June 05, 2013
Angela Milewski
BHA Design
1603 Oakridge Dr.
Fort Collins, CO 80525
RE: Avago Technologies Building 4 West Expansion Major Amendment, FDP130006, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. if you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970.221.6343, tshepard .fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 06/05/2013
06/05/2013: Be sure to add to the plans all the impact mitigation measures that were agreed to
between Avago and the property owners to the north post public hearing.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221.6501, tsiegmund(&,fcgev.com
Topic: General
Comment Number: 5 Comment Originated: 06/04/2013
06/04/2013: An excavation permit for the bus stop construction in the right-of-way will need to
be obtained prior to the start of installation. City acceptance of the bus pad and walk will be
required prior to Certificate of Occupancy. Please contact me for more information about the
permitting process.
Comment Number: 6
Comment Originated: 06/04/2013
06/04/2013: The bus stop/connecting walk detail on sheet C701 shows curb and gutter along E
Harmony. Is this proposed with the bus stop installation?
It was discussed at the site meeting to incorporate a 6 inch curb at the back of the bus stop pad
that is not shown on the detail.
Please provide more information on the grade break behind the proposed walk down to the
irrigation ditch. Depending on the grade break additional curb behind the walk may be
needed.
with the Larimer County Clerk & Recorder's office for a current deed.
Response: The legal description has been corrected.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanfordb-fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 04/16/2013
04/16/2013: Where is the displaced parking being relocated? Concern is if the relocated
parking is at a location that may cause access roadway issues spilling back onto public
roadways.
Response: The displaced parking areas are vacant, unutilized spaces today. The required parking
spaces for the Call Center that uses this parking lot will be maintained with no change from today's
conditions.
Comment Number: 3 Comment Originated: 04/16/2013
04/16/2013: Traffic Op's has mild concern regarding traffic circulating around the "coveted" 84
spaces by the addition that might cause a blockage of entering traffic from Ziegler spilling back
onto Ziegler. Highly doubtful but need to make note of the concern.
Response: Again, the parking spaces that will remain, as shown', on the plans, are adequate for the
needs of the usersof this lot. The 84 parking space will be accoTmodated within the remaining lot.
Department: Transportation Planning
Contact: Emma McArdle, 970-224-6197, emcardl ftcaov.com
Topic: General
Comment Number: 1 Comment Originated: 04/16/2013
04/16/2013: According to LUC section 3.6.5, new development shall "adequately accomodate
existing and planned transit service by integrating facilities designed and located appropriately
for transit into the development plan."
Transfort operates 2 routes on Harmony Road adjacent to this site. A bus stop is utilized at the
northwest corner of Harmony Road and Technology Parkway, it is; not ADA accessible and
does not meet our transit design standards. In accordance with the LUC, this development
shall upgrade this stop to at a minimum meet ADA accessibility. Because this is a challenging
site, I think it would be best to plan a brief site visit to discuss how';this can be accommodated.
Please get in touch with me to plan a visit. Contact either 970-224 6197 or
emeardle(cDfcgov.com.
Response: Avago has met with Emma and is making ADA improvements to the Harmony Road transit
stop as requested. Please see Sheet C701.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals c ov.com
Topic: General
Comment Number: 1 Comment Originated: 04/10/2013
04/10/2013: Land Use Code (LUC) 3.2.4(C) Lighting levels for loading and unloading docks is
minimum average of 5 foot-candles. Plans will need to be revise.
Response: Plans have been revised showing additional lighting' in the immediate area around the loading
dock in order to bring the minimum average illuminance to 5fc.
Light fixture Z4 appears to be up -lighting. Please provide details that indicate that the light will
be locked into a down directional position.
Response: Note has been added to light fixture schedule indicating Type Z4 fixture is used for temporary
maintenance only. The fixtures will be adjusted so they remain locked in a downward direction.
Comment Number: 2 Comment Originated: 04/10/2013
04/10/2013: Based on the proposed plans it is expected that some asphalt that currently exists
will be removed. Where the asphalt is removed these areas will no longer be allowed for any
vehicle use or storage. Please indicate on the plans on vehicles lose and storage will be
restricted from the landscaped area.
Response: A curb has been added along the parking area in question. A note has been added stating no
storage or vehicle use shall be allowed in the landscape areas.
Comment Number: 3 Comment Originated: 04/10/2013
04/10/2013: Please indicate the color of the cooling towers.
Response: The cooling towers will be painted to match the building, and the color has been indicated on
the Architectural Elevations.
Additional trees or screening are needed to screen the cooling tourers and utility yard.
Response: Additional trees have been provided on the berm as,well as on the north property line.
