DATE: July 27, 2013
FINAL PLAN
COMMENT SHEET
TO: Development Review Engineering
PROJECT PLANNER: Pete Wray
FDP130003 Boardwalk Crossing at
Mason Street
(Final Plan of combined PDP/FDP)
Please return all comments to the project planner no later than
the staff review meeting:
July 17, 2013
Note -.Please identify Your redlines .for future reference
❑ No Problems
❑ Problems or Concerns (see below, attached, or Accela)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
r r ARCHITECTURE
WEST, L.L.C.
A RC M ITECTU R E/PLAN N I N O
CURRENT PLANNING
1. PARKING; The project provides adequate shared parking that does not exceed the required
maximum ratios.
2. BICYCLE PARKING; The required covered and open bike parking has been provided on site.
3. TOD STANDARDS; The project is compliant with TOD design and height requirements.
4. TOD BUILDING HEIGHT; The project is compliant with the minimum TOD height requirements.
5. TYPE 1 REVIEW; Understood, the office / retail uses, under 25K/sf, are a Type 1 review.
6. NEIGHBORHOOD REVIEW; A Type 1 review does not require a APO meeting, none provided.
7. DEVELOPMENT REVIEW GUIDE; Acknowledged, review guide available.
8. FC LUC; The project complies with the FC General Development Standards.
9. LUC MODIFICATION REQUEST; The project has not request any Standards modifications.
10. SUBMITTAL CHECKLIST; The project has review and completed the application checklist.
11. DEVELOPMENT REVIEW FEES; The project has submitted the required review fees, as noted.
12. SUBMITTAL APPOINTMENT; The project contacted Staff for a Submittal meeting, prior.
ARCHITECTURE WEST LLC ........... February 26, 2013
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
kgov. com/developmenlreview
March 22, 2013
Steve Steinbicker
Architecture West, LLC
4710 S. College Avenue
Fort Collins, CO 80525
RE: Boardwalk Crossing at Mason Street, FDP130003, Round Number 1
RESPONSE COMMENTS; ARCHITECTURE WEST LLC, APRIL 16, 2013
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Sherry Albertson -Clark, at
970-224-6174 or slbertson-clark(cDfcgov.com. Pwray .fcgov.com
Comment Summary:
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number:1 Comment Originated: 03/20/2013
03/20/2013: Place street trees between sidewalk and curb along Boardwalk unless there is a
site constraint. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 2 Comment Originated: 03/20/2013
03/20/2013: In Planting note #13 add the Utility/tree separation information found in 3.2.1 K.
Provide tree placement on the plan that incorporates these separation standards.
NOTED & CORRECTED. SEE UPDATED DRAWINGS.
Comment Number: 3 Comment Originated: 03/20/2013
03/20/2013: Please use this information on soil improvement to Planting note # 16.
• The soil in all landscape areas, including parkways and medians, shall be thoroughly
loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly
incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling,
disking or other suitable method, at a rate of at least three (3) cubic yards of soil amendment
per one thousand (1,000) square feet of landscape area. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 4 Comment Originated: 03/20/2013
03/20/2013: Consider using a tree that is more upright than Ginalla Maple in the 5 foot
landscape area between the parking lot and the sidewalk. Red Barron Crabapple is more
upright and could be considered as a replacement. NOTED, SEE UPDATED DRAWINGS.
Department: Current Planning
Contact: Sherry Albertson -Clark, 970.224-6174, salbettson-clark@fcgov.com
Topic: Building Elevations
Comment Number:1 Comment Originated: 03/11/2013
The minimum building height is 20' in the TOD. Building two does not appear to meet this
standard. REFERENCE ELEVATIONS, THE BUILDINGS ARE 38' & 26' h. +- .
Comment Number: 2 Comment Originated: 03/11/2013
The minimum glazing requirements (60% on ground floor, 40% on upper floor) appear to be
met for both buildings. NOTED.
Comment Number: 3 Comment Originated: 03/22/2013
The materials legend has something missing on the last two materials (brick? and ?).
'BRICK & STONE MASONRY', NOTED & CORRECTED.
Comment Number: 4 Comment Originated: 03/22/2013
Articulation is required in exterior building walls. Building 2 shows as a rectangular footprint on
the site plan, but the architectural elevations show some articulation - please clarify.
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 5 Comment Originated: 03/22/2013
The commercial building standards (Section 3.5.(6) require that all facades have a recognizable
base and top. The base may consist of thicker walls, ledges or sills; integrally textured
materials such as stone or other masonry; integrally colored and patterned materials such as
smooth -finished stone or tile; lighter or darker colored materials, mullions or panels; or panels.
Please provide information on how the base is being achieved. NOTED, SEE UPDATED DRAWINGS.
Topic: General
Comment Number:1 Comment Originated: 03/11/2013
This project was submitted as a combined PDP and FP, which should be noted on the site and
landscape plans and architectural elevations. NOTED, SEE UPDATED DRAWINGS.
