RE: New Belgium Brewing Medical Clinic, MA150102, Round Number 1
Community Developmentand
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/deve/C)pmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Ali van
Deutekom, at 970-416-2743 or avandeutekom@fcgov.com.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slagge_nberger fcgov=om
Topic: General
Comment Number: 1
Comment Originated: 12/08/2015
12/08/2015: An easement vacation request needs to be submitted since the
proposed building is located within a drainage easement. The $400 TDRF for the
vacation needs to be paid and a legal description provided to start this process.
An easement vacation has been prepared and submitted.
Comment Number: 2 Comment Originated: 12/08/2015
12/08/2015: The area proposed to be vacated needs to be shown on the plans.
The vacated area has been added to the plans.
Comment Number: 3
Comment Originated: 12/08/2015
12/08/2015: Triple street cut fees will apply for the utility cut in the recently
constructed roadway.
Noted.
Comment Number: 4
Comment Originated: 12/08/2015
12/08/2015: The plans need to show the street as it exists (both sides). The curb,
gutter and sidewalk need to be shown as it exits. This has all been built and
accepted and needs to be shown as existing. The patching that is shown on the
plans extends further than shown since the roadway has been improved. Also note
that the curb, gutter and sidewalk along the north side is to be removed and
replaced.
A revised street plan has been added to the existing conditions.
Comment Number: 5 Comment Originated: 12/08/2015
12/08/2015: What type of curb is on the south side of Buckingham? Is it roll or
Hollywood? Whichever it is the curb detail for that type needs to be added to the
plans.
Page 1 of 5
Comment Number: 1
Comment Originated: 12/03/2015
01/07/2016: A label has been added to some plans for the Natural Habitat Buffer
Zone (NHBZ), but the area it is referencing is not clear. Please clearly delineate the
natural habitat buffer zone (with a heavier and/or dashed line) to indicate the area to
be protected (or restored if it will be disturbed). This should be labeled on all plans
that include the NHBZ.
A boundary/label has been added to the plans to indicate the NHBZ more clearly.
12/03/2015: The proposed location is adjacent to the area recently approved for the
wetland mitigation required for the office expansion and improvements to
Buckingham. Please label this area as a Natural Habitat Buffer Zone (NHBZ) on all
plans. Furthermore, the grading and seeding on the southeast side of this proposal
looks like it may encroach into the area approved for mitigation, which consists of
upland enhancements along Buckingham from 1st to 3rd Streets at a ratio of at
least 2:1 uplands created for wetlands lost. If so, please alter the grading to make it
more naturalistic and update the seed mix to be the same as what is being used in
the NHBZ, which is the Rocky Mountain Native Mix from the Arkansas Valley Seed
Company: http://www.ayseeds.com/bin/286.pdf
Comment Number: 2
Comment Originated: 12/03/2015
01/07/2016: Repeat comment. We have not seen a photometric plan for this
project. We will also need to see cut sheets for the light fixtures that are proposed.
In regard to LED light fixtures, please consider a warmer color temperature (closer
to 2700K) to reduce impacts to people and wildlife atnight.
Per Rebecca Everette's conversation, I have sent over the lighting plan and cut
sheets. No photometric plan required.
12/03/2015: In addition to labeling the NHBZ on the site, utility, and landscape plans,
please also provide a photometric plan. The City of Fort Collins Land Use Code, in
Article 3.2.4(D)(6) requires that "natural areas and natural features shall be
protected from light spillage from off site sources." Thus, lighting from the parking
areas or other site amenities shall not spill over to the bufferareas.
Contact: Rebecca Everette, 970-416-2625, reverette®fcgov.com
Topic: General
Comment Number: 4
Comment Originated: 01/07/2016
01/07/2016: The Natural Habitat Buffer Zone needs to be clearly delineated and/or
added to the following sheets:
- LS100
- LS101
- LP100
- C1
- C3-C6
- C8
A boundary/label has been added to the plans to indicate the NHBZ more clearly.
Comment Number: 5 Comment Originated: 01/07/2016
01/07/2016: Please add an Environmental Planner signature to all utility plans that
show the buffer zone (see comment 5 for relevant sheets).
The signature has been added to the sheets.
Comment Number: 6 Comment Originated: 01/07/2016
01/07/2016: Please add the following statement to the notes on any sheets that
show the Habitat Buffer: "Please see Section 3.4.1 of the Land Use Code for
allowable uses within the bufferzone."
The note has been added to the sheets.
