FINAL PLAN
COMMENT
SHEET
DATE: December 18, 2015
TO: Street Maintence Program- To4 Kno ma
PROJECT PLANNER: Clay Frickey
FDP150047 City of Fort Collins
Community Recycle Center
Please return all continents to the project planner no later than the staff
review meeting:
January 13, 2016
If you do not have access to the Accela program, please send your comments via
email to: efrickey@fcgov.com
Note - Please identify Your redlines for future re,Lerence
No Problems
Problems or concerns (see below, attached, or Accela)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
444 (kt sAi re _Drainage Report _Other
tility _Redline Utility _Landscape
Topic: General
Comment Number: 1 Comment Originated: 04/02/2015
04/02/2015: The proposal should include curb, gutter, sidewalk along
Timberline. If this is to be constructed with a different project, then there should
a note on the plans. The future Timberline layout is shown in grey and noted as by others.
Comment Number: 2 Comment Originated: 04/02/2015
04/02/2015: The operation of the access to Timberline needs to be discussed.
We don't think the'pork chop' shown will function very well, or adequtely limit
users of the center to a right -in, right -out. If the Timberline project will build a
median in 2016, we should explore a left in (3/4 movement). In the meantime
we could leave the access without a porkchop and simply sign it with no left turn. The Porkchop was
planned to just be interim with asphalt curb and a place for extra signs. We want to train users that it is
right in right out and if left open, we would not be able to prevent lefts in from happening in the interim.
Department: Water -Wastewater Engineering
Contact: Dan Mogen, , dmoneri tDfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/02/2015
04/02/2015: Please confirm that water and sewer services are not needed for
this site. They are not. irrigation will be taken from the existing system.
City of Fort Collins Integrated Recycling Facility
April 6, 2015
The Site plan note #3 references a plat. I didn't think that there was a plat.
For the entrance driveway — there doesn't seem a need to extend the curb east past the row line as it
will just be removed next year.
The pork chop. If this remains a part of the plan. Label it as interim to be removed with the planned
road improvements. Provide design information, dimensions, radii, width of pavement, spot elevations,
turning template exhibit to show that the trucks can make the turn.
Emergency overflow spillway needs to be moved west to accommodate the future sidewalk. The
sidewalk cannot slope like the outfall structure, so the structure needs to be far enough behind the row
and the sidewalk that the bermed (high) areas can slope down to the sidewalk that will need to be
placed at the spill elevation or below.
I don't have an old copy of the ODP, so I don't know what it looked like before. Typically the following
notes are included on an ODP and do not see these on this document yet.
Any change in the location of access points with PDP submittals needs to comply with the City of
Fort Collins Land Use Code and the Larimer County Urban Area Street Standards.
Street Standards will be subject to the design standards in effect at the time of application for
project development plans (PDPs).
Off -site improvements may be required at the time of PDP in order to meet level of service for
all modes of transportation.
On the ODP. The access points need to be labeled as Right -in -right -out access points. This can be done
in the legend with the arrow.
On the ODP. Need to place an access arrow at the driveway to the substation, unless that is going away.
r Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgo v. com/developmentreview
Please see comment responses below in red text.
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickev(EMcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/01/2015
04/01/2015: Please remove the site plan overlay from the ODP. We were instructed earlier to include it,
but it's removed now...
Topic: Landscape Plans
Comment Number: 2
Comment Originated: 04/01/2015
04/01/2015: The plant list says there should be 5 Western Hackberry trees but
there are only 4 shown on the landscape plan. Where is the fifth Western
Hackberry? Please update the landscape plan to include the fifth Western
Hackberry.
The drawing data base had lingering attributes that needed to be purged to correct the legend (this made
the legend plant count one additional plant above to the amount shown). These counts have been
corrected. Please also see landscape at the west and south boundaries, as it appears these were
overlooked in your original counts.
Comment Number: 3 Comment Originated: 04/01/2015
04/01/2015: Similarly, the plant list shows 4 Bur Oaks but the landscape plan
only shows 3. Please update the landscape plan to include the fourth Bur Oak.
Note above
Comment Number: 4 Comment Originated: 04/01/2015
04/01/2015: The striped median should be landscaped with a mix of
ornamental trees and shrubs. This will help with meeting the parking lot interior
landscaping standards in 3.2.1(E)(5).
Per our earlier discussion, planting the striped median will hinder truck access to the recycle containers
to the south. In lieu of this landscape, we have added landscape to the east side of the future lot and
added relocated trees to this area. Relocated deciduous trees intended for the lawn west of the power
station will need to be located to this area as well to avoid utility and disc golf conflicts.