Topic: Landscape Plans
Comment Number:1 Comment Originated: 03/11/2013
The scale on the landscape plan appears to be 1 "/30' (rather than 1 "/69).Tree diversity, water
budget, and interior parking lot landscaping are within the prescribed standards. NOTED & CORRECTED.
Comment Number: 2 Comment Originated: 03/11/2013
The parking spaces along Boardwalk and Mason need to be screened from at least 75% of the
light from headlights, to a minimum height of 30" for at least 70% of the length of the parking
area along the street. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 3 Comment Originated: 03/11/2013
Additional street trees (2) should be provided on the Boardwalk frontage, near the corner of
Mason Street. NOTED, SEE UPDATED DRAWINGS.
3
Topic: Lighting Plan
Comment Number:1 Comment Originated: 03/11/2013
The Luminaire Locations table on the photometric plan should be revised to show the correct
number of each fixture (should read 3 AA2 and 9 WIN fixtures).Topic: Site Plan
NOTED IN LUMINAIRE SCHEDULE.
Comment Number:1 Comment Originated: 03/11/2013
Parking numbers are within the allowable maximum number of spaces; however, there are 2
HC spaces shown on the plans, so the parking data should be revised to show this. The
spaces along Mason Street extend out closer to the street than Building 1 by several feet.
Section 3.10.4 of the TOD requires that parking not be located between the street and the front or
side of a building. A modification to this standard could be requested if parking is ultimately
proposed as shown on the plan. A MODIFICATION HAS BEEN REQUESTED.
Comment Number: 2 Comment Originated: 03/11/2013
The setback for the parking along Mason Street (an arterial street) is 15' from back of r-o-w. If
there is no way to provide this setback, a modification to this standard could be requested.
A MODIFICATION HAS BEEN REQUESTED.
Comment Number: 3 Comment Originated: 03/11/2013
Please clarify on the trash enclosure note how materials and/or colors of the enclosure will be
complementary to the proposed buildings. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 4 Comment Originated: 03/11/2013
Both the C-G district and the TOD require buildings be oriented toward streets rather than
toward parking lots. Providing walkway connections out to the streets (as shown on the site
plan), as well as entrances and storefronts oriented toward the streets will help address this
standard. Building one appears to have at least some entrances oriented to the streets but
Building two shows west elevations with and without doors along Mason.
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 5 Comment Originated: 03/11/2013
The CG district and TOD require that pedestrian -oriented outdoor spaces be placed next to
activity areas (ie. shops, offices, street comers, etc.). The area at the SE comer of Building 2
appears to be a plaza area. Please clarify the intent of this area and how it would serve as an
activity/outdoor space. NOTED, PLAZA LOCATED AT NORTH BUILDING #1.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970.221.6501, tsiegmund@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 03/22/2013
03/22/2013: Please add note 11 on sheet C4 to sheet C3 as well and reference remove and
replace curb and gutter at the sidewalk chase location. (Add note- Remove and replace 6" (�
vertical curb and gutter per City of Fort Collins construction detail 701 on sheet C3) V
NOTED, SEE UPDATED DRAWINGS
4
'�"^ V
Comment Number: 3 Comment Originated. 03/22/2013 �'
03/22/2013: Please dimension and label the parkway along Mason St to be 1Oft on sheet C3.
Dimension and label the parkway to be 1Oft on x-section B-13 swell. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 4 Comment Originated: 03/22/2013 a
03/22/2013: Update x-session A -A, the north side of Boardwalk has detached sidewalk
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 5 Comment Originated: 03/22/2013
03/22/2013: Please show the handicap ramp that is to be built with this project at the south �i
entrance off of Mason St. This should be our standard directional ramp to accept pedestrians t�
from the south NOTED, SEE UPDATED DRAWINGS.
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 03/22/2013
03/22/2013: Add asphalt patching limits around the north ramp configuration as asphalt patching
will most likely be required with construction of the ramps. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 7 Comment Originated: 03/22/2013
03/22/2013: Please update the symbols for the water meter pit on both buildings. Currently the UOsymbol reads a sewer manhole where the water meter pit symbol should be.
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 8 Comment Originated: 03/22/2013
03/22/2013: Update the 30 foot Access easement on the south entrance to read 30 foot utility
and access easement (per the plat). Please update this on sheets C3 and C4
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 9 Comment Originated: 03/22/2013
03/22/2013: Please update the following details on sheets C5 and C6 to our most current
drawings:
-LCUASS drawing 1601- standard sidewalk V/
-LCUASS drawing 1602- sidewalk detail ✓ 06k
-LCUASS drawing 1607- Truncated Dome Warning for Access Ramps
-LCUASS drawing 1606- Pedestrian Ramp Detail (not drawing 1606(a)) a/
-COFC Water Wastewater drawing- concrete sidewalk culvert detail D-1213 V
NOTED, SEE UPDATED DRAWINGS.
Comment Number:10 Comment Originated: 03/22/2013
03/22/2013: It is not clear why LCUASS detail 2501- Sidewalk widening details on sheet C5 is
included. Please remove from details sheet or label as on -site if widening of the sidewalk is
UL
happening interior to the site. NOTED, SEE UPDATED DRAWINGS.