Page 2 of 6
Comment Number: 7
Comment Originated: 01/07/2016
01/07/2016: Please add the following statement to the notes on any sheets that
show the Habitat Buffer: "The Natural Habitat Buffer Zone is meant to be maintained
in a native landscape."
The note has been added to the sheets.
This will help preserve the intention behind the buffer zones and the natural features
into the future, particularly if any disturbance and restoration occurs as part of this
project.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(�fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 12/08/2015
01/07/2016: COMMENTCONTINUED
12/08/2015:
Add this tree protection note that addresses tree transplanting.
Tree transplanting shall follow the recommendations of a qualified tree transplanting
contractor for method used for transplanting, size of equipment, time of year,
planting process and initial and on going irrigation.
The note has been added to the tree protection plan.
Comment Number: 2 Comment Originated: 12/08/2015
01/07/2016: COMMENT CONTINUED
12/08/2015:
Use the new Landscape notes that are available from the Planning Department.
The notes have been updated.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilvn,� x=filer noudre-fire.orn
Topic: General
Page 3 of 6
Comment Number: 1 Comment Originated: 12/07/2015
WATER SUPPLY COMMENT CARRIED FORWARD FROM LAST REVIEW
ROUND:
UPDATED COMMENT:
1/7/2015: WATER SUPPLY
The water supply requirement has been previously stated in prior reviews and the
response letter dated 12/8/2015 indicates, "A BFP on the existing facility is within
300' of the Medical Clinic and will provide fire water. Measurement is shown on
sheet C6." The measurement from building to hydrant shall be along an approved
path of vehicle travel, which is not necessarily in a straight line as indicated on the
plans. I believe this method of measurement was previously communicated to the
project team and I apologize if it was not made clear. My preliminary measurement
places the hydrant approximately 375' from the Medical Clinic. PFA will accept this
pre-existing, non -compliant condition, if the project team can verify there is an
access easement available between the hydrant and proposed Medical Clinic. This
comment is conditional on the matter of a fire lane being resolved (see comment #2;
below).
Farnsworth Group has had discussions with Mr. Lynxwiler concerning this issue.
New Belgium Brewing is committed to preparing an access easement and fire
lane. It is in the process of being completed. Although it is not completed at this
time, it will be completed prior to the City providing a Certificate of Occupancy for
the Medical Clinic. Therefore, we propose approval of the Minor Amendment
contingent on the easements being prepared and accepted by PFA.
ORIGINAL COMMENT:
12/07/2015: WATER SUPPLY
A fire hydrant is required within 300' of the Medical Clinic as measured along the
path of vehicle travel. Currently, the closest hydrant is on Buckingham Street,
immediately south of the new NBB Office Expansion and approximately 470'from
the medical clinic footprint. A hydrant will be required with the construction of the
building. Code language provided below.
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide
1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the
building, on 600-foot centers thereafter.
Page 4 of 6
Comment Number: 2 Comment Originated: 12/07/2015
FIRE LANE COMMENT CARRIED FORWARD FROM LAST REVIEWROUND:
UPDATED COMMENT:
1/7/2016: FIRE LANES
The fire lane requirement has been previously stated in prior reviews and the
response letter dated 12/8/2015 indicates, "Existing onsite fire lanes are within 150'
of the Medical Clinic; they have been labeled on the plans." A fire lane is labeled on a
2006 site plan and on the new Existing Conditions Plan (pg. Cl), however I'm not
able to find an access easement which corresponds with that labeling. I need the
project team's assistance in clarifying this condition and identifying theeasement
that provides for fire access.
See above response concerning fire lane easement.
ORIGINAL COMMENT:
12/07/2015: FIRE LANES
Fire access is required to within 150' of all exterior portions of the building perimeter.
Fire access from cannot be measured from Buckingham St. across a detention
pond. If an Emergency Access Easement has not already been provided on this
site, one will be required at this time or as an alternative, the Medical Clinic will need
to have a fire sprinkler system installed. Code language provided below.
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the jurisdiction.
The fire apparatus access road shall comply with the requirements of this section
and shall extend to within 150 feet of all portions of the facility and all portions ofthe
exterior walls of the first story of the building as measured by an approved route
around the exterior of the building or facility. When any portion of the facility or any
portion of an exterior wall of the first story of the building is located more than 150
feet from fire apparatus access, the fire code official is authorized to increase the
dimension if the building is equipped throughout with an approved, automatic
fire -sprinkler system.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen fcgov.com
Topic: Construction Drawings
Comment Number: 5
Comment Originated: 12/07/2015
01/07/2016: 1 % is seen to be the proposed slope. 2% is the minimum slope
permitted without adding a pan (either soft or concrete). Please revise accordingly.
