HomeMy WebLinkAboutSUNRISE RIDGE FIRST FILING REPLAT - Filed CS-COMMENT SHEETS - 2016-05-20Fort Collins FINAL PLAN
c�nent R6.EVISION,Planning COMMENT
281 N. College Ave.
Fort Collins, CO 80524 � HE
Fax 970-224-6134 ET
r, �
DATE: October 19, 2012
TO: Development Review Engineering
PROJECT PLANNER: Ted Shepard
FDP 120009 Sunrise Ridge First Filing Replat
2nd Round of Review
Please return all comments to the project planner no later than the staff
review meeting:
October 31, 2012
Note - Please identify vour redlines for future reference
❑ No Problems
❑ Problems or Concerns (see below, attached, or Accela)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other.
Utility Redline Utility _Landscape
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80622
970.221.6760
970.224.8134 - fax
fcgov. com/developmentreview
October 31, 2012
David Houts
Bogard Construction, Inc.
300 E. Horsetooth Rd. #103
Fort Collins, CO 80528
RE: Sunrise Ridge First Filing Replat Major Amendment & Final Plan, FDP120009, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Tyler Siegmund, 970.221.6501, teegmund@fcgoov.com
Topic: General
Comment Number: 9
Comment Originated: 10/30/2012
10/30/2012: Regarding the Sunrise Ridge First Filing Development Agreement, Amendment
Agreement No.1, payments of $4,545.91 will be due prior to the issuance of each of the next
four building permits for the developerls local street portion of the roadway costs for Strauss
Cabin Road.
Topic: Plat
Comment Number: J Comment Originated: 10/30/2012
1. There are a few of the standard plat language statements missing from the plat. Please
add:
(a) Attorneys Certification
(b) Notice Statement
(c) Private conditions note
Please contact me and I will provide you with the notes that need to be added.
Topic: Site Plan
s
Department: Engineering Development Review
Contact: Tyler Siegmund, 970.221.6501, tsiegmund �fcgov.com
Topic: Site Plan
Comment Number:0 1 Comment Originated: 07/24/2012
10/30/2012: Site note 10 is a little confusing, please revise the note to read: A drive approach
permit will be required for driveway installation on all lots cutting the existing curb & gutter. Lots
accessing off of Daylight Court may not NEED TO cut the existing curb & gutter for the driveway
to function ...... ect.
07/24/2012: A drive approach permit will be required for driveway installation on all lots cutting
the existing curb and gutter. A note referencing this needs to be added to the site plan.
Comment Number:( Comment Originated: 07/24/2012
10/30/2012: Please revise site note #15 to read: Each lot shall only be permitted ONE drive
approach per lot.
07/24/2012: Each lot shall only be permitted one drive approach per lot. Please add a note
referencing this on the site plan
Comment Number: � Comment Originated: 07/24/2012
10/30/2012: Please revise Site Note #13 to reference the City of Fort Collins Engineering
Department.
07/24/2012: Access agreements/easements will be required where two lots are sharing a
driveway. It will be the applicants responsibility to file the documents with the county clerks
office and submit a copy to Engineering.
Comment Number• Comment Originated: 10/30/2012
10/30/2012: Trac B is not labeled on the site plan. If Tract B is part of this replat please label
on the plan, or if it is not part of the replat please remove the legal description.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224.6143, lex „ fcgov.com
Topic: General
Comment Number: 1
07/23/2012: No comments.
Department: Light And Power
Contact: Doug Martine, 970-224.6152, dmartine@.fcgov.com
Topic: General
Comment Originated: 07/23/2012
Comment Number: 1 Comment Originated: 07/17/2012
07/17/2012: The existing electric utility system was installed for duplexes to only lots 1,2,10,11,
& 12. Additional electric development and system modification charges will apply. Each
dwelling unit must be individually metered (from one service line). The developer will need to
coordinate electric facilities & charges with Light & Power Engineering at 221-6700.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970.416.2418, Wamaraue[c0cgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/24/2012
07/24/2012: Please revise the hydrology calculations. The impervious area for the site will
increase. This may require additional quantity detention and water quality treatment.
Department: Technical Services
Contact: Jeff County, 970.221.6588, lcountdfcgov.com
Topic: Plat
Comment Number: 2 Comment Originated: 07/23/2012
07/23/2012: The title will need to be changed to "Sunrise Ridge, First Filing, First Replat".
Comment Number: 9 Comment Originated: 07/24/2012
07/24/2012: Please add the missing title commitment information on sheet 1.
Comment Number: 10 Comment Originated: 07/24/2012
07124/2012: Are there leinholders for these properties? If so, please add the leinholder
signature block.
Comment Number: 11 Comment Originated: 07/24/2012
07/24/2012: Please show all dedication information for the adjacent street right of way.
Comment Number: 12 Comment Originated: 07/24/2012
07/24/2012: Please show all right of way widths, including radi.
Comment Number: 13 Comment Originated: 07/24/2012
07/24/2012: Please provide monument records for all public corners shown.
Topic: Site Plan
Comment Number: 3 Comment Originated: 07/23/2012
07/23/2012: The title will need to be changed to "Sunrise Ridge, First Filing, First Replat".
Comment Number: 4 Comment Originated: 07/23/2012
07/23/2012: Please change the sub -title to match the Subdivision Plat.
Comment Number: 5 Comment Originated: 07/23/2012
07/23/2012: Please change the legal description to match the Subdivision Plat.
Comment Number: 6 Comment Originated: 07/23/2012
07/23/2012: Why are Lots 3 & 7-12 of Sunrise Ridge, First Filing shown on this plan?
Comment Number: 7 Comment Originated: 07/23/2012
07/23/2012: There are many line over text issues.
Comment Number: 8 Comment Originated: 07/23/2012
07/23/2012: Please change the sheet numbering to "1 of V.
Department: Traffic Operation
Contact: Ward Stanford, 970.221.6820, wstanford(rDfcuov.com
• . -
Department: Traffic Operation
Contact: Ward Stanford, 970-221.6820, wstanford@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/25/2012
07/25/2012: Reviewing the past units vs. the new proposed number and type of units the extra
traffic amounts to only 40 vehicles per day and only 4-12 per a peak hour. As such no TIS is
required and no significant impacts are expected to area roadways. No issues for Traffic
Operations.
Department: Zoning
Contact: Peter Barnes, 970-416.2355, Pbarnes(dlfcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 07/17/2012
10/22/2012: Site note #6 explains the setback modification to reduce the side setback to 10'
on numerous lots, including lot 7. However, the building envelope shown on the site plan for
Lot 7 indicates a 9' side setback. Need to clarify which setback is correct - 9' or 10'.
07/17/2012: The site plan shows the requested 10' setback for Lots 1 and 2, but for lots 4, 5,
and 7, the setback dimension isn't shown. Instead, it shows a shaded portion of the building
extending beyond a line that I assume is the building envelope line that complies with the
required 20' setback. A 10' setback dimension needs to be shown for these lots in the same