Topic: Plat
Comment Number:1 Comment Originated: 03/22/2013
03/22/2013: The easements shown on the plat are very confusing to follow and to determine
the limits of each easement. Please clearly identify the limits of each easement shown on the
plat. NOTED, SEE UPDATED DRAWINGS.
5
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex@fcgov.com
Topic: General
Comment Number:1 Comment Originated: 03/18/2013
03/18/2013: No comments.
Department: Light And Power
Contact: Doug Martine, 970.224-6152, dmartine@fcgov.com
Topic: General
Comment Number:1 Comment Originated: 03/06/2013
03/06/2013: The developer will need to coordinate power requirements and electric
development charges with Light & Power Engineering at (970)221-6700. NOTED.
Comment Number: 2 Comment Originated: 03/06/2013
03/06/2013: After the plans are final, an AutoCAD drawing (version 2008) of the site plan will
need to be sent to Terry Cox at TCOXeFCGOV.COM. NOTED.
Department: Park Planning
Contact: Craig Foreman, 970.221.6618, cforeman@fcgov.com
Topic: General
Comment Number: I Comment Originated: 03/01/2013
03/01 /2013: No comments
Department: PFA
Contact: Jim Lynxwiler, 970.416.2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 01 Comment Originated: 03/20/2013
03/20/2013: FIRE LANES
Fire Lanes shall be designated on the plat as an Emergency Access Easement.
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 02 Comment Originated: 03/20/2013
03/20/2013: STRUCTURES EXCEEDING 30' (OR THREE OR MORE STORIES) IN HEIGHT
In order to accommodate aerial fire apparatus access, required fire lanes shall be 30 foot wide
minimum on at least one long side of the building. At least one of the required access routes
meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet
from the building, and shall be positioned parallel to one entire side of the building.
2006 International Fire Code Appendix D; Poudre Fire Authority Administrative Policy 85-5.
This requirement may be offset by a NFPA13 sprinkler system.
NOTED, THE STRUCTURES WILL BE FULLY SPRINKLELRED.
Comment Number: 03 Comment Originated: 03/20/2013
03/20/2013: FIRE CONTAINMENT
Buildings exceeding 5000 square feet and shall be sprinklered or fire contained. If containment
is used, the containment construction shall be reviewed and approved by the Poudre Fire
Authority prior to installation. NOTED, THE STRUCTURES WILL BE FULLY SPRINKLELRED.
Comment Number: 04 Comment Originated: 03/20/2013
03/20/2013: KEY BOXES REQUIRED
Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in approved
location(s) on every new building equipped with a required fire sprinkler or fire alarm system.
The top shall not be higher than 6 feet above finished floor.
2006 International Fire Code 506.1 and Poudre Fire Authority Bureau Policy 88-20 NOTED.
Comment Number: 05 Comment Originated: 03/20/2013
03/20/2013: FDC
Fire Department Connections shall be installed in accordance with NFPA standards. Fire
department connections shall be located on the street side of buildings, fully visible and
recognizable from the street or nearest point of fire department vehicle access. The location of
7
the FDC shall be approved by the fire department. 2006 International Fire Code 912.2 NOTED.
Comment Number: 06 Comment Originated: 03/20/2013
03/20/2013: PREMISE IDENTIFICATION
New and existing buildings shall be plainly identified. Address numbers shall be visible from
the street fronting the property, plainly visible, and posted with a minimum of six-inch numerals
on a contrasting background. 2006 International Fire Code 505.1 NOTED.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416.2418, vAamarque@fcgov.com
Topic: General
Comment Number:1 Comment Originated: 03/15/2013
03/15/2013: Stormwater is ready for a hearing.
Comment Number: 2 Comment Originated: 03/15/2013
03/15/2013: Minor comments may apply at final compliance.
Department: Technical Services
Contact: Jeff County, 970.221.6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 22 Comment Originated: 03/21/2013
03/21/2013: No comments.
Topic: Construction Drawings
Comment Number: 24 Comment Originated: 03/21/2013
03/21/2013: Please correct the number and description of benchmark E-322 on all sheets it is
shown on. This description does not match the NGS description that is published. NOTED.
Comment Number: 25 Comment Originated: 03/21/2013
03/21/2013: Please change the sheet descriptions in the index on sheet C1. They do not
match the actual sheet titles. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 26 Comment Originated: 03/21/2013
03/21/2013: Please move the street names and data into the right of way on sheets C3 & C4.
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 27 Comment Originated: 03/21/2013
03/21/2013: There are line over text issues on sheet C4 NOTED, SEE UPDATED DRAWINGS.
Comment Number: 28 Comment Originated: 03/21/2013
03/21/2013: Please change General Note #3 to reflect the new Plat (replat) being recorded for
this project. NOTED, SEE UPDATED DRAWINGS.
Topic: Landscape Plans
Comment Number: 21 Comment Originated: 03/21/2013
03/21/2013: There are line over text issues on sheet 2. NOTED, SEE UPDATED DRAWINGS.