Comment Number: 4 Comment Originated: 04/10/2013
04110/2013: Where is the trash and recycling enclosure? How a�e the increased trash and
recycling needs of the addition being handled?
Response: Trash and Recycling will be handled in existing facilities within the "Corporate Yard" east of
the building. There is enough capacity to handle the new building needs.
Department: Current Planning
In preparation for the May 16, Planning and Zoning Board hearing, please provide a revised Site and
Landscape Plan that indicates the height, length, width, slope add landscaping of the berm located north
of the building.
Response: An illustrated site plan will be provided for the Planning and Zoning Board Hearing.
4
Topic: Site Plan
Comment Number: 7 Comment Originated: 06/04/2013
06/04/2013: Please include the bus stop and connecting sidewalk on the site plan
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex -fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/02/2013
04/02/2013: No comments.
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchananDfcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 04/17/2013
04/17/2013:
Royal Raindrops Crabapple is a new cultivar. Recommend that this selection be reviewed with
some local nursery professionals about their experience with its fire blight resistance.
Scots Pine may require more insect control than other pines.
Consider using some Austrian Pine to provide increased species diversity
Comment Number: 2 Comment Originated: 04/17/2013
04/17/2013:
Please identify species and size (DBH) of trees to be transplanted.
Add a Landscape Note that that says in effect:
Method of transplanting and after care for all transplanted trees to follow a qualified and
experienced tree transplanting contractor's recommendations on all of the following items.
Recommendations from the qualified and experienced tree transplanting contractor shall be
provided to the City Forester prior to transplanting.
Size of tree spade
Time of year for transplanting
Mulched water basin size and location
Staking and guying
Supplemental irrigation frequency and duration after transplanting
Inspections for health and insect and disease problems during establishment
Comment Number: 3
04/17/2013:
Comment Originated: 04/17/2013
Please provide a tree planting detail for new and transplanted trees. Transplanted tree detail
should incorporate recommendations from a qualified and experienced tree transplanting
contractor.
4
Comment Number: 4
04/17/2013:
Comment Originated: 04/17/2013
Are there any other trees impacted by the proposed construction other than those shown to be
transplanted? If so please schedule an on -site meeting with the City Forester to review and
determine in any mitigation will be required.
Department: Park Planning
Contact: Craig Foreman, 970.221.6618, cforeman@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/29/2013
03/29/2013: No comments
Department: PFA
Contact: Jim Lynxwiler, 970-416.2869, ilynxwiler ,poudre-fire.ora
Topic: General
Comment Number: 08 Comment Originated: 06/04/2013
06/04/2013: All prior comments from PFA have been satisfactorily resolved by representatives
of AVAGO. No further comments required.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 04/08/2013
04/08/2013: Please address all of the redlines in the Erosion Control Report (There are
redlines on the plan drawings included in that report.), Please also attach a sequence chart
(based off of the section C "Sequenced BMP Implementation")to the planset. If you need
clarification concerning this, or if there are any questions please contact Jesse Schlam
970-218-2932 or email at jschlam@fcgov.com
Comment Number: 2
Comment Originated: 04/08/2013
04/08/2013: Please Supply an Erosion Control Calculation. If you need clarification concerning
this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email at
jschlam@fcgov.com
Contact: Wes Lamarque, 970.416.2418, wlamarquetidlfcgov.com
Topic: General
Comment Number: 5
Comment Originated: 06/04/2013
06/04/2013: The detail for the underdrain needs to be discussed. Wrapping the fabric with a
geomembrane is not preferred.
Department: Technical Services
Contact: Jeff County, 970.221.6588, jcountyAfcgov.com
Topic: Building Elevations
Comment Number: 1
06/04/2013: No comments.
04/15/2013: No comments.
Comment Originated: 04/15/2013
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 04/15/2013
06/04/2013: This has been addressed, but the spelling of "Ziegler" is incorrect. The description
of benchmark 7-01 does not match our description. What is benchmark #1, and how will
someone find the benchmarks?
04/15/2013: Please correct the elevations for the benchmarks shown on sheets C100, C101,
C200, C201, C202, C203, C204, C300, C500, C600, C700 & C701.
Comment Number: 3
Comment Originated: 04/15/2013
06/04/2013: There are still line over text issues on sheets C500 & C701.
04/15/2013: There are line over text issues on sheets C200, C201, C600 & C801.
Topic: Site Plan
Comment Number: 7
Comment Originated: 04/16/2013
06/04/2013: This has been addressed, but "Fort" needs to be spelled out.
04/16/2013: Please correct the legal description. This does not match the current legal
description shown on the Larimer County Assessor's webpage. We suggest that you check
with the Larimer County Clerk & Recorder's office for a current deed.
