HomeMy WebLinkAboutPROSPECT STATION SUBDIVISION SECOND FILING - Filed DCP-DEV. CONSTRUCTION PERMIT - 2016-07-29City of
Fort Collins
�Engi�neering�-
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 16-23 Issuance Date: 712812016
Project Name: Prospect Station II
Project Location: 303 West Prospect Rd
Permittee: Brian Pearson, Dohn Construction
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees:
Permit Application Fee (BMISC160586) $ 400.00
Excavation Permit $ 133.00
Construction Inspection Fee $ 1045.00
Total $ 1,578.00
Note: the above amounts may not include any street cut fees which may be required to be paid by
separate permit.
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 26,226.00
Form of security deposited with the City: Check #1207
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the
terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in
Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report,, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code
or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is
applicable, are met. If the Development Agreement does not specify times for completion of
public improvements, or if there is no Development Agreement, then the improvement
requirements specified in Section 24-95 of the City Code shall apply, which provides that
construction of all improvements shall be required prior to the time of issuance of the first
building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and
the "as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: N/A
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority
of the owners of the property (including all owners having legal or equitable interest in the real
property, as defined in Section 1-2 of the City Code; and including common areas legally connected
to or associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I
hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to
enter upon such property to perform work required of the applicant if the applicant were to fail to
perform the required work. I also acknowledge that I have read this permit document with all its
requirements and conditions, and I agree to all of the terms and conditions so stated in this
permit.
Applicant/Project Manager' s Signature: lop��Date: —7 i)n-1
Approval for issuance:
City Engineer Approval: t- Date: �" E0 - A10
(Permit Issuance Date)
r�.2�X
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
City Staff Contact Persons:
Development Engineer: Marc Ragasa
281 North College Avenue, Fort Collins, CO 80524
970 221-6603
Construction Inspector: Steve Cicione
281 North College Avenue, Fort Collins, CO 80524
970 692-4418
Current Planner: Noah Beals
281 North College Avenue, Fort Collins, CO 80524
970 416-2313
Water Utilities Engineer: Shane Boyle
700 Wood Street, Fort Collins, CO 80521
970 221-6339
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
970 218-2932
Natural Resources: Rebecca Everette
281 North College Avenue, Fort Collins, CO 80524
970 416-2625
Traffic Operations: Joe Olson
626 Linden Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Forestry: Tim Buchanan
215 N Mason Street, Fort Collins, CO 80524
970 221-6641
Light and Power: Janet McTague
700 Wood Street, Fort Collins, CO 80521
970 224-6154
Developer' Contact Persons:
Project Manager: Brian Pearson, Dohn Construction, Inc.
2642 Midpoint Drive, Fort Collins, CO 80525
Mobile: 970-379-2091
Office: 970-490-1855
Email: bpearsongdohnconstruction.com
Developer: Prospect Station, LLC
2642 Midpoint Drive, Fort Collins, CO 80525
Mobile: 970-490-1855
Office: 970-490-1855
Email: cdohngdohnconstruction.com
Owner(s): Prospect Station, LLC
2642 Midpoint Drive, Fort Collins, CO 80525
Mobile: 970-490-1855
Office: 970-490-1855
Email: cdohngdohnconstruction.com
Architect/Planner: Ian Shuff
Almas
712 Whalers Way, Bldg B, Suite 100, Fort Collins, CO 80525
Office: 970-223-1820
Email: ishuffgalmas.com
Project Engineer: Mike Oberlander
Interwest Consulting Group
1218 Ash Street, Suite A, Windsor, CO 80550
Office: 970-674-3300
Email: moberlanderginterwestgrrp.com
Professional License Number: 34288
General Contractor: Brian Pearson
Dohn Construction, Inc.