0
Topic: Lighting Plan
Comment Number: 23 Comment Originated: 03/21/2013
03/21/2013: Please change the title to "Boardwalk Crossing At Mason Street", to match the
other sheets in the plan set. NOTED, SEE UPDATED DRAWINGS.
Topic: Plat
Comment Number:1 Comment Originated: 03/21/2013
03/21/2013: The boundary and legal description close.
Comment Number: 2 Comment Originated: 03/21/2013
03/21/2013: Please change the name of the Plat to "Boardwalk Crossing, Filing 3". NOTED, SEE UPDATED
DRAWINGS.
Comment Number: 3 Comment Originated: 03/21/2013
03/21/2013: Please add "Being a" to the existing title, and make all of that text the sub -title in
smaller size. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 4 Comment Originated: 03/21/2013
03/21/2013: Please add a border to the sheet. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 5 Comment Originated: 03/21/2013
03/21/2013: All easements (existing or proposed) must be shown with enough bearing &
distance or curve information to establish their position. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 6 Comment Originated: 03/21/2013
03/21/2013: Please label all properties surrounding the Plat as unplatted or if platted with the
subdivision plat name. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 7 Comment Originated: 03/21/2013
03/21/2013: Please label all easements with the size and reception numbers.
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 8 Comment Originated: 03/21/2013
03/21/2013: Please label the Basis Of Bearings. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 9 Comment Originated: 03/21/2013
03/21/2013: If the easement line marked up on Lot 2 is part of the vacated drainage easement,
please remove it. NOTED, SEE UPDATED DRAWINGS.
Comment Number:10 Comment Originated: 03/21/2013
03/21/2013: You may want to hatch access and/or drainage easements for clarity.
NOTED, SEE UPDATED DRAWINGS.
Comment Number:11 Comment Originated: 03/21/2013
03/21/2013: The square footage for the Boardwalk Crossing Filing 2 plat is 77154. This does
not match the square footage shown. NOTED, SEE UPDATED DRAWINGS.
10
Fo`tyrt Collins
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.8750
970.224.6134 - fax
fcgov.com
January 18, 2013
Steve Steinbicker
Architecture West, LCC
4710 S College Ave
Fort Collins, CO 80525
Re: 4012 S Mason St - Boardwalk Crossing Office/Retail
Description of project: This is a request to review the previously approved and expired Boardwalk
Crossing project development plan (PDP) located southeast of the intersection of Boardwalk Drive and
South Mason Street (Parcel #s 97351-58-001 & 973510580992). Changes requested to the original PDP
include lot line adjustments for new property/legal boundaries and an increase of 2,000 square feet to the
northwestern building containing office/retail. The site is located in the General Commercial District (C-G) and
retail/office is subject to administrative (Type 1) review.
Please see the following summary of comments regarding the project request referenced above. The
comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be made at the
time of formal review of this project. If you have any questions regarding these comments or the next steps in
the review process, you may contact the individual commenter or direct your questions through the Project
Planner, Sherry Albertson -Clark, at 970-224-6174 or salbertson-cark@fcgov.com.
Comment Summary:
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbealsb-fcgov.com
1. Land Use Code (LUC) 3.2.2(K)(5) There needs to be at least one accessible vehicle space per each of
the undeveloped lots that are being created. These spaces are required to be van accessible, located
near the primary entrance of the building and designated by a sign.
LUC 3.2.2(J) Requires vehicle use areas to be setback 15ft landscaped area from an arterial ROW line.
This would mean the parking spaces along Mason would need to be setback 15ft.
2. LUC 3.2.2(C)(4) Bicycle parking is required for each of the undeveloped lots that are being created (see
section for requirements).
3. Please label the dimensions of the landscaped areas and sidewalks that have vehicle overhang.
Comment Number:12 Comment Originated: 03/21/2013
03/21/2013: Are there any Lienholders for this property? If so, please add the Lienholder
signature block. THERE ARE NO LIENHOLDERS.
Comment Number:13 Comment Originated: 03/21/2013
03/21/2013: Please explain the "row easement" at the south end of the property. What type of
easement is it and to whom is it dedicated. NOTED, SEE UPDATED DRAWINGS.
Comment Number:14 Comment Originated: 03/21/2013
03/21/2013: All easements must be shown, regardless of the client's wishes. See Board Rules
6.5.2 and 6.10 and C.R.S. 38-51-106(b). NOTED, SEE UPDATED DRAWINGS.
Comment Number:15 Comment Originated: 03/21/2013
03/21/2013: Is there a title commitment for the subject property? PREVIOUSLY SUBMITTED.
Comment Number:16 Comment Originated: 03/21/2013
03/21/2013: Notes 7.9 appear to be ALTA or Land Survey Plat notes. Please remove.
NOTED, SEE UPDATED DRAWINGS.
Comment Number:17 Comment Originated: 03/21/2013
03/21/2013: Please correct the client's name in the title block.
NOTED, SEE UPDATED DRAWINGS.
