February 14, 2014
Jason Goode
Faurot Construction
4439 N. Broadway, Suite G
Boulder, CO 80304
RE: Global Village Academy Site Plan Advisory Review, SPA130007, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard .fcgov.com
Topic: General
Comment Number: 12 Comment Originated: 02/14/2014
02/14/2014: Please consider adding a row of foundation shrubs along the north elevation of the
building. The north elevation has significant exposure to Taft Hill Road and a row of shrubs will
help soften the building.
A row of foundation shrubs has been considered along the north elevation of the building.
This area is in the future development zone and adding shrubs would not be a permanent
solution, so no shrubs have been added at this time.
Comment Number: 13 Comment Originated: 02/14/2014
02/14/2014: Please see redline comments on the Landscape Plan to improve readability.
Landscape plan has been amended to improve readability per redline comments.
Comment Number: 14 Comment Originated: 02/14/2014
02/14/2014: For the next round, please include the Site Plan for reference.
Drawing is included.
Comment Number: 15 Comment Originated: 02/05/2014
02/05/2014: Please change the future right of way line to a solid line. See redlines.
Plat has been removed from the utility plan set.
Comment Number: 16 Comment Originated: 02/05/2014
02/05/2014: Please provide current acceptable monument records for the aliquot corners
shown. Please email these directly to Jeff County at icounty .fcgov.com.
Plat has been removed from the utility plan set.
Comment Number: 17 Comment Originated: 02/05/2014
02/05/2014: Please make changes/additions to the legend as marked. See redlines.
Plat has been removed from the utility plan set.
Topic: Site Plan
Comment Number: 2
02/05/2014: This was not routed to us for review.
Site Plan is included in this submittal
12/13/2013: Please add a scale with scale bar to sheet A-1.
Scale bar has been added to sheet A-1
Comment Originated: 12/13/2013
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221-6854, rbuffington(aD-fcpov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 02/04/2014
02/04/2014: Add two gate valves as shown on redlined plans.
Gate valves have been added.
Comment Number: 3 Comment Originated: 02/04/2014
02/04/2014: Revise the labels on the connection to the existing water main on Silver Trails as
noted on the redlined plans.
Labels have been revised at water line connection per redlines.
Comment Number: 4
02/04/2014: Irrigation taps?
Comment Originated: 02/04/2014
Irritation system is being fed from domestic tap during this phase of the project.
Comment Number: 5
02/04/2014: See redlined plans for other comments.
Comment Originated: 02/04/2014
All redlines have been addressed.
Topic: Plat
Comment Number: 6
Comment Originated: 02/04/2014
02/04/2014: The easement extending south from Bronson for the water main and sanitary
sewer must be 35 feet wide. (15 feet on each side of the sewer and 10 feet on each side of the
water)
Plat has been removed from the utility plan set. However easement width has been revised to 35-feet as
requested.
.I
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Via Fort Collins, CO 80522
970.221.6760
970.224.6134 - fax
fcgov.comidevetopmentreview
December 18, 2013
Jason Goode
Faurot Construction
4439 N. Broadway, Suite G
Boulder, CO 80304
RE: Global Village Academy Site Plan Advisory Review, SPA130007, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tsheoardQfcoov.com
Topic: General
Comment Number: 1
Comment Originated: 12/14/2013
12/14/2013: Street trees must be provided along all public streets, not just along Taft Hill Road.
Please revise the Landscape Plan to include deciduous shade trees in the parkway along both Taft
Hill and Horsetooth and behind the attached walks along Bronson and Silver Trails. Street trees are
considered to be an important public improvement just like public sidewalks. An ornamental tree may
be substituted if within 40 feet of public street light. Ornamental trees may be planted up to within 15
feet of a street light. If needed, we can provide a list of approved street trees from the City Forester.
Upon establishment, the long term maintenance of these trees will be the responsibility of the City
Forestry Department.
Comment Number: 2
Comment Originated: 12/14/2013
12/14/2013: Please amend the Design Statement on the Landscape Plan to read as follows: Lit is the
intent of the school that as the property is developed in phases with private improvements, compliant
landscaping will be added on a per phase basis.L
The purpose of revising this note is to clarify that the landscaping associated with the public
improvements — street trees, are to be installed with the first phase and not future phases. Only private
improvements can be phased over time.