Department: Transportation Planning
Contact: Emma McArdle, 970-224.6197, emcardlg@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/16/2013
04/16/2013: According to LUC section 3.6.5, new development shall "adequately accomodate
existing and planned transit service by integrating facilities designed and located appropriately
for transit into the development plan."
Transfort operates 2 routes on Harmony Road adjacent to this site. A bus stop is utilized at the
northwest corner of Harmony Road and Technology Parkway, it is not ADA accessible and
does not meet our transit design standards. In accordance with the LUC, this development
shall upgrade this stop to at a minimum meet ADA accessibility. Because this is a challenging
site, I think it would be best to plan a brief site visit to discuss how this can be accomodated.
Please get in touch with me to plan a visit. Contact either 970-224-6197 or
emcardle@fcgov.com.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffington fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/16/2013
04/16/2013: No comments.
Of
AecAothns
00,
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentreview
April 19, 2013
Angela Milewski
BHA Design
1603 Oakridge Dr.
Fort Collins, CO 80525
RE: Avago Technologies Building 4 West Expansion Major Amendment, FDO130006, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsilge mundAftgoy.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 04/16/2013
04/16/2013: Please add our General Notes (Appendix E-1 FC/Lar in LCUASS) to the cover
sheet in addition to the construction notes. Contact me if you need a copy of our General
Notes Appendix.
Response: Ft. Collins General Notes have been added to plans,
Comment Number: 2 Comment Originated: 04/16/2013
04/16/2013: For final mylar submittal: remove planning submittal from the revisions box on the
title block on all utility plan sheets.
Response: The planning submittal date has been removed from! the title block.
Topic: General
Comment Number: 3 Comment Originated: 04/16/2013
04/17/2013: As discussed in the staff review meeting, no emergency access/fire access
easement is needed per PFA
Response: Noted, no action needed.
04/16/2013: There is a separate process to dedicate the fire access easement included with
this submittal. A Transportation Development Review Fee of $260 plus recording costs are
needed to dedicate this easement by separate document. Please contact me and I can email
additional information on this process.
Topic: General
Comment Number: 4 Comment Originated: 04/16/2013
04/17/2013: As discussed in the staff review meeting, no emergency access/fire access
easement is needed per PFA.
Response: Noted, no action needed.
04/16/2013: The proposed fire access easement needs to extend to a public street connection
for PFA to have access to the property in the event of an emergency. On the current plat, ring
road is not dedicated as emergency access.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchananCdtfc o� v.com
Topic: Landscape Plans
Comment Number: 1
04/17/2013:
Comment Originated: 04/17/2013
Royal Raindrops Crabapple is a new cultivar. Recommend that thlis selection be reviewed with
some local nursery professionals about their experience with its fire blight resistance.
Response: Discussions with local nursery professionals reveal the species has superior disease
resistance.
Scots Pine may require more insect control than other pines.
Response: The campus currently has multiple Scots Pines which are maintained for insect control
regularly.
Consider using some Austrian Pine to provide increased species diversity
Response: Noted, Austrian Pines have been added to the plant jpalette.
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 04/17/2013
04/17/2013:
Please identify species and size (DBH) of trees to be transplanted.
Response: Noted and added.
Add a Landscape Note that that says in effect:
Method of transplanting and after care for all transplanted trees to' follow a qualified and
experienced tree transplanting contractor's recommendations on all of the following items.
Recommendations from the qualified and experienced tree transplanting contractor shall be
provided to the City Forester prior to transplanting.
Size of tree spade
Time of year for transplanting
Mulched water basin size and location
Staking and guying
Supplemental irrigation frequency and duration after transplanting
Inspections for health and insect and disease problems during establishment
Response: Note has been added.
Comment Number: 3 Comment Originated: 04/17/2013
04/17/2013:
Please provide a tree planting detail for new and transplanted trees. Transplanted tree detail
should incorporate recommendations from a qualified and experienced tree transplanting
contractor.
Response: Planting details have been added to page 2 of the Site/Landscape Plan.
Comment Number: 4 Comment Originated: 04/17/2013
04/17/2013:
Are there any other trees impacted by the proposed construction other than those shown to be
transplanted? If so please schedule an on -site meeting with the City Forester to review and
determine in any mitigation will be required.
Response: All impacted trees shall be transplanted on site.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmart! n cgov,com
Topic: General
Comment Number: 1 Comment Originated: 04/05/2013
04/05/2013: The builder or developer will need to coordinate the location of a new high voltage
switch and a primary voltage electric meter with Jim Garcia in Light & Power Engineering
(970)221-6817.