Topic: Site Plan
Comment Number:18 Comment Originated: 03/21/2013
03/21/2013: The legal description does not match the Subdivision Plat. Please change to
match. NOTED, SEE UPDATED DRAWINGS,
Comment Number:19 Comment Originated: 03/21/2013
03/21/2013: There are line over text issues on sheet 1. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 20 Comment Originated: 03/21/2013
03/21/2013: The square footage shown for the lots does not match the Subdivision Plat.
Please change to match. NOTED, SEE UPDATED DRAWINGS.
Department: Traffic Operation
Contact: Ward Stanford, 970-221.6820, wstanford@fcgov.com
Topic: Construction Drawings
Comment Number: I Comment Originated: 03/18/2013
03/18/2013: The S&S Notes (and any other on other sheets if applicable) need to be revised
to state the "City Traffic Engineer" at each instance where the notes state "Local Entity"
engineer. The Signing and Striping installation is overseen by the City TE (or designate) versus
the City Engineer (or designate). NOTED, SEE UPDATED DRAWINGS.
Comment Number: 2 Comment Originated: 03/18/2013
03/18/2013: Please verify the City's comer sight distance criteria is met at the Mason
11
intersections. NOTED, SEE UPDATED DRAWINGS.
Comment Number: 3 Comment Originated: 03/21/2013
TIS accepted.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number:1 Comment Originated: 03/12/2013
03/12/2013: On Boardwalk, is there a conflict between the storm drain and the fire line? Will a
lowering be needed on the fire line? NOTED, SEE UPDATED DRAWINGS.
Comment Number: 2 Comment Originated: 03/12/2013
03/12/2013: PVC can be used for fire lines. If used, tracer wire is required, and the Standard
Details for tracer wire (30) and locator stations (25) need to be included.
NOTED, SEE UPDATED DRAWINGS.
Department: Zoning
Contact: Noah Beals, 970-416.2313, nbeals@fcgov.com
Topic: General
Comment Number:1 Comment Originated: 03/19/2013
03/19/2013: Land Use Code (LUC) 3.2.2(C)(4) The north building with 6000 sq ft of retail and
6000 sq ft of office is required the minimum of 8 bicycle spaces. Two of these spaces are required to be
covered and the rest fixed.
The south building with 5500 sq ft of retail is required 4 bicycle spaces. One of these is
required to be covered and the rest fixed.
All spaces shall be located close to pedestrian entrances of the building.
Site plan needs to indicate how many bikes spaces are available at each bike rack.
NOTED, SEE UPDATED DRAWINGS.
Comment Number: 2 Comment Originated: 03/19/2013
03/19/2013: In addition to the required modification request stated by Current Planning an
additional modification would be needed for the East side of drive aisle along the east property
line LUC 3.2.2(J) requires a 5ft landscape area between vehicle use areas and lot line.
A MODIFICATION HAS BEEN REQUESTED.
12
City of
F6rt Collins
July 17, 2013
Steve Steinbicker
Architecture West, LLC
4710 S. College Ave.
Fort Collins, CO 80525
RE: Boardwalk Crossing at Mason Street, FDP130003, Round Number 4
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 -fax
fcgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Pete Wray, at 970-221-6754 or pwray@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Sheri Langenberger, 970.221.6573, slangenberuer0fcaov.com
Topic: General
Comment Number: 11 Comment Originated: 03/28/2013
03/28/2013: The project owes an additional $146.04 for TDRF. The fee submittal did not account for
the total area being replated.
Contact: Tyler Siegmund, 970-221.6501, tsieamund@fcgov.com
Topic: General
Comment Number: 12 Comment Originated: 05/01/2013
05/01/2013: Please add a note to the overall utility plan (sheet C3) the specifies the handicap ramp
openings match the width of the sidewalk, or 6ft wide handicap ramp openings to match the width of
the sidewalk.
Department: Forestry
Contact: Tim Buchanan, 970-221.6361, tbuchananDfcaov.com
Topic: Landscape Plans -
647 d4X 6n��,
Page 1 of 4
Comment Number: 5
05/02/2013:
Please replace planting note #11 with the following:
Comment Originated: 05/0212013
A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are
planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and
curb, medians and other city property. This permit shall approve the location and species to be
planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate
of occupancy.
Please add the following statement as an additional Planting Note:
The developer shall contact the City Forester to inspect all street tree plantings at the completion of
each phase of the development. All trees need to have been installed as shown on the landscape
plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain
approval by the City Forester for street trees in a phase shall result in a hold on certificate of
occupancy for future phases of the development.
Department: Light And Power
Contact: Doug Martine, 970.224.6152, dmartineDfcaov.com
Topic: General
Comment Originated: 0310612013
Comment Number: 2
03/06/2013: After the plans are final, an Autocad drawing (version 2008) of the site plan will need to be
sent to Terry Cox at TCOX@FCGOV.COM.