Page 1 of 6
Comment Number: 3 Comment Originated: 12/14/2013
12/14/2013: Staff' recommends that the area on the north side of the driveway that intersects with Silver
Trails Drive, be landscaped with more than just seed as this driveway adjoins the southerly attached
dwelling. Please consider installing a mix of shade and evergreen trees to mitigate the impact of this
driveway in relationship to the adjoining dwelling unit.
Comment Number: 4 Comment Originated: 12/14/2013
12114/2013: On the Site Plan, please consider either adding more bike racks or provide a note that
states bike racks will be added on an as needed basis.
Comment Number: 5
Comment Originated: 12/14/2013
12/14/2013: On the Site Plan, please label the pre-school fence, concrete walkways, concrete bus
stop, and the surface material of the temporary emergency access. Also, please add a north arrow
and scale.
Comment Number: 6
Comment Originated: 12/14/2013
12/14/2013: The trash enclosure must be sized to accommodate not only a dumpster but properly
sized containers for recyclable materials. The Site Plan must indicate that this enclosure will be solid,
six foot high, with metal gate.
Comment Number: 7
Comment Originated: 12/14/2013
12/14/2013: The roof -mounted H.U.C. equipment must be screened from public view. Since there
appear to be numerous pieces of equipment, perhaps the best method to accomplish the necessary
screening would be a parapet wall of sufficient height and length.
Comment Number: 6
Comment Originated: 12/14/2013
12/14/2013: On the architectural elevations, please consider adding a more solid base material to the
building to balance out the heavy reliance on metal as the primary exterior material. Staff suggests that
the overall quality and appearance of the building would be improved by adding a base of split -face or
textured c.m.u., integrally colored, at a height of four feet between windows and two feet at the
windows.
Comment Number:
Comment Originated: 12/14/2013
12/14/2013: Staff recommends that heat gain could be minimized along the south elevation by adding
projecting window screens that would still allow for light but reduce the solar gain during the warmer
months.
Comment Number: 10
Comment Originated: 12/14/2013
12/14/2013: Please consider adding another suspended wood canopy to the easterly door to match
the westerly door. The eastern door appears to feature minimal treatment and yet is highly visible to
the two arterial streets. The southeast comer of the building, in general, will be area where the first
impression of the school will be created by its proximity to the intersection.
Comment Number: 11
Comment Originated: 12/14/2013
12/14/2013: Staff recommends that the vibrancy of the yellow color be reduced or subdued or
replaced by a more muted earth -tone color. The 5-acres site benefits from being close to the
hogbacks that form the western back drop of our City. This back drop has been preserved with a
series of public parks and open spaces and provides a naturalistic setting for southwest Fort Collins.
Horsetooth Road is the access to Spring Canyon Park, out newest and largest community park that is
often referred to as our "crown jewel" of the City's park system. Toning down the brightness of the
yellow would allow the building to be more sympathetic and compatible with the foothills context of the
surrounding area.
Department: Engineering Development Review
Page 2 of 6
r. .
Contact: Tyler Siegmund, 970-221-6501, taieamundMcaov.com
Topic: General
Comment Number: 1 Comment Originated: 12/18/2013
12/18/2013: The 3 existing handicap ramps adjacent to the property do not meet current ADA
standards (SW comer of Bronson/Taft, NW comer of Horsetooth/Taft, and NE corner of
Horsetooth/Silver Trails Dr). With development, handicap ramps will need to be brought up to current
ADA standards with truncated dome warning detection. See redlines. Please update the site plan with
the new handicap ramp configuration on all 3 comers adjacent to the site.
Comment Number: 2 Comment Originated: 12/18/2013
12/18/2013: The new sidewalk along Taft Hill needs to be 6ft wide to meet minimum arterial street
standards. Please place the back of sidewalk at the new right-of-way line. See redlines
At
r
Comment Number: 3 Comment Originated: 12/18/2013
12/18/2013: A 15ft utility easement ne to be dedicated along Taft Hill to meet current minimum
arterial street standards. Currently a 0 tility easement is being proposed. The 15ft utility easement
requirement may be reduced in size if not pursued by the utility providers. Further coordination with
the utility providers is needed to accept a 10ft utility easement at this location
Comment Number:
Comment Originated: 12/18/2013
12il8/2013: The north access point off of Bronson St needs to shift to the east to align with Silver Oaks
Dr and minimize the impacts to the property to the west. As currently designed, the property to the
east will lose their on street parking space in front of their house.
