HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD FOURTH - Filed CS-COMMENT SHEETS - 2016-08-10Clty of Ft. Collins rove Plans A -)roved Bq G .te 1 North Star a*,,,, design 700 Automation Drive, Unit I Windsor, CO 80550 Phone:970-686-6939 Fax:970-686-1188 July 25, 2012 Glen Schlueter City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 RE: 2545 Research Blvd Expansion Dear Glen, The owners of the existing building at 2545 Research Boulevard at proposing to construct a 4600 square foot expansion on the northeast side of the building In order to construct this addition, the existing drive through lanes, canopy and access drive will be removed. It was calculated that approximately 11,500 square feet of imperviousness will be removed and approximately 7,000 square feet of imperviousness will be constructed resulting in a net reduction of imperviousness on site of 4,500 square feet. Because a reduction in imperviousness is anticipated, no further drainage calculations have been completed and no additional detention will be provided. The majority of the runoff from this building will discharge onto the landscaped area and flow to the existing on site storm or to the existing street. This flow through the landscaping will provide some level of water quality enhancement for this runoff. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. MA120065 2545 Research Blvd July 6, 2012 Comments on utility plans: The two following notes need to be added to the overall utility plan sheet: • Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. • Damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. The limits of the repairs will be identified in the field by the City Engineering Inspector prior to and over the course of the project and will not be shown on the plans. Detail 1601 also needs to be added to the plans. By: Sheri Langenberger