Department: PFA
Contact: Jim Lynxwiler, 970.416.2869, jlynxwiler(�goudre•fire.ora
Topic: General
Comment Originated: 0312012013
Comment Number: 01
03/20/2013: FIRE LANES
Fire Lanes shall be designated on the plat as "Emergency Access Easement", not "access
easement" or "vehicular access easement".
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, isschiam@fcaov.com
Topic: Erosion. Control
Comment Originated: 07117/2013
Comment Number: 4
07/17/2013: Erosion Control Report was not included. Sequence Planning needed some work please
use the sequence of construction vs the BMPs to clarify the needed BMPs. Dumpster Facility is too
Close to the Inlets high likelihood of waste material going to the stormsewer.
Department: Technical Services
Contact: Jeff County, 970-221.6588, icounty(Mcaov.com
Topic: Building Elevations
Page 2 of 4
Comment Number: 22
07/11/2013: No comments.
05/01/2013: No comments.
03/21/2013: No comments.
Topic: Lighting Plan
Comment Number: 32
07/11/2013: No comments.
Comment Originated: 03/21/2013
Comment Originated: 07/11/2013
Topic: Plat
Comment Number: 1 Comment Originated: 03/21/2013
03/21/2013: The boundary and legal description close.
d'"Gk� nJQ� Comment Number: 16 Comment Originated: 03/21/2013
07/11/2013: Repeat Comment: Please remove notes 5 -7 from the Plat.
owe 05/01 /2013: These are now Notes 5-7, and have not been addressed. Please remove.
1 03/21/2013: Notes 7-9 appear to be ALTA or Land Survey Plat notes. Please remove.
�( Comment Number: 31 Comment Originated: 07/11/2013
07/11/2013: Please change the Plat name in the Statement Of Ownership And Subdivision back to
match the title. See redlines.
Topic: Site Plan
Comment Number: 19 Comment Originated: 03/21/2013
07/11/2013: There are still line over text issues, and a cut off text issue. See redlines.
05/01 /2013: There are still line over text issues.
03/21/2013: There are line over text issues on sheet 1.
Department: Traffic Operation
Contact: Ward Stanford, 970-221.6820, wstanford[a)fcoov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 03/18/2013
03/18/2013: The S&S Notes (and any other on other sheets if applicable) need to be revised to state
the "City Traffic Engineer" at each instance where the notes state "Local Entity" engineer. The Signing
and Striping installation is overseen by the City TE (or designate) versus the City Engineer (or
designate).
Comment Number: 2 Comment Originated: 03/18/2013
03/18/2013: Please verify the City's corner sight distance criteria is met at the Mason intersections.
Topic: Traffic Impact Study
Comment Number: 3
TIS accepted.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffington0fcgov.com
Topic: General
Comment Number: 1
07/16/2013: No comments.
Comment Originated: 03/21/2013
Comment Originated: 07/16/2013
Page 3 of 4
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeaisOfceov.com
Topic: General
Comment Number: 3 Comment Originated: 07/16/2013
07/16/2013: Please add notes to the site plan under General Notes that reference the approved
Modifications.
Page 4 of 4
4. LUC 3.2.5 An enclosure is required that is adequate for both trash and recycling. Such enclosure shall
be designed with walk-in access without having to open the main service gate and located on a concrete
pad that is at least 20ft away from a public sidewalk.
If the enclosure is intended to serve both lots then a note on the plans is required explaining this use.
S. LUC 3.2.1 An updated/new landscape plan is required (see section for details).
LUC 3.2.4 An updated/new lighting plan is required this should include by not limited to a photometric
site plan complete with catalog cut sheets (see section for other details).
6. LUC 3.5.1(1) Plans (site, landscape and elevations) shall identify locations of the Mechanical/Utility
equipment (vents, flues, meters, RTU/ac, conduit...) and include notes on how such equipment is
painted/screened.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221-6854, rbuffington(cc0cgov.com
1. Existing water mains and sanitary sewers in this area include 8-inch water mains and 8-inch sewers in
Boardwalk, Mason and the ENV drive to the south.
2. Existing water mains and sanitary sewers in this area include 8-inch water mains and 8-inch sewers in
Boardwalk, Mason and the E/W drive to the south.
3. If any restaurants are included in the development, grease interceptors will be required.
4. If any restaurants are included in the development, grease interceptors will be required.
5. The water conservation standards for landscape and irrigation will apply. Information on these
requirements can be found at: http://www.fcgov.com/standards
6. The water conservation standards for landscape and irrigation will apply. Information on these
requirements can be found at: http://www.fcgov.com/standards
7. Development fees and water rights will be due at building permit. The development fees will include a
sewer repay for the Warren Lake Trunk sewer.
8. Development fees and water rights will be due at building permit. The development fees will include a
sewer repay for the Warren Lake Trunk sewer.
Department: Stormwater Engineering
Contact: Glen Schlueter, 970.224.6065, gschlueterbfcgov.com
1. This site had a project approved on it previously. Please resubmit the drainage and erosion control
report along with the construction plan set.