Comment Number: 5 Comment Originated: 04/01/2015
04/01/2015: There is a discrepancy between then plant list and landscape plan
y
for the Moonglow Rocky Mountain Junipers as well. The plant list shows 12
while the landscape plan only shows 11. Please add 1 more Moonglow Rocky
Mountain Juniper to the landscape plan. See comment response 2
Comment Number: 6 Comment Originated: 04/01/2015
�2
04/01/2015: Will this project provide street trees along Timberline? If so, they
are not shown on any of the plans. Please update the landscape plan with the
species, quantities and locations of street trees. The trees should be spaced
30-40 feet apart and 40 feet away from light poles per the standards in 3.2.1(D)
(1)•
Based on discussion with Tim Kemp at Capital Projects, the street trees and associated turf will be part of
the 2016 Timberline widening project. Tim provided basic locations for these trees, but final selections
will be determined with competition of the Timberline improvements.
Comment Number: 7
Comment Originated: 04/01/2015
04/01/2015: There is a discrepancy between then plant list and landscape plan
for the Hairy Mountain Mahogany. The plant list shows 10 while the landscape
plan only shows 7. Please add 3 more Hairy Mountain Mahogany to the
landscape plan. See comment response 2
Comment Number: 8
Comment Originated: 04/01/2015
04/01/2015: There is a discrepancy between then plant list and landscape plan
for the Apache Plume. The plant list shows 20 while the landscape planshows
23. Please update the plant list to reflect the 23 shown on the landscape plan. See comment response 2
Comment Number: 9 Comment Originated: 04/01/2015
04/01/2015: There is a discrepancy between then plant list and landscape plan
for the Fragrant Dwarf Sumac. The plant list shows 43 while the landscape plan
only shows 33. Please add 10 more Fragrant Dwarf Sumacs to the landscape
plan. See comment response 2
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slanaenberaertaMcnov.com
Topic: General
Comment Number: 1 Comment Originated: 04/06/2015
04/06/2015: For the entrance driveway —there doesn't seem a need to extend
the curb east past the row line as it will just be removed next year. The curb ends west of the property line.
Comment Number: 2
Comment Originated: 04/06/2015
04/06/2016: The Site plan note #3 references a plat. I didn't think that there
was a plat. Typically there would be a plat. This note was removed.
Comment Number: 3
Comment Originated: 04/06/2015
04/06/2015: The pork chop. If this remains a part of the plan. Label it as
interim to be removed with the planned road improvements. Provide design
information, dimensions, radii, width of pavement, spot elevations, turning
template exhibit to show that the trucks can make the turn. We have added this information.
Comment Number: 4
Comment Originated: 04/06/2016
04/06/2015: Emergency overflow spillway needs to be moved west to
accommodate the future sidewalk. The sidewalk cannot slope like the outfall
structure, so the structure needs to be far enough behind the row and the
sidewalk that the bermed (high) areas can slope down to the sidewalk that will
need to be placed at the spill elevation or below. Current design of Timberline is now shown greyed back.
r Collins
0000M�
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
Please see comment responses below in red text.
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickev(&-fcoov.com
Topic: General
Comment Number: 1 Comment Originated: 04/01/2015
04/01/2015: Please remove the site plan overlay from the ODP. We were instructed earlier to include it,
but it's removed now...
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 04/01/2015
04/01/2015: The plant list says there should be 5 Western Hackberry trees but
there are only 4 shown on the landscape plan. Where is the fifth Western
Hackberry? Please update the landscape plan to include the fifth Western
Hackberry.
The drawing data base had lingering attributes that needed to be purged to correct the legend (this made
the legend plant count one additional plant above to the amount shown). These counts have been
corrected. Please also see landscape at the west and south boundaries, as it appears these were
overlooked in your original counts.
Comment Number: 3 Comment Originated: 04/01/2015
04/01/2015: Similarly, the plant list shows 4 Bur Oaks but the landscape plan
only shows 3. Please update the landscape plan to include the fourth Bur Oak.
Note above
Comment Number: 4 Comment Originated: 04/01/2015
04/01/2015: The striped median should be landscaped with a mix of
ornamental trees and shrubs. This will help with meeting the parking lot interior
landscaping standards in 3.2.1(E)(5).
Per our earlier discussion, planting the striped median will hinder truck access to the recycle containers
to the south. In lieu of this landscape, we have added landscape to the east side of the future lot and
added relocated trees to this area. Relocated deciduous trees intended for the lawn west of the power
station will need to be located to this area as well to avoid utility and disc golf conflicts.
