HomeMy WebLinkAboutBOUTON HOUSE - Filed CS-COMMENT SHEETS - 2016-05-24City Collins
Planning
PO Box 580
Fort Collins, CO 80522-0580
Fax: 970-224-6134
DATE: March 17, 2015
FINAL PLAN
COMMENT SHEET
TO: Development Review Engineering
PROJECT PLANNER: Clark Mapes
FDP150002 Bouton House Subdivision
(combined PDP/FDP - 2"d round)
Please return all comments to the project planner no later than:
March 24, 2015
If you do not have access to the Accela program, please send your comments via email to:
cmapes@fcgov.com
Note - Please identify Your redlines for -future reference
❑ No Problems
❑ Problems or Concerns (see below, attached, or Accela)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of
F6rt Coilins
February 04, 201
Randy Everette
Fort Collins, CO
RE: Bouton House Subdivision, FDP150002, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6760
970.224.6134 - fax
kgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Clark Mapes, at
970-221-6225 or cmapes@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmaues(cDfcciov.com
Topic: General
Comment Number: 1
Comment Originated: 02/04/2015
02/04/2015: At the meeting, we need to discuss whether or not service lines should
be shown on reproducible plans. Are they intended to go into a single trench? If the
decision is to indicate them, then indicate them in a manner that actually fits and
avoids the root cellar.
Topic: Plat
Comment Number: 2
Comment Originated: 02/04/2015
02/04/2015: 1 see questions about the need for several easements. This may be
covered in comments by utilities but we need to discuss several of these at the
meeting. (e.g., sewer along the front; gas to Parcel 3; sewer to parcel 2; Arthur
Ditch.)
Topic: Site Plan
Comment Number: 3
Comment Originated: 02/04/2015
Need a note regarding curb cut to Parcel 3. Also, is 8 fee wide enough for a
driveway?
Comment Number: 4 Comment Originated: 02/04/2015
02/04/2015: What is the dashed diagonal line across the driveway?
Comment Number: 5
Comment Originated: 02/04/2015
02/04/2015: 1 will provide slight edits to the notes regarding LPC review "of future
building permits for exterior alterations of the barn on Lot 1.
Comment Number: 6
Comment Originated: 02/04/2015
02/04/2015: The concrete pad in the driveway raises questions about utility
trenching. Do you want to simply show it "to be removed"?
Department: Engineering Development Review
Page 1 of 4
Contact: Tyler Siegmund, 970-221-6501, tsleamund(Mcgov.com
Topic: General
Comment Number: 1
Comment Originated: 02/03/2015
02/03/2015: The survey plat that was submitted does not meet the requirements for
a subdivision plat. Please work with technical services or contact me for
subdivision plat submittal requirements.
Comment Number: 2
Comment Originated: 02/03/2015
02/03/2015: With the existing ditch on the parcel 1 will the Arthur ditch company
need to sign the plat?
Comment Number: 3 Comment Originated: 02/03/2015
02/03/2015: Does an access easement or shared access agreement exist for the
shared access between parcel 1 and the neighboring property to the north?
Comment Number: 4 Comment Originated: 02/03/2015
02/03/2015: Does an emergency access easement need to be dedicated from the
property to the north per PFA access requirements? If so, a letter of intent from the
neighboring property owner to the north will be needed prior to public hearing.
Comment Number: 5 Comment Originated: 02/03/2015
02/03/2015: Will parcel 3 have phared access with parcel 2? If so, an access
easement will need to be dedicated on the plat.
Comment Number: 6
Comment Originated: 02/03/2015
02/03/2015: Please terminate the proposed gravel driveway on parcel 3 at the
property line. A gravel driveway will not be permitted in the public right-of-way.
Comment Number: 7 Comment Originated: 02/03/2015
02/03/2015: Please locate the private sewer service to parcel 3 in an easement
across parcel 2. See redlines. Typically this area of public right of way is reserved
for franchised utility installation and maintenance. By placing the sewer service in
an easement on parcel 2 you are protecting the service from future excavations and
utility work within the right of way. This is a long run for a sewer service so you may
want to include clean outs for future maintenance of the line.
Comment Number: 8
Comment Originated: 02/03/2015
02/03/2015: If a grading plan is required please add the location and size of the
proposed utility service lines and the existing utility main lines (in Sherwood St) to
the grading plan. Please note exiting utility services and proposed utility services on
the plan. If existing services are not being used then they will need to be terminated
at the main line per COFC Utility Department standards. Please add our standard
construction/utility notes to the grading plan. You can contact me for an updated
version of our standard notes.
Comment Number: 9 Comment Originated: 02/03/2015
02/03/2015: Please add the standard sidewalk note to the site plan:
Any damaged curb, gutter and sidewalk existing prior to construction, as well as
streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to
construction of this project, shall be replaced or restored to City of Fort Collins
standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder(&fcaov.com
Topic: General
Page 2 of 4
.Contact: Tyler Siegmund, 970-221-6601, tsieamund0ftgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: The survey plat that was submitted does not meet the requirements for
a subdivision plat. Please work with technical services or contact me for
subdivision plat submittal requirements.
Comment Number: 2 Comment Originated: 02/03/2015
02/03/2015: With the existing ditch on the parcel 1 will the Arthur ditch company
need to sign the plat?
Comment Number: 3
Comment Originated: 02/03/2015
02/03/2015: Does an access easement or shared access agreement exist for the
shared access between parcel 1 and the neighboring property to the north?