2. Water quality and quantity requirements have not changed but the Stormwater Utility anticipates that City
Council will be approving new Low Impact Development (LID) requirements that will go into effect in mid
February 2013. Please contact Basil Hamdan at 224-6035 or bhamdan@fcgov.com for more information.
The present draft requires that 50% of the new impervious area must be treated by an LID method and
25% of new parking lots must be pervious.
3. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious
area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for
` w J
existing impervious area. These fees are to be paid at the time each building permit is issued.
Information on fees can be found on the City's web site at
http:llwww.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or
contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow
required before the Development Construction permit is issued. The amount of the escrow is
determined by the design engineer, and is based on the site disturbance area, cost of the measures, or
a minimum amount in accordance with the Fort Collins Stormwater Design Criteria.
4. The design of this site must conform to the drainage basin design of the Mail Creek Master Plan Update
as well the City's Design Criteria and Construction standards.
Department: Park Planning
Contact: Craig Foreman, 970.221.6618, cforemanCc#.fcaov.com
1. 1.11712013: No comments.
Department: Fire Authority
Contact: Jim Lynxwiler, 970.416.2869, olynxwileApoudre-fire.org
1. FIRE LANES
Fire Lanes shall be provided for every facility, building or portion of a building when any portion of the
facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from
fire apparatus access, as measured by an approved route around the exterior of the building or facility.
The fire code official is authorized to increase the dimension of 150 feet if the building is equipped
throughout with an approved, automatic fire -sprinkler system.
2006 International Fire Code 503.1.1
2. FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria
already contained in relevant standards and policies, any new fire lane must meet the following general
requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width* & 14 foot minimum overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
> Be visible by painting and signage, and maintained unobstructed at all times.
*STRUCTURES THREE OR MORE STORIES IN HEIGHT
Required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one
of the required access routes meeting this condition shall be located within a minimum of 15 feet and a
maximum of 30 feet from the building, and shall be positioned parallel to on entire side of the building.
2006 International Fire Code 503.2.3, 503.3, 503.4 and Appendix D
3. FIRE CONTAINMENT
Buildings exceeding 5000 square feet shall be sprinklered or fire contained. If containment is used, the
containment construction shall be reviewed and approved by the Poudre Fire Authority prior to
installation.
4. WATER SUPPLY
Fire hydrants must be the type approved by the water district having jurisdiction and the Fire Department.
Hydrant spacing and flow must meet minimum requirements based on type of occupancy.
Commercial requirements: Hydrants to provide 1,500 gpm at 20 psi residual pressure, spaced not further
than 300 feet to the building, on 600-foot centers thereafter.
2006 International Fire Code 508.1 and Appendix B
5. PREMISE IDENTIFICATION
New and existing buildings shall be plainly identified. Address numbers shall be visible from the street
fronting the property, plainly visible, and posted with a minimum of six-inch numerals on a contrasting
background.
2006 International Fire Code 505.1
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex(@-fcgov.com
1. While this site is within 500' of a Natural Habitat or Feature, the requirement for an ECS (as per Section
3.4.1(D) of the Land Use Code) has been waived with the approval of the Director for the following
reasons:
1. The project is separated from any natural features, e.g., a wetland over 1/3 of an acre and an irrigation
ditch, by a distance greater than the buffer standard should it be applied and by Mason Street, and
2. The site does not have any known natural habitat value.
2. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4)
protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree
having DBH (Diameter at Breast Height) of six inches or more. If any trees on site have a DBH of greater
than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221 6361) to
determine the status of the existing trees and any mitigation requirements as the result of development
impacts.
3. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3),
requires that you use native plants and grasses in your landscaping or re landscaping and reduce
bluegrass lawns as much as possible.
4. The City's green building program has many programs that may benefit your project. Resources are
available at the Green Building web page: http://www.fcgov.com/greenbuilding/. Of particular interest
may be the Integrated Design Assistance Program, which offers financial incentives and free technical
support to those interested in delivering high performance buildings that exceed building code
requirements for energy performance. Gary Schroeder (970 221 6395) is the contact person for this
program. This is the direct link to the web page for this program: http://www.fcgov.com/conservation/biz
idap.php.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970.221.6501, tsiegmund(Zi).fcoov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit.
Please contact Matt Baker at 224-6108 if you have any questions.
2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced
or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of Occupancy.
4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting and
determine if a traffic study is needed for this project. In addition, please contact Transportation Planning
for their requirements as well.
5. A 6 ft detached sidewalk and 10 ft wide landscaped parkway along Mason St and a 5 ft detached
sidewalk and 8 ft wide landscaped parkway along Boardwalk will be required with this project. All public
improvements must be designed and built in accordance with the Larimer County Urban Area Street
Standards (LCUASS). They are available online at:
http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
6. This project is responsible for dedicating any right-of-way and easements that are necessary for this
project.
7. Utility plans will be required and a Development Agreement will be recorded once the project is
finalized.
8. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site.