Plan has been corrected.
12/07/2015: Please indicate the proposed slope for the regraded detention basin
bottom.
Comment Number: 8 Comment Originated: 12/07/2015
01/07/2016: Response acknowledged. Called out detail references sheet CD6
while detail is on CD7, please update.
Callout has been corrected.
12/07/2015: Please update the rain garden detail provided on Sheet CD7 to show
project -specific cross section depths. Also, please callout this detail on the rain
garden section shown on Sheet C5.
Topic: Floodplain
Page 5 of 6
Comment Number: 3 Comment Originated: 12/07/2015
01/08/2016: Per response from others, this comment is not seen on the site plan.
Please review and add.
The note has been added to the plans.
01/07/2016: Site plan not seen in received documents.
12/07/2015: Please add a note to the site plan to include, "This site is within the
Poudre River 500-year floodplain. At -risk population and essential service uses are
not allowed within this flood zone."
Contact: Jesse Schlam, 970-218-2932, 1schlamMcg9v.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/07/2015
01/05/2016: Repeat, never recieved changes to the erosion control plan.
12/07/2015: Erosion Control Plan has a need for a more effective BMP on the outlet
structure in the pond. Erosion Control Report and Escrow look to be acceptable. If
you need clarification concerning the erosion control section, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
See revised Drainage and Erosion Control Report.
Department: Technical Services
Contact: Jeff County, 970-221-6588, iGMIUMcgoy.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 12/07/2015
01/07/2016: There are line over text issues. See redlines.
The plans have been updated.
12/07/2015: There are line over text issues. See redlines.
Topic: Easements
Comment Number: 9 Comment Originated: 01/07/2016
01/07/2016: There are corrections to make. See redlines.
The plans have been updated.
Page 6 of 6
1F,j i- owe
MA150102 NB Medical Center January 7, 2016
An easement vacation request needs to be submitted since the proposed building is located within a
drainage easement. The $400 TDRF for the vacation needs to be paid and a legal description provided
to start this process. A legal was received and this will routed to Technical Services and Utilities for
review. Any comments will be forwarded on. To my knowledge the TDRFee has not been paid.
Details 702 and 1601 need to be added to the plans. Detail 1601 placed on the plans is the old detail.
The latest version dated 2/17/15 is the one that needs to be added to the plans.
Sheri Langenberger
From: Dan Mogen
Sent: Thursday, January 07, 2016 4:48 PM
To: Sheri Langenberger
Subject: RE: New Belgium drainage easement vacation
Yes, I'm ok with the easement vacation as it vacates for the building but leaves the area for the what will become the
modified detention basin and the rain garden for LID.
Thanks for double checking.
Dan Mogen, El, CFM
Development Review Engineer
Water Utilities Engineering
City of Fort Collins
(970)224-6192
dmosen@fceov.com
From: Sheri Langenberger
Sent: Thursday, January 07, 2016 4:22 PM
To: Dan Mogen
Subject: New Belgium drainage easement vacation
Dan
Just want to check with you and verify that stormwater is okay with the proposed easement vacation that has been
submitted as a part of the New Belgium Medical Center plans.
If so I will make sure that the easement vacation is ready to be filed before final mylars are signed. Please let me know if
you are okay with this proposed easement vacation.
Thanks
Sheri
Sheri Langenberger
Development Review Manager - Engineering
City of Fort Collins
(970)222-6573
A rollover curb detail has been added to the plans.
Comment Number: 6 Comment Originated: 12/08/2015
12/08/2015: Details 702 and 1601 need to be added to the plans.
Completed.
Department: Environmental Planning
Page 2 of 5
Comment Number: 2 Comment Originated: 12/07/2015
Contact: Kelly Kimple, 970-416-2401, kkimpleQfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/03/2015
12/03/2015: The proposed location is adjacent to the area recently approved for the
wetland mitigation required for the office expansion and improvements to
Buckingham. Please label this area as a Natural Habitat Buffer Zone (NHBZ) on all
plans. Furthermore, the grading and seeding on the southeast side of this proposal
looks like it may encroach into the area approved for mitigation, which consists of
upland enhancements along Buckingham from 1 st to 3rd Streets at a ratio of at
least 2:1 uplands created for wetlands lost. If so, please alter the grading to make it
more naturalistic and update the seed mix to be the same as what is being used in
the NHBZ, which is the Rocky Mountain Native Mix from the Arkansas Valley Seed
Company: hftp:/twww.ayseeds.com/bin/286.pdf
We have added labels to our plan to show approximately where the NHBZ location
is. Also, we have added another note to ensure that any disturbance to this area will
be restored to the original design that has recently been installed.