Response: Owner and design team met with Jim Garcia and Tiajna Smith from City of Ft. Collins Light
and Power Engineering on March 3`d to confirm incoming power requirements. Existing utility duct bank
north of the building has spare capacity for new 13.2kV cables serving the west annex. New switch and
primary meter equipment will be located north of cooling towers Adjacent to duct bank. Team will remain
in contact with Jim/Tiana as design progresses and loads are confirmed.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler ,poudre-fire.oro
Topic: General
Comment Number: 01 Comment Originated: 04/16/2013
04/16/2013: ACCESS & WATER SUPPLY
Fire department access and water supply concerns have been addressed and resolved by
Avago representatives prior to FDP.
Response: Noted, no action needed.
Comment Number: 02 Comment Originated: 04/16/2013
04/16/2013: ROOF ACCESS
Per prior discussions with Avago representatives, a protected stairwell with roof access will be
provided on the west side of the building. Stairway access to the roof shall be in accordance
with IFC 1009.12. Such stairways shall be marked at street and floor levels with a sign indicating
that the stairway continues to the roof.
Response: Will be provided as noted at the NW stairwell
Comment Number: 04 Comment Originated: 04/16/2013
04/16/2013: FIRE DEPARTMENT CONTROL PANEL
The relocation of the control panel for Bldg. 4 shall be approved by the fire department.
Response: Will be addressed with remote panel coordinated with fire department during building permit
process.
Comment Number: 05 Comment Originated: 04/16/2013
04/16/2013: KEY BOXES REQUIRED
The location or relocation of Knox Boxes shall be approved by the fire department.
Response: Will be addressed with Knox Box locations coordinaited with fire department during building
permit process. We acknowledge input from Jim Lynxwiler that t�his may require one or two additional
locations.
Comment Number: 06 Comment Originated: 04/16/2013
04/16/2013: MISCELLANEOUS
BDA assessment, fire protection systems, fire detection & alarm sIystems, and hazardous
materials concern shall be addressed at the time of building plan teview.
Response: Will work Poudre Fire Authority as noted at time of building permit review process.
Comment Number: 07 Comment Originated: 04/18/2013
04/18/2013: EAE MAY BE ELIMINATED
The proposed EAE on the north side of Bldg. 4 may be omitted from the plat as the EAE
begins and ends inside the campus and doep not connect to a public road. As such, the Fire
Marshal will accept this pre-existing condition with the understanding that the proposed access
road to the north side of Bldg. 4 conform to current fire lane standards as previously discussed.
Response: Noted, no action needed.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, Ischlam c ov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 04/08/2013
04/08/2013: Please address all of the redlines in the Erosion Control Report (There are
redlines on the plan drawings included in that report.), Please also attach a sequence chart
(based off of the section C "Sequenced BMP Implementation")to the planset. If you need
clarification concerning this, or if there are any questions please contact Jesse Schlam
970-218-2932 or email at lschlarn(W gov.com
Response: Martin/Martin, Inc. Response: The redlines in the Erosion Control Report and Plan drawings
have been addressed. Per email and phone conversation with Jesse Schlam, sequence charts have been
added to the plans.
Comment Number: 2 Comment Originated: 04/08/2013
04/08/2013: Please Supply an Erosion Control Calculation. If you need clarification concerning
this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email at
jschlarn( fcgo, v.com
Response: An Erosion Control Calculation is included in Appendix C of the report. An individual copy of
the Erosion Control Calculation has also been provided with thissubmittal.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountyWcgov.com
Topic: Building Elevations
Comment Number: 1
04/15/2013: No comments.
Response: No action needed.
Topic: Construction Drawings
Comment Originated: 04/15/2013
Comment Number: 2 Comment Originated: 04/15/2013
04/15/2013: Please correct the elevations for the benchmarks shown on sheets C100, C101,
C200, C201, C202, C203, C204, C300, C500, C600, C700 & C701.
Response: The benchmark elevations have been corrected.
Comment Number: 3 Comment Originated: 04/15/2013
04/15/2013: There are line over text issues on sheets C200, C201, C600 & C801.
Response: The line over text issues have been resolved.
Comment Number: 4 Comment Originated: 04/15/2013
04/15/2013: There is a text over text issue on sheet C201.
Response: The line over text issues have been resolved.
Topic: Lighting Plan
Comment Number: 5
Comment Originated: 04/15/2013
04/15/2013: Please correct the address shown on sheets 1 & 2.
Response: Address has been corrected.
Topic: Site Plan
Comment Number: 6 Comment Originated: 04/16/2013
04/16/2013: Please correct the address shown on sheets 1 & 2.
Response: Address has been corrected.
Comment Number: 7
Comment Originated: 04/16/2013
04/16/2013: Please correct the legal description. This does not match the current legal
description shown on the Larimer County Assessor's webpage. We suggest that you check