Department: Electric Engineering
Contact: Alan Rutz, 970.224.6153, arutz(&-fcgov.com
1. Electric Development Charges will apply to lots 2A and 2B.
2. Submit C-1 form with load requirements and coordinate transformer locations with Light and Power.
Current Planning
Contact: Sherry Albertson -Clark, 970.224.6174, slbertson-clark(c fcoov.com
1. Since the property is proposed to be subdivided, adequate parking should be provided for all portions of
the site and cross easements maybe needed. Parking maximums for vehicles are 4:1,000 SF for retail
and 3:1,000 SF for general office.
2. Bicycle parking requirements for office and retail use are 1 space/4,000 square feet of GFA or
not less than 4 spaces. Of the bicycle parking, 20% must be enclosed and 80% in fixed bicycle racks.
3. The site is within the TOD, so these standards will apply. The previously -approved project may already
address a number of these in the approved design. Of particular importance are the character and image
standards of Section 3.10.5. The intent of this district is to encourage land uses, densities and design that
will enhance and support the transit stations along the Mason Corridor and include buildings that are oriented
toward the pedestrian. The landscaped parking setback along an arterial street (see Zoning comment # 1)
was required in the LUC when the original project was approved and there was apparently not a modification
approved for this standard. If this standard cannot be met with the proposed project design, a modification
could be requested.
4. Buildings in the TOD have a minimum height of 20' (measured to dominant roof line). See Section 3.10.5.17
for more detail in measuring height for this particular standard.
5. Office and retail uses are a Type 1 review in the General Commercial District, as long as the retail
component is less than 25,000 SF (current proposal is less than this amount of retail).
6. The proposed development project is subject to a Type 1 review and public hearing, the decision maker
for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is
not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to
notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and
location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid
potential issues that may occur later in the review process.
7. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
8. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards. The entire LUC is available for your review on
the web at http:l/www.colocode.com/ftcollins/landuse/begin.htm.
9. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard
Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of
the LUC for more information on criteria to apply for a Modification of Standard.
10. Please seethe Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
11. The request will be subject to the Development Review Fee Schedule that is available in the Community
Development and Neighborhood Services office. The fees are due at the time of submittal of the required
documents for the appropriate development review process by City staff and affected outside reviewing
agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal.
12. When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.
Pre -Submittal Meetinas for Building Permits.
Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi -family proiects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early to
mid -design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting.
Applicants of new commercial or multi -family projects are advised to call 416-2341 to schedule a
pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and
I
elevations and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2009 International Building Code (IBC)
2009 International Residential Code (IRC)
2009 International Energy Conservation Code (IECC)
2009 International Mechanical Code (IMC)
2009 International Fuel Gas Code (IFGC)
2009 International Plumbing Code (IPC) as amended by the State of Colorado
2011 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2003.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Death: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 20091RC Chapter 11 or 2009 IECC Chapter 4
2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4.
3. Commercial and Multi -family 4 stories and taller: 2009 IECC Chapter 5.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these requirements
can be obtained at the Building Office or contact the above phone number.
City of Fort Collins
Building Services
Plan Review
416-2341
BOARDWALK CROSSING OFFICE / RETAIL
4012 S. MASON STREET
RESPONSE TO CONCEPTUAL REVIEW COMMENTS
JANUARY 18, 2013 ( Meeting 1.14.13)
ZONING
ARCHITECTURE
WEST, L.L.C.
ARCH ITECTURE/PLAN NI NO
1. ACCESSIBLE PARKING; Each lot has provided for one handicap van accessible parking space.
2. BICYCLE PARKING; The required covered and open bike parking has been provided on site.
3. PARKING OVERHANGS; Walk and landscape dimensions have been provided at on the plan.
4. TRASH / RECYCLE; There is an existing shared & screened trash/recycle enclosure on the site.
S. LANDSCAPE/LIGHITNG PLANS; Noted, required and provided.
6. MECHANICAL/UTILITY; Metal roof screens have been provided for mechanical unit screening,
as required to comply with the LUC requirements.
WATER -WASTEWATER ENGINEERING (items inadvertently duplicated)
1. EXISTING WATER & SANITARY; The project will tie into the existing water/sewer services.
2. RESTAURANTS; If restaurants are included as users in the development, they may require
grease interceptors.
3. WATER CONSERVATION; The landscape plan will provide water conserving planting materials
and irrigation systems, as required.
4. DEVELOPMENT FEES; This project will be responsible to pay for all applicable fees and re -pays.
STORMWATER ENGINEERING
1. DRAINAGE & EROSION CONTROL; A drainage & erosion control report has been submitted for
review.
2. WATER QUALITY; Water quality/quantity requirements have been incorporated in the design.
3. STORMWATER FEES; This project will be responsible to pay for all applicable fees and re -pays.
4. DRAINAGE BASIN; This site has been designed to comply with the Mail Creek Drainage req'ts. .
FIRE AUTHORITY
1. FIRE LANES; All buildings will an approved fire lane access.
2. FIRE CONTAINMENT; All buildings will be provided with a NFPA 13R fire -suppression system.
3. FIRE STANDPIPE SYSTEM; Not applicable, following further discussions.