Comment Number: 5 Comment Originated: 04/01/2015
04/01/2015: There is a discrepancy between then plant list and landscape plan
-„ The east edge of the riprap is on the west edge of the proposed Comment Originated: 04/06/2015
00 Comment Number: 5
04/06/2015: 1 don't have an old copy of the ODP, so I don't know what it looked
like before. Typically the following notes are included on an ODP and do not
see these on this document yet. Notes were added to the ODP (notes 1 thru 3)
- Any change in the location of access points with PDP submittals needs to
comply with the City of Fort Collins Land Use Code and the Larimer County
Urban Area Street Standards.
Street Standards will be subject to the design standards in effect at the time
of application for project development plans (PDPs).
nd Joe.
Off -site improvements may be required at the time of PDP in order to meet
drive level of service for all modes of transportation. The new
the ultimateaimprovements for Timberline ation was worked out with ' na a
e in
We believe we have the OK to put this project in as
and funded for 2016 construction for walks, bikes, median, et Comment Originated: 0410612015
Comment Number: 6
04/06/2015: On the ODP. The access points need to be labeled as
Right -in -right -out access points. This can be done in the legend with the arrow. The label was updated.
Comment Originated: 04/06/2015
Comment Number: 7at the driveway to
04/06/2015: On the ODP. Need to place an access
No access torow the CRF is proposed from this location.
the substation, unless that is going away.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanancaov.com
Topic: Landscape Plans
1
Comment Originated: 04102/2015
Comment Number:
04/02/2015:
The new location of the entry road impacts most of the existing trees. Are there
any other viable options or modifications to the position of the entry road that
can be considered to impact fewer trees? Please provide a written response.
Plans for transplanting impacted good exist trees are included which is
appreciated.
s require a substantial portion of the site, and there
The Recycle Center's operations and detention area
are limited locations for these without substantially driving up costs. Access locations with the site are very
limited because of separation distance requirements between neighboring access locations. The current
midpoint access is the most cost effective service location. The alternate access location sharing the
drive with Light and Power was another possibility, but would require removing additional spruce trees,
and the added expense of pavement and grading.
Comment Number: 2
Comment Originated: 04/02/2015
04/02/2015:
Exist tree number 12 is shown as transplanted at its new location but is labeled to keep in place in the
Disposition Table.
At one time the detection pond needed to be larger and was impacting trees 11 and 12. The pond as
e trees. The site was re -walked and the trees were
been decreased in size and no longer impacts thes
checked with Ralph Zentz 4/9/2015.
Comment Number: 3
Comment Originated: 04/02/2015
04/02/2015:
Tree Protection and Transplanting Notes edits and additions:
Please add this sentence to note number 8. The city Forester shall provide the
mitigation number.
Add note number 21. Tree pruning and removal work shall be by a business that
holds a current City of Fort Collins Arborist License and is on the Forestry
Division hourly bid list.
Add note number 22. Location for transplanted trees shall be staked by the City
Project Manager and verified by the Landscape Architect.
These notes were updated.
Department: Light And Power
Contact: Jim Spaulding, 970.416-2772, isoauldina[aUcaov com
Topic: General
Comment Number: 1 Comment Originated: 04/02/2015
04/02/2015: Existing streetlight and splice box located in proposed entrance
will need to be relocated south. System modification charges will apply.
This street light is shown to be relocated.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmoaenCocaov earn
Topic: General
Comment Number: 2 Comment Originated: 04/02/2015
04/02/2015: Please see redlined plans and drainage report. Comments have been addressed.
Comment Number: 3 Comment Originated: 04/02/2015
04/02/2015: Please update detail drawings with current versions. These can
be found in pdf at
h'p://www.fcg0v.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
.dwg's are available upon request - please email me at dmogen
addressed @fcgov.com Comments have been
Comment Number: 4
04/02/2015: An alternative compliance/variance form will be required for thenated: 04/02/2015
paver variance. Please request form from 9m29en@fQ9oy com Comments have been addressed
Comment Number: 5 Comment Originated: 04/02/2015
04/02/2015: Please hatch ponding area for full forebay. Pond is hatched, but forebay will be the scalloped
curb at the edge of the parking
Comment Number: 6 Comment Originated: 04/02/2015
04/02/2015: Please include concrete ribbon on spillway as the spillway will be
active for storms more frequent than the 100-year. Comments have been addressed
Comment Number: 7 Comment Originated: 04/02/2015
04/02/2015: Please extend riprap to toe of spillway slope. The spillway configuration ties to the future
sidewalk on Timberline. We would like to keep this configuration as the projects are less than a year apart
and it would be temporary. The owner will accept that there may be repair needed in the interim if the
spillway flows prior to the walk being built.
Comment Number: 8 Comment Originated: 04/02/2015
04/02/2015: Please shows contours in area of basin OS-2 to support sheet
flow to inlet at design point 1. This is in error — the basin flows to a channel.