Comment Number: 5
Comment Originated: 12/18/2013
12/18/2013: Can the west access point off of Silver Trails Dr shift to south approximately 20ft into the
field? This will better align the interior drive lanes and also improve the location of the access point on
Silver Trails Dr. Currently the exit point is aligned with the front window of the property to the west. By
shifting the alignment to the south, vehicles exiting will be in line with the garage and not the front
window of the property.
Comment Number: 6
Comment Originated: 12/18/2013
1211812013: A traffic impact study has not been received as part of this submittal. Additional
improvements or comments may follow after review of the TIS.
Comment Number: 7 Comment Originated: 12/18/2013
12118/2013: Please add the following note to the site plan:
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be
replaced or restored to City of Fort Collins standards at the Developer's expense prior to the
acceptance of completed improvements.
Comment Number: 8
Comment Originated: 12/18/2013
12/18/2013: Utility plans, right-of-way dedication documents and utility easement dedication
documents were not received as part of this submittal.
Comment Number: 9
Comment Originated: 12/18/2013
12/18/2013: Please label the property line as "existing property line". See redlines
Comment Number: 10 1Comment Originated: 12/18/2013
12/18/2013: Please label the right of way note as "Additional right-of-way to be dedicated.
Department: Environmental Planning 1641 �J MY W
Page 3of6 5010
( rf� AWA
I Contact: Lindsay Ex, 970-224-6143, IexMcaov.com
Topic: General
Comment Number: 1 Comment Originated: 12/11/2013
12/11/2013: It would be helpful to have the proposed seed mix for our review. Thanks.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, ririshMcaov.com
Topic: General
Comment Number: 1 Comment Originated: 12/17/2013
12/17/2013: Light & Power has existing 3-phase power available along the North side of Horsetooth
Rd. adjacent to this site. Note, this line may be in the roadway. Any modification or relocation of
existing electric facilities will be at the owners expense.
Comment Number: 2 Comment Originated: 12/17/2013
12/1712013: Coordinate power requirements and transformer location with Light & Power Engineering
@ 970-221-6700. Transformer location must be within 10' of a paved surface accessible by a
line -truck.
Comment Number: 3 Comment Originated: 12/17/2013
12/17/2013: Please submit a C-1 Form and a One -line diagram to Light & Power Engineering.
Comment Number: 4 Comment Originated: 12/17/2013
12/17/2013: Along the East side of Taft Hill Road there are existing streetlights at Bronson/Taft and at
Horsetooth(raft with one mid block streetlight between Horsetooth and Bronson. With this
development there may be a need for two additional streetlights adjacent to this site along Taft Hill Rd
staggering the existing lights. On your landscape plan please provide a minimum of 40' of clearance
from shade trees and 15' clearance from ornamentals.
Comment Number: 5 Comment Originated: 12/17/2013
12/17/2013: Owner will be responsible for Electric Capacity Fee, Building Site charges and system
modification charges where applicable.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilvnxwiler�poudre-iire.oro
Topic: General
Comment Number: 1 Comment Originated: 12/17/2013
12/17/2013: PFA has no comments related to the SPA. Some outstanding comments remain for the
PDR.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218.2932, lschlamtt'0fcoov.com
Topic: Erosion Control
Page 4 of 6
Comment Number: 1 Comment Originated: 12/17/2013
12/17/2013: After a quick review of the Landscape plan for temporary and permanent seeding, it was
noted that the plan was a bit confusing with the Key versus In Plan Notes (i.e. hatch work showed
Temporary seeding but notes called out for Permanent seeding and vice -versa) Also, a seed mix
showing the Pure Live Seed ratio would be recommended either on the landscape plan or later in the
erosion control plan. If you need clarification concerning this, or if there are any questions please
contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970416-2418, wiamaraueNcoov.com
Topic: General
Comment Number: 2 Comment Originated: 12/18/2013
12/18/2013: Please submit utility plans and a drainage study for review.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icountv@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/13/2013
12/1312013: There are line over text issues on sheets L-1 & L-2. See redlines.