2642 Midpoint Drive, Fort Collins, CO 80525
Mobile: 970-379-2091
Office: 970-490-1855
Email: bpearsongdohnconstruction.com
O o 0 0 0 0
000000
O O o 0 0 0 0 0 0 0 0 0 0
oao-O00000000
0 0 0 0 0 0
000000
0 0 0 0
000o
ca
O CD CD CD0
69 69 64 69609.
0 0.0 O O O O O L n CDLn L O
69 1- U) 69 69 69.M W M M
O N 00 O O O
FA I.-� 69 fR
O M CD O
M O 69 696964
69
O
N
fA 69 W G.,69
69
69 tf) 69
H
N
W
O
=
O
L)
W
o
z
J
a w
w
m
rn
U.
O
000000
1l1�N O oo
000000000000o
pl:r pl�r O O O O o 00oO
LC) 000LnLn
V 000 V: V
Lo0
V O �. ,I
z
J
`
`
0007 vi M ch
69 69 fA 69 O_ O
OOOOOO M OOOOo to
69 69 69 1R r r- O r- r M M M M
O co
fR 69 6fA 69
9 69
0 0 :,' .'
EH 1 n (b
7 ",
J_
Z 2p-
69 fl9
V3 M ze 69 EA 69 EA 60 6q
6ri
On w U
vw>x
w
LU IL
IL
i
u'
Z LL
> v
000000
o00000
0000000000000
0000000000000
oO00000
0000000
0o
0o
O
x y
a
w
C o C C O C
d9 fA fA M fR Y!
o O O o O o o o o O O o o
fA NS 6% fA 00 to 69 (H 69 M 64 6% O
O 0 O t0 0 0 0
W. fH O Cl) o Yi W%
0 0
a fA
F
Q
1-
LO
M 13 LO
N
w
>
�g�►-
LW1.
a z
x O
y
y
OWZV
W F
W U
w
{U
o o O o O O
000000
o 0 0 0 0 0 0 0 0 0 0 0 o
0000000000000
O o 0 0 0 0 0
0000000
o o
00
0 a
O m
x
W F
o 0 0 0 0 O
69 Vf 69 6H 69 69
O O O O o 0 0 C 0 0 0 0 0
69 69 6H 69 00 69 69 44 (Al 69 69 O
G O O (V 0 0 0
to f9 6464 Cl) ", :R V)
C O
st 69
fffA
2 Z
O Z
7_
Q }
m
Lo
f
fH
W J
w
W ym
>
3
w
w
N
z V C1
V Q V
0
O 'U^! �;
;lY
O Q
W
F z
W
w Z
0
W y
z
} W
-
J x
W
QF�O
z
w
O N
W Cy
o wa
Z
LL�
y$ O
U
o
HZNW
i-
LL LL LL LLU
Li- LLU?}:
. }
uj }QlL
n W0
?OLLLL
JJUa
I WQWWW
n
UO ?
W.m
z0 W
�v
m
w
J
E
m
W Q
m
L)•.>
�F-w V
o
U1U V?
d
y
IL Prn
Cl)_
az
d
d y
w~ax
_
i2
a cn
3 -' ° o
a
wgcxi�
0
Q>
N y N
U
to C C V
Y
LL m
o LL w w
F
J
>>
"
Z 0)
Lo a
€ u�
R?KJ
<�
z m a
CO O
2 v U) J ~ C O
E � R
d ap'
i Q u~i J
F
Oaf
y
dU 2C75w-� a
c c
y jCf)
c E�
WOOa
w
aJF
c c
va `n��
m
c
°c_ min
a JC
a
Q
v) d0'� m
L d N O
.tl ��� in> �
L O N N
N rn�Or =
C_ E atS N
° m 0)
! U E E
W
> U
N
O
U F>
V) y
E a r„ �, � L
•� m- R
.� �' � c c> D K
m m m d
�� �� f0 v� N
'- m d
u a> L ��
o m o
K F z y
a «
cam°
p y o
ww L)
m m m
3cn33��i,,�»�iiiL�
d a°
inC�aUoa¢U
x o. m
w¢aaaN
?« .
IL