Comment Number: 2 Comment Originated: 12/03/2015
12/03/2015: In addition to labeling the NHBZ on the site, utility, and landscape plans,
please also provide a photometric plan. The City of Fort Collins Land Use Code, in
Article 3.2.4(D)(6) requires that "natural areas and natural features shall be
protected from light spillage from off site sources." Thus, lighting from the parking
areas or other site amenities shall not spill over to the bufferareas.
Comment Number: 3 Comment Originated: 12/03/2015
12/03/2015: Please consider using more of the same trees, shrubs, and forbs as
are being used in the NHBZ along Buckingham. I've been working with Mark Fischer
and Tom Hayes on these plans. Both Mark and Tom should be able to provide the
landscape plans for this area, which include Western Sandcherry and Golden
Current, as well as Bur and Chinkapin Oaks, Thornless CockspurHawthorn,
Regent Serviceberry, and Boulder Raspberry.
Noted. We have been in coordination with Mark and Tom from NBB, and we have
crossed -referenced the planting schedules for Buckingham Street to ensure an
overall cohesive site.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jjynxw ter poudre-fire.ora
Topic: General
Comment Number: 1 Comment Originated: 12/07/2015
12/07/2015: WATER SUPPLY
A fire hydrant is required within 300' of the Medical Clinic as measured along the
path of vehicle travel. Currently, the closest hydrant is on Buckingham Street,
immediately south of the new NBB Office Expansion and approximately 470'from
the medical clinic footprint. A hydrant will be required with the construction of the
building. Code language provided below.
A BFP on an existing facility is within 300' of the Medical Clinic and will provide fire
water. The measurement is shown on sheet C6.
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide
1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the
building, on 600-foot centers thereafter.
Existing onsite fire lanes are within 150' of the Medical
Clinic; they have been labeled on the plans.
12/07/2015: FIRE LANES
Fire access is required to within 150' of all exterior portions of the building perimeter.
Page 3 of 5
Comment Number: 2 Comment Originated: 12/07/2015
Fire access from cannot be measured from Buckingham St. across a detention
pond. If an Emergency Access Easement has not already been provided on this
site, one will be required at this time or as an alternative, the Medical Clinic will need
to have a fire sprinkler system installed. Code language provided below.
Noted.
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the jurisdiction.
The fire apparatus access road shall comply with the requirements of this section
and shall extend to within 150 feet of all portions of the facility and all portions ofthe
exterior walls of the first story of the building as measured by an approved route
around the exterior of the building or facility. When any portion of the facility or any
portion of an exterior wall of the first story of the building is located more than 150
feet from fire apparatus access, the fire code official is authorized to increase the
dimension if the building is equipped throughout with an approved, automatic
fire -sprinkler system.
Noted.
Comment Number: 3
Comment Originated: 12/07/2015
12/07/2015: OTHER COMMENTS
Other fire department comments may be needed at time of building permit.
Noted.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen fc9ov.com
Topic: Construction Drawings
Comment Number: 5
Comment Originated: 12/07/2015
12/07/2015: Please indicate the proposed slope for the regraded detention basin
bottom.
The slope is 1 %, this has been added to the plans.
Comment Number: 6 Comment Originated: 12/07/2015
12/07/2015: Please update Storm Drainage Note #2 on Sheet G1 asappropriate.
Completed
Comment Number: 7
Comment Originated: 12/07/2015
12/07/2015: Is riprap or another permanent erosion control BMP proposed for the
extended/relocated flared end sections daylighting into the detention basin?
Riprap has been added
Comment Number: 8
Comment Originated: 12/07/2015
12/07/2015: Please update the rain garden detail provided on Sheet CD7 to show
project -specific cross section depths. Also, please callout this detail on the rain
garden section shown on Sheet C5.
A callout has been provided on sheet C5. The depths shown on the detail are
relevant to this project.
Topic: Easements
Comment Number: 2
Comment Originated: 12/07/2015
12/07/2015: The proposed location for this building is in an existing easement.
Please vacate as necessary to allow for building.
An easement vacation has been completed and shown
on the plans.