Topic: Site Plan
Comment Number: 2 Comment Originated: 12/13/2013
12/13/2013: Please add a scale with scale bar to sheet A-1.
Department: Traffic Operation
Contact: Ward Stanford, 970-221.6820, Istanford0fegov.com
Topic: General
Comment Number: 3 Comment Originated: 12/13/2013
12/13/2013: Traffic Op's has concerns for traffic congestion possibility at the area intersections and
streets due to operating hours matching or closely matching Olanders schedule.
Comment Number: 4 Comment Originated: 12/13/2013
12/13/2013: Traffic would like to see an onsite circulation plan.
Topic: Site Plan
Page 5 of 6
Comment Number: 2
Comment Originated: 12/13/2013
12/13/2013: Traffic would suggest the following circulation plan during dropoff/pickup periods: Two
way traffic on N/S access drive; East bound (inbound) only on the access from Silver Trails; East
bound only traffic must turn right (south) at internal intersection and head south to south side of parking
lot; counterclock-wise flow around parking area; west bound circulating (exiting) traffic must turn right
onto N/S access drive. This circulation pattern will eliminate the need of motor vehicles having to cross
paths at the internal intersection. This will aid in moving traffic more fluidly and controlled with fewer
conflict points and directions motorists, peds and cyclists will have to keep track of at the internal
intersection. It allows for safer pedlbike crossing the lanes at the internal intersection. Overall should
produce a more controlled and smooth flow on the internal drives. The only negative is less on -site
stacking of the east bound (inbound) traffic from Silver Trails, but the smoother flow and possibly
easier merging at the internal intersection may help lessen the volume of queued traffic on the east
bound (inbound) access from Silver Trails. That should in -turn aid in reducing queued traffic on Silver
Trails trying to get to the school.
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 12/13/2013
12/13/2013: Understanding the 2 step process, but still need to state for the record that a TIS has not
been received or reviewed with this submittal, but is being requested.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbutfinatonMenov.com
Topic: General
Comment Number: 1 Comment Originated: 12/17/2013
12/17/2013: No comments on the site and landscape plans.
Department: Zoning
Contact: Peter Barnes, 970416.2355, abarnesMcaov.com
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 12/10/2013
12110/2013: Section 3.2.1 of the Land Use Code requires that at least 6% of the interior of a parking lot
shall be in landscape islands. The proposed parking lot contains no interior landscaping. The
applicant should consider adding landscape islands in the parking lot.
Topic: Site Plan
Comment Number: 1
Comment Originated: 12/09/2013
12/09/2013: The parking stall and drive aisle dimensions should be shown on the plan. It would also
be helpful if the building footprint dimensions and setback distances to lot lines are shown.
Comment Number: 2
Comment Originated: 12/10/2013
12110/2013: Section 3.5.3 of the Land Use Code establishes a'build-to-line' standard which requires
buildings to be built up to the street (between 10' and 25' from the ROW line of Horsetooth and S. Taft
Hill), and at comer lots, the building is to be built to at least 2 of the streets. This results in no parking
lots being located between the building and a street. The applicant should consider locating the
building on the site to comply with the build -to -line standard, or at least locate the parking lot so that it
is not between the building and a street.
Page 6 of 6
Comment Number: 15
Comment Originated: 02/14/2014
02/14/2014: On the Lighting Plan, please delete the A-1 and A-2 fixtures from the Luminaire
Schedule as these fixtures are not indicated on the photometric plan. Also, please add a
quantity column.
Drawings have been revised
Department: Engineering Development Review
Contact: Tyler Siegmund, 970.221.6501, tsiegmund(cD-fcaov.com
Topic: Construction Drawings
Comment Number: 14 Comment Originated: 02/07/2014
02/07/2014: Please revise General note #5 and #34 on Sheet C001:
Note 5 should read- "All sanitary sewer, storm sewer, and water line construction, as well as
power..."
Note 34 needs to reference "approval by the City of Fort Collins"
Notes have been revised.
Comment Number: 15
Comment Originated: 02/07/2014
02/07/2014: There is reverse drainage in the drive approach off of Bronson in front of the
eastern handicap ramp. Please revise. See Grading plan redlines (sheet C400)
Grading has been revised.
