Loading...
HomeMy WebLinkAboutSTRACHAN FOURTH THE SQUARE PHASE 3 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2016-07-06F6rt Cityof ''Cottins �� ngitnn City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: ZZIssuance Date: P Project Name: The Square (Strachan 0 Filing) Phase 3 Project Location: NW corner of JFK and Horsetooth Road Permittee: Darrell Knudson, Square Shopping Center, LLC, (714) 838-3737 City and developer contacts: See attached Exhibit `A' for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee Construction Inspection Fee Street Cut Fee (if applicable to be paid separately) Total amount due $ 400.00 $ 1,104.40 $ 0.00 $ 1,504.40 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 33,191.00 Form of security deposited with the City: clti� � �1 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Page 1 of 5 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the `as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to Page 2 of 5 construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and con4i f'ons so stated iq} s permit. Applicant/Project Manager's Approval for issuance. - City Engineer Approval: Date: (Permit Issuance Date) Page 3 of 5 EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: The Square (Strachan 4`h Filing) Phase 3 Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Langenberger 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6573 Construction Inspector: Steve Cicione 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 692-4418 Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6343 Water Utilities Engineering: Shane Boyle 700 Wood Street, Fort Collins, Co 80521 (970)221-6339 Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, Co 80521 (970) 224-6700 Natural Resources: Kelly Kimple 281 N. College Avenue, Fort Collins, Co 80524 (970) 416-2401 Traffic Operations: Martina Wilkinson 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6887 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970)221-6361 Light and Power: Janet McTague Page 4 of 5 700 Wood Street, Fort Collins, Co 80521 (970)224-6154 Developer's Contact Persons: Project Manager/Developer/Owner: Center, LLC CA 92780 Darrell Knudson, Square Shopping 17731 Irvine Blvd, Suite 202, Tustin, 714-838-3737 Cell (714) 323-1902 Fax (714) 832-9160 darrellna,knudsonengineers.com Project Engineer: Sam Eliason, United Civil Design Group Inc. 1501 Academy Court, Suite 201 Fort Collins, CO 80524 970-530-4044 Cell (970) 217-7420 Sam.eliasona,unitedcivil.com Architect/Planner: Russell Lee, Ripley Design, Inc. 401 Mountain Ave, Suite 100 Fort Collins, CO 80521 970-224-5828 Russ.lee(&leydesigninc.com General Contractor: John Sailer, Sailer Construction of Fort Collins, CO 80525 5318 Highcastle Drive, Fort Collins, CO 80525 Cell (970) 412-9605 sailer]Agmail.com Page 5 of 5 000000 000000000000 000000 0000 ooOooO IV: ggOO0000 Oo0Oo0 pOOO �o C o 0 0 0 0 O o 0 0 0 C w o o c o o O O U) O M o 0000 N N O fri es is es es is N_ es vies fA eA N EA 09. es ef) fs eA P, Lfi P O 69 fs to fA fil QCl) N W to LO fA 1 i N N G O N lJ o y W p m 0 Z LL O z oOOOOO 000000000000 Ln �n IL'1000 I-I�I�h000 p0000 We[OOOa� �p _J OOM Cl) M Cl) OOOOOOM 0000In � � 0Z0 R eR fs fs OO 6%C9 m 60 �I`O �r- m00 O w 61%ss s fs » CD 0 es y H Wa >F z a O w Zcc LL d m > N z Kw O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000 00000000000 oOLVoovio 00 ` C ' a4 M tR M fR eR 69 ws eR fA e1) p) N! <A fN di fA O es p CO 0 Cl) wi b9 b9 W r w O_ aMw Z W S LL CCL y�C W O w H W— V w H Q W W 0 0 0 000 000000000000 0000000 00 ~ LU m = o00000 000000000000 0000000 0o N O F �0— f F 000000 CVOOOOCCOCCOO G fL)LV CLnO OO G S Z W V F w m tok f!a eA es eR era CVi tr! fs fs es tO C0� vs es f» fn to),Io n O co vDI es v� 0 w 3Cl>� p fs W G Y U)Ive ­W es G Q 0 y~ a W F O J co V � z (0) = z py N N Z zVvOC?<v F w p Q m S 000000 �IOOOOONO0000 e'O Nlq c7 pf O o 000 d O Q W W •- R c+� �7 H W Z LL. C z Z W F F- W z Z (aQ }}mw U C Ul p W 0 3 C LU > � �.�jj Z `� Q N w LU 0 o V Z O. LL UJ I—w 0 W • OO c> yy L)2=222222W ZO O IL LL>:>: LL IL : ILUU L)C6 >- LLILLL�>- a}QLL m OJ J U U QW JyJ J J yy J 6 W y 0 Lm 0H C J O Z Q C m m c LL. V CW aU E 19 w O CL IL yUJ IX H w U E- o Cl)a yUVZ fe O W o 2 c U)z K H fn U) w l- ILU) Q W d (n m d J 2 O U) � U) x t> > m U)y c c U »(.� m C7 m S C f J 1 C M y E LL O Z W Z a Z d O L c � c ; o. —� J Oa� mU 'mod 3 J^vU m d a n.JF-Y f a m �-- d a;._ 2Qy O a w m m >> y 3 c = d a N c c c E I W �- a> F- m L v = m m c -o O W O C Q y 2 p� C7 d o6 m C9 m c = ° c rn c f" G y (i Or y 0 Z �L co N a� CAd N'C m A N c N QF'O W y c co t `m y `� cti c y > 8 m L m >= V 0 d o m W W Lo > ,.9 2 rL>o o >> R't-zM oid V7oCHU3¢i m�3 �3iii>>iU. "�ac'�oa$'¢v W aaa aza