILING SECOND REPLAT) #53-851313
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
May 25, 2005
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 4 Created: 5/24/2005
[5/24/05] As part of the replat, revised construction, site, and landscape plans are needed,
to be approved in conjunction with the plat.
Number: 13 Created: 5/27/2005
[5/27/05] Technical Services offers the following comments:
1) Boundary closes
2) Change Lot number of the replat from 4 to 1.
3) Vicinity Map needs work, shading and blurred text are not effective.
�s
D e
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
. Plat _� Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
City of Fort Collins
Current Planning
PROJECT
COMMENT SHEET
DATE: May 2, 2005 TO: Technical Services
PROJECT: #53-85BB C.A.T. 23rd Filing
(19th Filing Second Replat) Replat, Type I
All comments must be received by Ted Shepard no later than the staff
review meeting: J�W
May 25, 2005
Note - Please idend'fy your redlines for future reference
❑ No Problems
❑ Problems or Concerns (see below or attached)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
OPlat _Site Drainage Report _Other
_Utility Redline Utility Landscape
I&
City of Fort Collins