Comment Number: 16
Comment Originated: 02/07/2014
02/07/2014: The handicap ramp alignment at Bronson and Taft Hill needs to shift to the west
and be constructed as a directional ramp. Please revise the proposed sidewalk. See
redlines
Drawings have been revised accordingly.
Comment Number: 17 Comment Originated: 02/07/2014
02/07/2014: The handicap ramp at Horsetooth and Silver Trails needs to shift to the north and
be constructed as a directional ramp. Please revise the sidewalk to bend around the electrical
vault to the north. See redlines
Drawings have been revised accordingly.
Comment Number: 18 Comment Originated: 02/07/2014
02/07/2014: Please add the standard sidewalk note to the Utility Plan (sheet C3)
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy
Note has been added.
Comment Number: 19 Comment Originated: 02/07/2014
02/07/2014: Add the City signature block to the Construction Details sheet (sheet C600)
City signature block has been added to Detail Sheets.
Comment Number: 20 Comment Originated: 02/07/2014
02/07/2014: Please add the standard patching note to the Utility Plan (sheet C3)
Limits of street cut are approximate. Final limits are to be determined in the field by the City of
Fort Collins Engineering Inspector. All repairs to be in accordance with city street repair
standards.
Note has been added.
Comment Number: 21 Comment Originated: 02/07/2014
02/07/2014: Please add the following LCUASS details to the Utility plan set:
701- Vert curb/gutter detail
702- drive over curb/gutter detail
1606- directional handicap ramp detail
1606(a)- directional handicap ramp detail
Details have been added.
Topic: Plat
Comment Number: 11 Comment Originated: 02/07/2014
02/07/2014: Please update the Statement of Ownership and Subdivision note to reference
Global Village Academy (the "Developer") See plat redlines
Plat has been removed from the utility plan set.
Comment Number: 12 Comment Originated: 02/07/2014
02/07/2014: Please add the following note to the plat:
There shall be no private conditions, covenants or restrictions that prohibit or limit the
installation of resource conserving equipment or landscaping that are allowed by Sections
12-120-12-122 of the City Code.
Plat has been removed from the utility plan set.
Comment Number: 13
Comment Originated: 02/07/2014
02/07/2014: A pedestrian access easement is needed where the public sidewalk extends onto
private property just east of the Silver Trails Dr/Horsetooth Rd intersection. See plat and utility
plan (sheet C300) redlines
Public sidewalk alignment has been revised therefore an access easement is no longer required.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex(cD-fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/11/2013
01/30/2014: Please remove crested wheatgrass from your seed mix -it is a species that
invades and outcompetes other native species. Western Wheatgrass would be an excellent
substitution.
Crested Wheatgrass has been removed from the seed mix and replaced with Western Wheatgrass.
12/11 /2013: It would be helpful to have the proposed seed mix for our review. Thanks.
Proposed seed mix is located on Sheet L-2.
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchanan(a)_fcgov.com
Topic: Landscape Plans
Comment Number: 2
Comment Originated: 12/18/2013
12/18/2013:
Check street tree location so as to meet the LUC tree separation standard s (LUC 3.2.1.K)
Show locations for street lights, stop signs or signals, water and sewer service and main lines
and driveways and provide for the following separations.
20 feet from signs
40 feet from street lights for shade trees and 20 for ornamental trees
8 feet from driveways
10 feet from water and sewer mains
6 feet from water and sewer service lines
4 feet from gas lines
Separation standards for street trees vs street lights, stop signs, water and sewer service and mainlines,
and driveways have been met. Street light locations (per city of Fort Collins) have been located on
the landscape plan. A note with the separations has been added to the plan for field verification.
Comment Number: 5
Comment Originated: 12/18/2013
12/18/2013:
Review the Parking lot tree planting requirements in LUC 3.2.1 for adding of trees in and around
the parking lot area.
Parking lot tree plantings have not been added to the landscape plan at this time.
Comment Number: 6
Comment Originated: 12/18/2013
12/18/2013:
Review LUC 3.2.1 G General Standard and LUC 3.2.1 D Tree Planting Standard fro adding
additional trees to the project.
Additional trees have not been added to the landscape plan at this time.
Department: Light And Power
Contact: Rob Irish, 970.224-6167, rirish(c-fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/17/2013
01 /31 /2014:
12/17/2013: Light & Power has existing 3-phase power available along the North side of
Horsetooth Rd. adjacent to this site. Note, this line may be in the roadway. Any modification or
relocation of existing electric facilities will be at the owners expense.