Topic: Floodplain
Page 4 of 5
Comment Number: 2 Comment Originated: 12/07/2015
Comment Number: 3 Comment Originated: 12/07/2015
12/07/2015: Please add a note to the site plan to include, "This site is within the
Poudre River 500-year floodplain. At -risk population and essential service uses are
not allowed within this flood zone."
Completed
Page 5 of 5
Comment Number: 4 Comment Originated: 12/07/2015
12/07/2015: Please contact Mark Taylor at (970)416-2494 to discuss this facility
being located within the 500-year floodplain. There is some concern that it could
potentially be considered a critical -use facility, which would not be allowed in the
floodplain, so it is important that the City understand what services will be provided
at the facility.
Per discussion with Mark, the procedures to be conducted at the Medical Clinic do
not classify it as a critical facility.
Contact: Jesse Schlam, 970-218-2932, eachlam(&fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/07/2015
12/07/2015: Erosion Control Plan has a need for a more effective BMP on the outlet
structure in the pond. Erosion Control Report and Escrow look to be acceptable. If
you need clarification concerning the erosion control section, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
A sediment basin with rock checks has been added to capture sediment from
disturbed areas prior to reaching the outlet.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcoun jg?fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 12/07/2015
12/07/2015: This has been addressed.
Noted.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 12/07/2015
12/07/2015: There are line over text issues. See redlines.
The plans have been updated.
Comment Number: 3 Comment Originated: 12/07/2015
12/07/2015: There is text that needs to be rotated 180 degrees. See redlines.
The plans have been updated.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 12/07/2015
12/07/2015: The titles in the sheet index do not match the titles on the noted sheets.
See redlines.
The index/titles have been updated.
Topic: Site Plan
Comment Number: 5 Comment Originated: 12/07/2015
12/07/2015: Please change the "4th" in the legal description to "Fourth". See
redlines.
The plans have been updated.
Comment Number: 6 Comment Originated: 12/07/2015
12/07/2015: The titles in the sheet index do not match the titles on the noted sheets.
See redlines.
Page 6 of 5
Comment Number: 4 Comment Originated: 12/07/2015
The plans have been updated.
Comment Number: 7 Comment Originated: 12/07/2015
12/07/2015: There are line over text issues. See redlines.
The plans have been updated.
Comment Number: 8 Comment Originated: 12/07/2015
12/07/2015: There is text that needs to be rotated 180 degrees. See redlines.
Department: Water -Wastewater Engineering
Contact: Dan Mogen, , dmogen fcgov.com
Topic: Landscape Plans
Page 7 of 5
Comment Number: 1 Comment Originated: 12/07/2015
12/07/2015: Please show utilities on the landscape plan and verify landscape
separation requirements are met.
Utilities are shown on the overall planting plan.
Department: Zoning
Contact: All van Deutekom, 970-416-2743, avandeutekom®f_gov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/08/2015
12/08/2015: You may want to provide a few bike racks outside the medical clinic for
medical staff.
The client is not requesting a bike rack for this private facility.
Comment Number: 2 Comment Originated: 12/08/2015
12/08/2015: Is there a need for a trash enclosure?
Trash will be contained in the adjacent trash enclosure for the existing brewery.
Page 8 of 5
aty of
et Collins
January 12, 2016
Paul Mills
RUSSELL& MILLS STUDIOS
Fort Collins, CO 80524
RE: New Belgium Brewing Medical Clinic, MA150102, Round Number2
Community Developmentand
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 -fax
fcgov.com/d`eve/0pmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Ali van
Deutekom, at 970-416-2743 or avandeutekom@fcgov.com.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberaer fcgov.cem
Topic: General
Comment Number: 1 Comment Originated: 12/08/2015
1/7/16: A legal was received and this will routed to Technical Services and Utilities
for review. Any comments will be forwarded on. To my knowledge the TDRFee has
not been paid.
New Belgium Brewing will pay the TDR Fee of $400
12/08/2015: An easement vacation request needs to be submitted since the
proposed building is located within a drainage easement. The $400 TDRF for the
vacation needs to be paid and a legal description provided to start this process.
Comment Number: 6 Comment Originated: 12/08/2015
1/7/16:Detail 1601 placed on the plans is the old detail. The latest version dated
2/17/15 is the one that needs to be added to the plans.
These details have been added to the plan set. See Utility Plans for New Belgium
Brewing Medical Clinic.
12/08/2015: Details 702 and 1601 need to be added to theplans.
Department: Environmental Planning
Contact: Kelly Kimple, 970-416-2401, kkimpleMccgov.com