Comment Number: 4
Comment Originated: 02/03/2015
02/03/2015: Does an emergency access easement need to be dedicated from the
property to the north per PFA access requirements? If so, a letter of intent from the
neighboring property owner to the north will be needed prior to public hearing.
Comment Number: 5
Comment Originated: 02/03/2015
02/03/2015: Will parcel 3 have phared access with parcel 2? If so, an access
easement will need to be dedicated on the plat.
Comment Number: 6
Comment Originated: 02/03/2015
02/03/2015: Please terminate the proposed gravel driveway on parcel 3 at the
property line. A gravel driveway will not be permitted in the public right-of-way.
Comment Number: 7 Comment Originated: 02/03/2015
02/03/2015: Please locate the private sewer service to parcel 3 in an easement
across parcel 2. See redlines. Typically this area of public right of way is reserved
for franchised utility installation and maintenance. By placing the sewer service in
an easement on parcel 2 you are protecting the service from future excavations and
utility work within the right of way. This is a long run for a sewer service so you may
want to include clean outs for future maintenance of the line.
Comment Number: 8
Comment Originated: 02/03/2015
02/03/2015: If a grading plan is required please add the location and size of the
proposed utility service lines and the existing utility main lines (in Sherwood St) to
the grading plan. Please note exiting utility services and proposed utility services on
the plan. If existing services are not being used then they will need to be terminated
at the main line per COFC Utility Department standards. Please add our standard
construction/utility notes to the grading plan. You can contact me for an updated
version of our standard notes.
Comment Number: 9 Comment Originated: 02/03/2015
02/03/2015: Please add the standard sidewalk note to the site plan:
Any damaged curb, gutter and sidewalk existing prior to construction, as well as
streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to
construction of this project, shall be replaced or restored to City of Fort Collins
standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
Department: Light And Power
Contact: Todd Vedder, 970-224-6162, tvedder(Mcaov.com
Topic: General
Page 2 of 4
Comment Number: 1
Comment Originated: 01/26/2015
01/26/2015: System modifications and kVA capacity charges will apply.
Comment Number: 2 Comment Originated: 01/26/2015
01/26/2015: Will need electric one -line diagrams for each new electric meter
installed.
Comment Number: 3 Comment Originated: 01/26/2015
01/26/2015: Please send a copy of the AutoCAD drawings to myself at
tvedder@fcgov.com
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-224-6036, bhamdanCa)fcoov.com
Topic: Construction Drawings
Comment Number: 2
Comment Originated: 02/03/2015
02/03/2015: Please provide an existing and proposed grading plan (with detailed
spot elevations) showing how existing drainage patterns work and how the proposed
grading for parcel 3 is planned. No drainage should be directed across newly
created lot lines unless a drainage easement at the downstream property is
provided.
Contact: Jesse Schlam, 970-218-2932, ischlamCciafcaov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 01/20/2015
01/20/2015: No Comment from Erosion Control. This does not disturb soil. If you
need clarification concerning this, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6688, icountvCcDfcaov.com
Topic: Plat
Comment Number: 1
Comment Originated: 02/02/2015
02/02/2015: Land Survey Plats are not acceptable as a Subdivision Plat.
Comment Number: 2 Comment Originated: 02/02/2015
02/02/2015: Please add an acceptable title, which may not be an address. We
suggest "Bouton House Subdivision".
Comment Number: 3 Comment Originated: 02/02/2015
02/02/2015: A full review will take place when the Plat is submitted following the
City's submittal requirements.
Comment Number: 4 Comment Originated: 02/02/2015
02/02/2015: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections were
not made. Please provide any responses on redlined sheets and/or in response
letter.
Topic: Site Plan
Comment Number: 5 Comment Originated: 02/02/2015
02/02/2015: There are line over text issues. See redlines.
Page 3 of 4 ^---
Comment Number: 6 Comment Originated: 02/02/2015
02/02/2015: There is text that needs to be masked. Mask all text in hatched areas.
See redlines.
Comment Number: 7 Comment Originated: 02/02/2015
02/02/2015: If the utility lines are to be shown on this plan, you might consider
changing the title to "Site & Utility Plan".
Department: Water -Wastewater Engineering
Contact: Basil Harridan, 970-224-6036, bhamdan(cDfcaov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 02/03/2015
02/03/2015: Please show existing service lines on the plans. Any existing service
line that will no longer be used any more must be abandoned at the main.
Comment Number: 3 Comment Originated: 02/03/2015
Plans are not reproducible.
Sewer and water service lines crossings need to be encased.
The sewer service line for Parcel 3 is within the public right of way and will
necessitate approval from Engineering Department and other utilities since it
encroaches on the location where typically dry utilities are located. The line should
be placed in a private easement on Parcel 2.
Topic: Easements
Comment Number: 1 Comment Originated: 02/03/2015
Any sewer or water service line that crosses a newly created neighboring, lot should
be placed with a utility easement.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals(a-fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: Please list as a site plan note the approve modification request.
Comment Number: 2 Comment Originated: 02/03/2015
02/03/2015: The planning signature block needs to be changed to Director of
Community Development and Neighborhood Services on both the site plan and plat.
Comment Number: 3 Comment Originated: 02/03/2015
02/03/2015: If there is a share curb cut between parcel two and parcel three. Why
does a proposed gravel driveway have to extend to the curb? The proposed gravel
drive way should not extend past the back of sidewalk. Should this shared access
be in a private easement?
Should there be a private access easement on parcel 1 driveway for parcel 2
access.
Page 4 of 4