Noted: We have contacted Doug Martine and have met him on site to discuss
Comment Number: 2
Comment Originated: 12/17/2013
01/31/2014:
12/17/2013: Coordinate power requirements and transformer location with Light & Power
Engineering @ 970-221-6700. Transformer location must be within 10' of a paved surface
accessible by a line -truck.
Boulder Engineering Response: The transformer location is within 10' of a paved surface that is accessible
by a line -truck.
Comment Number: 3
Comment Originated: 12/17/2013
01 /31 /2014:
12/17/2013: Please submit a C-1 Form and a One -line diagram to Light & Power Engineering.
One -line and CV-1 form are included
Comment Number: 4 Comment Originated: 12/17/2013
12/17/2013: Along the East side of Taft Hill Road there are existing streetlights at Bronson/Taft
and at Horsetooth/Taft with one mid -block streetlight between Horsetooth and Bronson. With
this development there may be a need for two additional streetlights adjacent to this site along
Taft Hill Rd staggering the existing lights. On your landscape plan please provide a minimum
of 40' of clearance from shade trees and 15' clearance from ornamentals.
Street lights have been located on the landscape plan per city of Ft. Collins direction.
Street trees have a clearance of 40' from these locations.
Comment Number: 5
01/31/2014:
Comment Originated: 12/17/2013
12/17/2013: Owner will be responsible for Electric Capacity Fee, Building Site charges and
system modification charges where applicable.
Noted: Please provide complete pricing for new electrical service at your earliest convenience.
Comment Number: 6
Comment Originated: 01/31/2014
01/31/2014: Transformer location looks to be fine. The routing of the electric primary to the
transformer shown on the plans may need to be adjusted do to many bends. Coordinate the
electric route with Light & Power Engineering.
Primary electric line alignment has been revised to minimize bends.
Department: PFA
Contact: Jim Lynxwiler, 970.416-2869, ilynxwiler0-poudre-fire.org
Topic: General
Comment Number: 1
Comment Originated: 12/17/2013
12/17/2013: Some outstanding comments remain for the PDR.
a) PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM - New buildings require a fire
department, emergency communication system evaluation after the core/shell but prior to final
build out. For the purposes of this section, fire walls shall not be used to define separate
buildings. Where adequate radio coverage cannot be established within a building,
public -safety radio amplification systems shall be designed and installed in accordance with
criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy
#07-01
We will schedule this inspection after drywall has been installed.
b) FDC - Fire Department Connections shall be installed in accordance with NFPA standards.
Fire department connections shall be fully visible and recognizable from the street or nearest
point of fire department vehicle access. The location of the FDC shall be approved by the fire
department.
Noted: FDC location will be submitted in sprinkler system permit for Fire Department review
c) All other PFA comments relative to the PDP may be deferred until building permit (e.g.
Fire Alarm, Sprinkler System, Commercial Kitchen Hoods, Knox Box, Premise Identification).
Noted
Comment Number: 2
Comment Originated: 02/03/2014
02/03/2014: EMERGENCY ACCESS EASEMENT
a) Turning radii of C-5 should be 25' rather than 15' as currently shown.
b) The fire lane shall be signed as per Appendix D, section D103.6 of the IFC with "NO
PARKING FIRE LANE."
c) The Temporary Fire Lane, along with the permanent fire lane, is required to be signed. It
shall be plowed and maintained as needed and kept otherwise unobstructed at all times.
Drawings have been revised accordingly.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, ischlam(M-fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 12/17/2013
01 /28/2014: Erosion Control Report and Escrow still needed. Erosion Control Plan had minor
redlines pertaining to Perimeter Protection on the SW side of the Site, Inlet protection on the to
be installed inlets, and the addition of a sequence chart. If you need clarification concerning
this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Revised Erosion Control Plan and Escrow Estimate have been submitted and approved by Jesse.
Erosion Control Report has been submitted.