Comment Number: 9 Comment Originated: 04/02/2015
04/02/2015: Please provide inlet elevation and detail for pond bottom
supporting 12" ponding depth. Elevation has been added and is shown on the profile.
Comment Number: 10 Comment Originated: 04/02/2015
04/02/2015: Please review 100-year release rate. 0.2 cfs/acre does not apply
to the Spring Creek basin, and historic release for basin A is shown to be 1.9
cfs. Comments have been addressed
Contact: Jesse Schlam, 970-218-2932, ischiam(&fcaov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/31/2015
3/25/2015: The current Erosion Control Materials Submitted do not meet
requirements. See redlines for corrections in the Erosion Control Plan and
Erosion Control Report (Stormwater Management Control). The Site will also
have to recalculate the Erosion Control Escrow Calculations based on redlines.
If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ We are working directly with
Jesse to get the EC Report in the state he needs.
Department: Technical Services
Contact: Jeff County, 970-221-8588, icountvD-fcaov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 03/31/2015
03/31/2015: The titles need to match other plan sets. See redlines. Comments have been addressed
Comment Number: 2 Comment Originated: 03/31/2015
03/31/2015: The titles in the sheet index do not match the titles on the sheets. Comments have been
addressed
See redlines.
Comment Number: 3 Comment Originated: 03/31/2015
03/31/2015: Please make changes as marked on sheet 2. See redlines. Comments have been addressed
Comment Number: 4 Comment Originated: 03/31/2015
03/31/2015: There is text that needs to be rotated 180 degrees. See redlines. Comments have been
addressed
Comment Number: 5 Comment Originated: 03/31/2015
03/31/2015: There are line over text issues. See redlines. Comments have been addressed
Topic: General
Comment Number: 6 Comment Originated: 03/31/2015
03/31/2015: ODP: Please make sure all titles match, and the titles need to
match other plan sets. See redlines. The titles were updated.
Comment Number: 7 Comment Originated: 03/31/2015
03/31/2015: ODP: We are waiting to receive deeds for the properties
affected, to confirm the legal description provided. The legals for the land for the recycling center were
prepared by the City Surveyor. We will add these legals to the sheet.
Comment Number: 8
Comment Originated: 03/31/2015
03/31/2015: ODP: Please provide the complete reception number for the
marked note on sheet 2. See redlines. The reception number was updated.
Comment Number: 9 Comment Originated: 03/31/2015
03/31/2015: ODP: Sheet 3 was not provided for this plan set. Added.
Topic: Landscape Plans
Comment Number: 10 Comment Originated: 03/31/2015
03/31/2015: The titles need to match other plan sets. See redlines. Titles were changed.
Comment Number: 11 Comment Originated: 03/31/2015
03/31/2015: There are line over text issues. See redlines. Line over text was corrected per redlines
Comment Number: 12 Comment Originated: 03/31/2015
03/31/2015: There is text that needs to be rotated 180 degrees. See redlines. Text was rotated.
Comment Number: 13 Comment Originated: 03/31/2015
03/31/2015: The title of sheet 5.0 does not match the index on sheet 1.0. See
redlines. The title was corrected.
Topic: Lighting Plan
Comment Number: 14 Comment Originated: 03/31/2015
03/31/2015: The titles need to match other plan sets. See redlines. Titles were changed.
Comment Number: 15
Comment Originated: 03/31/2015
03/31/2015: We recommend removing all text from behind the lighting values.
The plan is very busy, and this would clean it up a lot. See redlines. Underlying text was removed.
Topic: Site Plan
Comment Number: 16 Comment Originated: 03/31/2015
03/31/2015: Please make sure all titles match. The titles also need to match
other plan sets. See redlines. Titles were changed.
Comment Number: 17 Comment Originated: 03/31/2015
03/31/2015: The titles in the sheet index do not match the titles on the marked
sheets. See redlines. Titles were changed.
Comment Number: 18
Comment Originated: 03/31/2015
03/31/2015: Please add an acceptable legal description for the project
property. We suggest consulting with a Land Surveyor. Legals were provided by the City Surveyor
Comment Number: 19 Comment Originated: 03/31/2015
03/31/2015: Remove "Site Plan" from the sheet title. See redlines. Site Plan was removed
Comment Number: 20 Comment Originated: 03/31/2015
03/31/2015: There are line over text issues. See redlines. Line over text was corrected per redlines
Comment Number: 21 Comment Originated: 03/31/2015
03/31/2015: There is text that needs to be rotated 180 degrees. See redlines. Text was rotated.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221.6887, mwilkinson(Mcgov.com