12/17/2013: After a quick review of the Landscape plan for temporary and permanent seeding,
it was noted that the plan was a bit confusing with the Key versus In Plan Notes (i.e. hatch work
showed Temporary seeding but notes called out for Permanent seeding and vice -versa) Also,
a seed mix showing the Pure Live Seed ratio would be recommended either on the landscape
plan or later in the erosion control plan. If you need clarification concerning this, or if there are
any questions please contact Jesse Schlam 970-218-2932 or email @ ischlam(cD-fcgov.com
Landscape plan has been amended to clarify the permanent vs. the temporary seed areas.
PLS ratio has been added to the seed mix on Sheet L-2.
Contact: Wes Lamarque, 970-416.2418, wlamargue(Mcgov.com
Topic: General
Comment Number: 3 Comment Originated: 02/04/2014
02/04/2014: The detention pond slopes are a little steeper than 4:1. Please revise.
Detention pond embankment slopes have been revised.
Comment Number: 4 Comment Originated: 02/04/2014
02/04/2014: The City would like to explore the possibility of using part of the site for regional
water quality mitigation. The contact for this request is Mark Kempton at 970-416-2233.
The City is no longer pursuing regional pond detention for this site per Mark Kempton.
Comment Number: 5
Comment Originated: 02/04/2014
02/04/2014: The City would like a meeting to discuss options for the LID requirements. The
City is OK with delaying the porous pavers until phase 2. The meeting would focus on the 50%
site area draining into an infiltration system requirement.
A concrete forebay has been added to each pond in addition to the proposed PLD system at the bottom of
each pond per meeting with the City Stormwater and Water Quality Departments.
Department: Technical Services
Contact: Jeff County, 970.221.6588, icounty �fcgov.com
Topic: Construction Drawings
Comment Number: 3
Comment Originated: 02/05/2014
02/05/2014: Please add benchmarks from the City of Fort Collins Vertical Control Network. The
benchmarks shown on sheets C000 & C001 are not City benchmarks.
Revised benchmarks have been added.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/13/2013
02/05/2014: There are still line over text issues on sheet L-2. Please mask all marked
symbols. See redlines.
All marked symbols have been masked on the landscape plan.
12/13/2013: There are line over text issues on sheets L-1 & L-2. See redlines.
Line over text issues on sheets L-1 and L-2 have been corrected.
Comment Number: 4 Comment Originated: 02/05/2014
02/05/2014: Please mask the City Forester note on sheet L-1. See redlines.
City Forester note on Sheet L-1 has been masked.
Comment Number: 5 Comment Originated: 02/05/2014
02/05/2014: Irrigation Plans: The title block on sheets IR-1 & IR-2 are cut off.
Title block on sheets IR-1 and -2 have been correctly placed in the drawings.
Topic: Plat
Comment Number: 6 Comment Originated: 02/05/2014
02/05/2014: Please add "County Of Larimer" to the sub -title. See redlines.
Plat has been removed from the utility plan set.
Comment Number: 7 Comment Originated: 02/05/2014
02/05/2014: Please add "Academy" to the Statement Of Ownership And Subdivision. See
redlines.
Plat has been removed from the utility plan set.
Comment Number: 8 Comment Originated: 02/05/2014
02/05/2014: Please label all dedication information for all streets shown. See redlines.
Plat has been removed from the utility plan set.
Comment Number: 9
Comment Originated: 02/05/2014
02/05/2014: Please label all lines & curves. There are several that are marked, but not this is
not necessarily all of them. See redlines.
Plat has been removed from the utility plan set.
Comment Number: 10 Comment Originated: 02/05/2014
02/05/2014: Please define the easements more clearly. It is unclear where some stop, and if
they overlap other easements. See redlines.
Plat has been removed from the utility plan set.
Comment Number: 11 Comment Originated: 02/05/2014
02/05/2014: Please move the bearings & distances around as marked. See redlines.
Plat has been removed from the utility plan set.
Comment Number: 12 Comment Originated: 02/05/2014
02/05/2014: All easements must be labeled and locatable. See redlines.
Plat has been removed from the utility plan set.
Comment Number: 13 Comment Originated: 02/05/2014
02/05/2014: If the Temporary Emergency Access Easement is temporary, what triggers
vacation of the easement? Should this be permanent?
Plat has been removed from the utility plan set.
Comment Number: 14 Comment Originated: 02/05/2014
02/05/2014: Is Reception # 89023905 the only source for right of way for Taft Hill Road &
Horsetooth Road?
Plat has been removed from the utility plan set.